Equipment department annual work report 5 articles

#Report# Introduction A work report is a report on the work situation, practice, experience and problems of the unit, department and region to the higher authorities. The following is Organized annual work report of the equipment department, welcome to read!

1. Equipment Department annual work report

One, the first half of the work summary

In the blink of an eye, 20xx year has gone half, on the first six months of work to do a summary, from which to find their own shortcomings and shortcomings, in the future work to improve, in order to improve their own work level. In these months of personal work, they have not done enough. From the overall work of the Ministry of Equipment, although the team has improved personal awareness, work has improved, but still far from reaching their expected results. In the second half of the year to make a breakthrough.

According to the status quo of the work in the last six months, integrated themselves and the department and the company to make the following summary:

1, treating the equipment renovation aspects of the head but not the tail, do the work of three-minute fever, treating the work is also very challenging, but do things not too thorough, can be used even if all's well, do not pay much attention to the appearance of the effect as well as the long-term tracking of the use of the effect.

2, the first half of the installation of more tasks, with the East to complete the installation of two 765 new generation of pasta production line, the whole process with the Ministry of infrastructure to complete the pasta workshop water, electricity installation work. In the installation process due to lack of experience made mistakes, problems. The work stoppage caused by the lack of detailed planning increased the workload of the supply department. These are invariably higher installation costs.

3, maintenance process due to lack of personal maintenance experience caused by the loss of more, especially in the electrical aspects of fewer people, not very professional, not accurate enough to determine the problem.

4, maintenance program is not perfect, arbitrary. Although the first half of the workshop production equipment operation rate is relatively high, these are relying on hard to come out, pay too much labor intensity, too big.

5, in terms of security, the first half of the workshop injuries more often. Most of them are due to insufficient safety measures for workshop equipment or poor knowledge of workers' safety and protection, due to insufficient understanding of the equipment. Although the employees are operating against the rules, but there is always a way to avoid.

These problems are caused by the service work can not keep up and affect the normal production of the workshop reasons, we need to promote the company to improve the system, improve personal ability and teamwork to complete the annual sales task.

Second, the second half of the work plan

The first half of the year has ended, and now mainly start the second half of the year, the second half of the year, we should be more than one way to attack, and do a good job in the department and assist the Ministry of Production to do a good job of staff training. Resolutely complete the annual sales target.

Individual work plan: in the second half of 20xx to complete the first half of the unfinished "equipment files"; to start learning inverter maintenance; adhere to the supervision of the development of maintenance plans and maintenance records are filled out.

The second half of the work carried out in the preliminary idea

1, equipment operation target: no downtime in addition to the planned shutdown.

2, the evening shift to increase a person on duty, that is to say, the evening equipment department has two people to work, the requirements of something to do, there is work to do. Handle the problem more timely, the service is more in place.

3, more professional skills training. Previously, we have also mentioned many times, are often hanging on the mouth, but there is no practical to adhere to, always within the find a reason for themselves.

4, equipment integrity rate of 100%. Problems in a timely manner, the fastest speed, never delay.

5, the equipment department of all personnel to learn to open the equipment, adjust the equipment. And require knowledge of the production process, everyone is a multi-faceted. Because these are the prerequisite elements of maintenance equipment.

We need to strengthen the concept of service, to timely understand the needs of the production line staff. Understand the use of their equipment, often visit, let them put forward the lack of equipment and what kind of equipment they want to use, as far as possible to meet them. Encounter problems, special treatment of special situations, more guidance, less temper. Let each employee feel that we attach great importance to them, so that each employee like us, deepen understanding and increase trust. According to the first half of the situation, I hope that the company in the second half of the main solution to the following problems:

First, the training problem:

1, the staff of the production equipment knowledge is too little. Of course, the staff turnover is the main reason, but we do do a little less in the equipment training. Now the phenomenon is that they just open the equipment, open the bad we repair, even if it is against the rules. I think if the training in this area is strengthened, the operation and integrity of the equipment will be beneficial, and more importantly, will avoid personal safety accidents.

2, the training of staff quality. We all know that the difference between a good employee and a poor employee and the impact on the company. Good employees are trained.

