In the high-grade ERP software will be set up in the BOM (Bill of Materials) in a variety of raw materials, semi-finished products in the case of attributes, production management to achieve the chemical and pharmaceutical co-products, by-products, recycled materials for statistical and cost analysis. And the process, the equipment should be relatively stable, otherwise each processing may be recycled solvent quantity is different. If the ERP software design time did not consider these, then it can not be set and selected. So please directly find the industry's better software or general ERP in the middle and high end products. If it is Kingdee ERP you need to start from K3 wise, K3 rise are not. The same UFIDA is not to be lower than U8.