Second, the dormitory problem:

Here to put forward is the dormitory electricity problem. Now our dormitory management is chaotic, dormitory items not to mention, private pulling wire problem is also more serious, there is a relatively large security risks. Because of their pulling wires caused by short circuit, often caused by the entire dormitory building blackout or cause a floor blackout, or cause the wires to burn out.

Third, other inter-departmental cooperation issues:

Good results need the support of the company's various departments, these need to be completed with the assistance of all of us, we as a smaller service department of the company, is obliged to provide you with a good quality service, but at the same time also need the full support of the various departments with.

2. Equipment Department annual work report

Time flies, full of harvest 20xx year is about to pass, summarize this year's equipment management work to basically complete the company's predetermined equipment management work plan and equipment repair and maintenance plan of the indexes, the equipment did not have a major problem, there are no major safety incidents and equipment safety accidents. Personal safety accidents and equipment safety accidents, now on the specific work to do the following work summary:

First, the beginning of the production of busy play the efficiency of the old equipment

This year, I re-opened the team - drilling rigs, - drilling rigs are old equipment, the safety factor is low, the equipment is relatively outdated, but the workers are more familiar with this set of equipment, the use of the more comfortable, and the old equipment is very full of its own grinding in place, fixed, the equipment has not been a major equipment accidents. There have been no major equipment accidents. From the usual production management, each well before drilling equipment safety inspection is an important part of the equipment management work, in the complete statistics of the inspection of the rectification content of the proposed at the same time, the rectification of the proposed rectification of the problem of the same day to organize the rectification of the rectification of the rectification of the problem can not be immediately rectified, through the written form of timely reflection to the relevant departments is a very important work. I team in strict accordance with this standard and requirements, high efficiency to play equipment performance, smooth production. in July, 70 drilling rigs in the branch stream installation trial run, so that my team re-contact - drilling rigs, once again installed - d drilling rigs found a lot of problems, a long time of the equipment packing, so that some of the equipment can not be a smooth operation, the team in the debugging and installation of the equipment in the process of the problem of the discussion of the deployment of, and ultimately complete the installation of new equipment, commissioning and put into operation. Equipment installation and commissioning work; Second, the staff rusty operation, can not be quickly transformed. Another in the daily operation of the equipment in the process to do regular regular tracking and inspection. Eliminate equipment safety hazards. Make my team installation, production of both.

Second, the project strict circuit inspection to ensure that the equipment care in place

x month, the company to develop extra-territorial projects, my team to take over the -x wells, this is a great news, this is to enhance the level of the team's great opportunity, but at the same time very challenging, as far as equipment is concerned, there are mainly the following problems: First, long-distance handling of the equipment with a certain degree of destructive, and the second is the difficulty of equipment installation and commissioning, and installation time is long and heavy. Firstly, long distance transportation is destructive to the equipment, secondly, there are difficulties in installing and commissioning the equipment, and the installation time is long, the weight is heavy and there are many dangerous factors. However, our team insisted on high requirements, standardized operation, plus the staff's efforts to overcome the difficulties and finally successfully opened -x well. And the most critical condition is that the team's equipment maintenance, maintenance work to the point as well as the previous branch stream test installation work to the point.

This year, the team did not have any equipment accidents caused by maintenance not in place, not in time, or over-protection, leakage of protection. At the same time, the team focused on increasing the implementation of various systems in equipment management. For the post sitting duty and tour inspection requirements is the most important, team meetings emphasize the importance of deep well sitting duty system, need to bear in mind the importance of a good operating environment for the equipment. The implementation of a series of measures to make the team's extra-territorial projects to maintain a good state of construction.

Third, Qi quasi full equipment operation information to ensure that the equipment can be found

Reporting information standardized fill in the record to ensure that the equipment in the normal maintenance cycle to get good maintenance, related to the entire production process of safe and reliable. And as a basis, can be traced.

Fourth, to improve the ideological awareness of workers, from a subjective point of view to set up the equipment management center of thought

Equipment, like the human body, usually carefully care, so that the long term health, such as waiting until the problem and then overhaul the whole, is bound to affect the reliability of the equipment as well as the efficiency of the operation. Ideological understanding is extremely important, all the problems can be attributed to the personnel of the ideological understanding is not in place. Neglect of duty, there is a sense of fluke, this is the hidden danger. Every class before and after the meeting, I have emphasized the importance of ideological awareness, equipment is dead, the human brain is alive, out of the problem is not a problem of equipment, but the problem of people.

In short, from the implementation of equipment management, to have a good production situation this year, but also an important means of attracting investment, not everything is ready only lack of the east wind, down-to-earth, steady progress, is the right choice.

3. Equipment Department annual work report

Annual summary of the work:

Equipment and Power Department of the work functions originally under the Ministry of Production Equipment, with the installation of the work of the full-scale and dynamic, static equipment, electrical appliances, instrumentation, the operation of the project section of the commissioning of the trial production work start-up operation, completion of the finishing information, and other work to promote the work of the Ministry. The advancement of the work, in order to adapt to the needs of equipment management, improve efficiency and coordination and communication between departments, to ensure the safe and stable operation of trial production work, the company set up on July 27, 20xx equipment power department, is responsible for the plant's mechanical, electrical, instrumentation management, is now summarized as follows:

Production Equipment Department during the period of the main participation in the management of the plant's equipment installation Work progress, quality and installation process progress, quality of key aspects of the supervision, implementation work, to assist the project team to solve all kinds of problems in the construction, so that the overall progress of the project to move forward in an orderly manner. Focused on the management and supervision of the company's "1 # project" power plant outside the pipeline construction and installation work. In order to complete this work in time for the company to open up the gas source, repeatedly organized special meetings on the construction program, quality, progress of coordination, implementation, supervision. Problems found in the construction of timely detection and timely solution, and coordination of the overall project, with the supervision company *** with the arrangement of personnel throughout the supervision and management, to ensure the successful completion of the work for the subsequent operation of the gas machine and pipeline blowing work to lay the foundation. Secondly, the company's "2# project" air separation installation project, "3# project" gasification system installation project in the installation of oxygen pipeline construction and degreasing treatment of the construction unit to put forward strict quality requirements, and require the relevant project team to focus on supervision, supervision The company will review and control, **** with the construction progress of the important pipeline to promote. In addition, also has a single trial conditions of the project organization of the three check four work, the problems identified one by one to implement its measures to solve and deal with the problem, to ensure that the problems found correctly and timely treatment, do not miss a link, and rectification is completed to have the conditions of the workshop process to participate in the acceptance. Also initially developed the data finishing archiving management, and require the project team equipment specialists to actively cooperate with the completion of the initial data finishing work on schedule.

Since the establishment of the Department of Equipment and Power, facing the whole plant installation of the end of the work and blowing, the start of the test work. In order to ensure the quality of the pipeline installation of the construction unit, so that the process pipeline can be safe and stable operation, the company's leadership visionary requirements of the equipment power department to arrange for the testing company to enter the field of the construction unit of the pipeline installation quality sampling. Through the sampling inspection, the problems and welding defects of each construction unit were detected. Jiangdu construction of high-pressure steam pipeline welding quality in the sampling under strict control to ensure that according to the design requirements of strict construction to ensure the quality of Sichuan air fraction of oxygen pipeline major quality hazards have been found in a timely manner, and according to the design requirements of the re-construction in order to ensure the quality of thirteen chemical construction of the ammonia pipeline, overhaul of the workshop's gas pipeline, as well as the welding quality of other process pipelines are also corresponding to get under control to ensure the quality of the inspection, to eliminate the potential for process piping. The test eliminated potential hazards and dangers of process piping, avoiding the occurrence of major accidents, equipment and power department of the construction of the units not in accordance with the requirements of the punishment, for the company to save losses.

High-pressure steam pipeline and the whole plant pipeline blowing work began to start, equipment and power of the Department of all personnel throughout the supervision of the progress, quality, along the fixed bracket, sliding bracket, guiding bracket, expansion joints size location and other related items to check, put forward reasonable modifications, issued a notice of rectification to arrange for rectification of the construction unit, and rectified items for checking and inspection. At the same time in order to ensure the construction quality of all kinds of stents provided by the manufacturer of special materials for spectral analysis and testing, part of the unqualified parts detected, and timely replacement. The construction quality has played a strict role in checking, for the safe implementation of the blowing work to do a strength.

Since the start of the running equipment installation and commissioning of compressors, pumps, valves, frequent failure, each commissioning equipment, the Department of Power has attached great importance to the emergence of equipment failure to organize specialists and maintenance staff to seriously analyze the causes of failure, active coordination and timely communication with manufacturers and workshops to find out the failure to develop a revised program, the organization of the maintenance of the key faults of the hidden trouble overnight overtime repair, and will never be delayed. For the trial production work to win the time, in order to ensure the continuous and stable operation of the production requirements of the workshop to check the spare parts and stand-alone operation of the machine pumps in a timely manner to put forward the procurement plan, with ready to deal with the replacement of maintenance conditions. Failure of static equipment in a timely manner and workshop process operators to communicate to determine the location of the failure, the problem is not big enough to repair and deal with the rapid notification of manufacturers to develop the repair construction process and program, and send people to deal with timely to ensure the quality of the construction, and at the same time to identify the cause of the failure of the future stable operation of equipment and the use of the basis for any problems caused by the manufacturer's quality should be documented, according to the company's requirements to do Corresponding treatment. The commissioning stage of the various sectors of the district leakage work actively participate in coordinating the construction units, maintenance workshop to complete the leakage processing work in a timely manner, the whole day at any time there is a problem at any time to deal with, for the company to create a good driving conditions.

Insulation work as a follow-up to the construction of the key to the equipment power department for comprehensive management and supervision, supervision. As the insulation work involves a wide range, but also more messy, the construction staff is more dispersed, the construction team cross operation, both pipeline and pipeline between the insulation butt and pipeline and equipment between the insulation butt and instrumentation pipeline supporting butt, but also requires the construction does not affect the various workshops of the test work, in order to be able to effectively cooperate with the workshop to complete the work of the Department of my special organization of the work of insulation conference, to the construction units The department specially organizes the meeting of heat preservation work, and gives the request to the construction unit, under the premise of normal heat preservation construction, wherever there is an urgent need for heat preservation, as long as the workshop puts forward the plan and request to send people to work immediately, and will never delay, so as to avoid the influence of the weather cooling down or other reasons on the test car. Construction unit every construction period of time I adjusted according to the needs of the scene at any time to re-organize the insulation special meeting and set up new tasks, some do not do according to the requirements of the construction team issued a rectification notice, violation of the provisions of the fine to be dealt with, the implementation of these measures to promote the progress of insulation work.

Organization of the plant's safety valve calibration and calibration of measuring instruments, safety valve calibration work has been completed, the calibration of measuring instruments has been completed the calibration of pressure gauges, other work is in progress. The equipment and power department of the management of special equipment information and plant equipment ledger information to urge the equipment specialists to speed up the collection and finishing in a timely manner, for the next step in the work of certification and archiving work to get ready. For the management characteristics of the equipment power department developed a compilation of equipment management system, so that the plant's equipment management into a formal management program, this system has been reported to the leaders in charge of the review to be approved.

Equipment power department should strengthen the internal safety education management and safety awareness training, improve the safety awareness of departmental managers, the safety of the equipment as the focus of management to grasp, never slack. Eliminate the occurrence of safety accidents within the jurisdiction of the Ministry of Equipment and Power. Strengthen the team construction of the equipment power department, through the actual situation encountered in the work, lead the staff deep into the post for practical operation exercises, theory combined with practice of practical learning and training of staff to improve the technical level, improve the ability to deal with problems and solve problems. Develop corresponding encouragement of innovation mechanism, so that each employee recognizes the importance of improving the technical quality and transformation and innovation, so that each employee gets exercise and development. At the same time to strengthen the staff's sense of group honor training, improve the ability to collaborate with each other, so that the equipment and power department to become an efficient team. Although we have done a lot of work and made some achievements, but should also fully recognize the shortcomings of the work, should strengthen their own learning more with other departments to communicate and exchange, improve themselves in practice. Guarantee equipment maintenance in place in a timely manner to reduce production delays, improve the lubrication management of equipment, reduce the failure rate of equipment, seize the time to continue to improve the equipment management system of the Ministry of documents and rules and regulations and the introduction of various types of accounts.

Second, next year's work plan arrangement

(1) work plan

1, the introduction of equipment management system, management forms, and various assessment plans.

2, according to the development of the equipment management system to promote the work, the development of assessment and management work.

3, organized, according to the plan to implement equipment maintenance, to ensure the normal operation of production.

4, accelerate the transformation of process facilities and equipment to promote production efficiency.

5, strengthen the basic management of equipment, strengthen the site management.

(2) work objectives

1, to eliminate the occurrence of personal safety management accidents.

2, to ensure the quality of equipment maintenance, and equipment integrity rate.

3, timely completion of equipment repair and maintenance program.

4, installation, maintenance, renovation projects completed in a timely manner and high quality.

5, strengthen technological innovation, energy saving, strengthen team building.

In short, in the upcoming new year, all employees of the Department of Equipment and Power will be full of enthusiasm, positive, healthy mindset into work, summarize the experience of the previous year, correct the deficiencies, strengthen the management awareness, people-oriented no matter what problems we encountered, we will be positively confronted. Build our team into a responsible, dare to meet the challenges, and constantly strive to innovate, in the practice of work to raise awareness and improve themselves.

4. Equipment Department annual work report

20xx year is nearing the end of the work, looking back at the year that is about to pass, under the guidance and help of the leadership of the department, seriously do a good job in the installation and acceptance of the equipment, maintenance, repair and management work, to be able to be responsible for the maintenance of the department's equipment, regular maintenance, the work is relatively smooth, and made a good job of the installation and acceptance of the equipment, maintenance, repair and management work. Work carried out relatively smoothly, made some achievements, now I 20xx annual work is summarized as follows:

1, equipment inspection, installation, maintenance, repair

In this year, in accordance with the requirements of the leadership of the section, the regular inspection of equipment, maintenance work; conscientiously do a good job in charge of the installation of equipment in the section; for the emergence of malfunctioning equipment, timely repair; for the emergence of faults, and can not deal with their own problems, the problem is that they can not deal with. Failure, and their own problems can not be dealt with, contact the manufacturer in a timely manner after-sales service for maintenance and processing; 20xx year maintenance, maintenance of specific details are as follows:

In accordance with the requirements of the hospital, the department's equipment and its management work on a regular basis to carry out quality inspections for the inspection of the problems that exist in a timely manner to point out, and let it improve.

2, theoretical learning, skills enhancement

In politics, seriously study the country's various guidelines, routes, policies, as well as laws and regulations, and conscientiously implement, seriously study the hospital's rules and regulations, and conscientiously comply with them; in the business, efforts to learn the professional field of knowledge, and strive to improve their own professional and technical skills, for their own difficulties in solving problems, and humbly ask for advice from others, on time to attend the meeting. To others, on time to participate in the leadership of the bidding activities and outside the study mission, to understand the latest medical equipment products and the latest technology, and seriously study, improve their own business level and knowledge structure.

3, the need to improve the aspects

I have made certain achievements at the same time, there is also a need to further improve the place, through the work of the year, I y realize that their equipment management, repair, maintenance, there is still a lot of lack of place, in the work of the communication and coordination with the Department of the ability to be further strengthened; in the business, some of the equipment repair, maintenance knowledge is not very understanding, but also the ability to improve the quality of life. Repair, maintenance knowledge is not very understanding, need to further study. These aspects are to be focused on the next year's work to improve.

In short, in 20xx year, although I have made great achievements, but there are many shortcomings, in the upcoming year, I need to further strengthen the business knowledge learning, and strive to improve their professional and technical level, and strive to make greater achievements in the upcoming year, and to be able to rely on their own efforts for the development of hospitals in 20xx year to contribute to their own part. The hospital will be able to contribute to the development of the hospital in 20xx with its own efforts.

5. Equipment Department annual work report

Engaged in the company's equipment, facilities repair, maintenance work, the company's 20xxx x months since the trial operation, experienced x months of frost, rain, snow, heat and winter; in the company's business team under the leadership of the company to break through the barriers and obstacles, ushered in xxxxx today's vigorous development. As an ordinary employee, can participate in this magnificent masterpiece, experience this more than a year of extraordinary course, my life is no longer ordinary, and it is precisely for this reason, in the usual work, I continue to actively study the corporate culture and professional skills, with the corporate culture of self-cultivation, improve the ideological awareness, and professional skills to arm themselves to improve the level of business. In the leadership of the care of the teaching and support of colleagues to help, to overcome the maintenance team, not enough personnel, and other aspects of the difficulties, to carry forward the dedication, dedication and love of excellent character, and soon into the role of the normal production of xxxx to make outstanding contributions to the work of the company's performance has been recognized by the leader.

First, the content of the work

1, the engineering construction of the remaining problems in the inspection, tracking and maintenance.

2, to ensure the safe operation of equipment and facilities and strengthen the facilities and equipment security checks, maintenance and repair work, the development of work plans, the implementation of the plan content, completion time and responsible person, as well as the inspection time, a clear focus on the various tasks, to ensure that the facilities and equipment safe operation.

3, strict control of the operation of equipment, and strive to save energy and reduce consumption, in terms of energy saving, the main work this year is to strengthen the maintenance of equipment, control the operating time and parameters of the equipment, as well as environmental requirements, in order to achieve the purpose of energy saving and reduction of consumption.

4, pay attention to the management of fire equipment and facilities, through their own efforts to repair fire equipment on the fire alarm linkage system to carry out a comprehensive inspection, listing each alarm probe, point by point testing, to find out the problem. Carry out maintenance to eliminate faults.

5, the development of the year's maintenance work plan and maintenance work standards.

6, in conjunction with the Ministry of Finance, the establishment of a minimum inventory of engineering materials in the warehouse to ensure the supply of maintenance materials.

7, in the daily work, maintenance of equipment, safety standards operation and strengthen the awareness of self-safety precautions, to eliminate the occurrence of work-related accidents.

Second, work achievements

1, central air conditioning

My company *** with x xx air conditioning mainframe, 20xx x month x day. I checked on the roof of the building found x air conditioning host has been alarm, troubleshooting can not be found, checking the x air conditioning host pressure self-protection pot burst, resulting in x air conditioning host unit can not run normally, automatic water replenishment system, inverter bad, I contacted the after-sales engineers and equipment manufacturers xx after . They checked in detail x air conditioning host found that the unit within the stainless steel plate for cracks, the compressor refrigeration system in the refrigerant liquid leakage, x air conditioning host unit reason host pressure self-protection pot in the air conditioning water circulation system is not stable when it will burst. Solution: 1. To add a 0.5 cubic meters of high level water tank high level float automatic replenishment exhaust water tank to solve the air conditioning water circulation system is not stable, poor pressure, air exhaust, air conditioning water circulation system will never run out of water these problems. 2. To buy 4 bottles of refrigerant. 3 to re-exchange a plate for a. The cost of the water tank x yuan, refrigerant leakage in the main body pressure self-protection pot will burst. Water tank cost x dollars, refrigerant xx years on the roof leakage, hot kitchen equipment x cable grounding problems have been effectively resolved. Specialty garage, storage room re-do waterproof layer, hot kitchen equipment x cables replaced with new cables.

2, fire system

so that the fire alarm linkage system and fire water supply system integrity rate to remain above x%, fire alarm probe trouble-free rate to remain above x%.

3, the maintenance team in last year's work on the basis of this year's division of labor to develop

detailed facilities and equipment maintenance plan, the plan is broken down to each month, the development of a detailed maintenance of the work content and standards, the implementation of the implementation of the people to ensure that the quality and efficiency of the work.

Through a year of hard work, I have made a little achievement, but still need to continue to work hard, with the times. I will continue to summarize and introspection, constantly spurring themselves and enrich themselves, improve personal cultivation and business level, in order to adapt to the times and the development of enterprises, and the company *** with progress, *** with growth, for the company's brilliant tomorrow to make greater contributions.