What is the process of renovating a rough house in Jiaxing?

(a) tools in place, ready

Before the renovation, a few things that must be ready to put in your bag. Tape measure (buy 5m, do not 3m), calculator, large board clip (clip sheets, receipts with); in addition, it is best to prepare early in the site of the old towels (soft cotton of the kind of brick rubbing bricks with), plastic bags (wrapped around the pipeline interface, to prevent the blockage of dirt)

(ii) choose the auspicious day, cannon start

Before the workers enter the field, it is best to the home of the corners personally Measure once, take a pen and ruler to write down, mark clearly, must must not be lazy. Measurements mainly include:

1, clear area involved in the decoration process. In particular, tile area, wall paint area, wallpaper area, floor area;

2, clear main wall size. Especially the size of the wall that needs to be designed to place furniture later.

Should go to buy radiators

(C) the main body demolition and reform, make the space more practical

the main body demolition and reform is one of the first on a project, mainly including the demolition of the wall, masonry, shoveling the wall, demolition of the heater, change the plastic steel windows and so on. After the demolition of the garbage, to timely clean out, to ensure the cleanliness of the interior, but also to facilitate the construction.

At this point, it is time to set the finished door

This time it is best to cabinets, hoods, stoves, water heaters shop through, and can be determined

(D) water and electricity remodeling, arranging the use of each space

Water and electricity remodeling, there is no regret to eat medicine. Brick on the wall, ceiling a letter, and then want to add sockets can be difficult. So, be sure to determine the exact location of switches, lamps, basins, bathtubs, washing machines and so on.

Water and electricity before the transformation, cabinet designers should come to the door for the first measurement, to help you determine a good power, water transformation program.

Water heater, it is also best to send someone to design the location of the power supply and interface according to the model you have identified.

Remind you oh: the wall under the water basin, it is best to leave power outlets, easy to install KitchenAid.

The air conditioning hole and power supply try to put on this wall at the head of the bed, to avoid future air conditioning blowing directly on people.

Strong power and weak power to keep 20 centimeters apart, for example, sockets and network cables to leave a distance of 20 centimeters between.

(E) Wrap the riser, wrap the unsightly pipes

Considering the easily moist and humid environment of the kitchen and bathroom, the material for wrapping the riser must not be used with wood keel! We must be careful, even if the wood keel on the brush anticorrosive coating will not work.

Remember, the package riser with light steel keel, or red brick. Light steel keel saves space, but the strongest and best is red brick.

This time you need to buy good tiles, hooks and so on

Furniture to be set early, leave a good period of time, usually at least 15 days

(F) tiling, the first thing with a solid texture

Tiling before, to buy a good floor drain.

Note: to buy a special washing machine or shower floor drain, and to anti-odor function.

After waterproofing and pulling, you are ready to tile.

In addition to normal tiling attention, tile soaking, drying; broken tiles left to cut, simply put, is on the wall of the brick, the width can not be less than 10 centimeters below. Tiling often have to encounter this situation, for example, 1 meter wall width, brick for 32 * 32cm, normal paste method, 3 whole 1 small. However, 32 × 3 = 96, but also set aside 1 centimeter of hook space, the last remaining small brick can only paste 3cm wide.

As long as you talk to the master tiler in advance, the brick on the wall, wide can not be less than 10 centimeters below. He will cut bricks on both sides. Or just give an example of a 1-meter wide wall, it becomes 2 whole 2 small. 32 × 2 = 64, reserved 1 centimeter hook joints, the two sides of the small brick 17.5cm on each side. In this way, it looks not only symmetrical on both sides, but also the whole wall will not have a narrow one there in the way.

This time should determine the basin, faucet, and about to ask the cabinet designer for the second visit

At the same time to buy paint (mixed or clear), wall paint, nitro paint, diluted water, such as wallpaper, but also to set up

(7) oiler on the battlefield, scrubbing scrubbing scrubbing brush

If you don't buy a finished door, then let the master workers do it.

Note: Any carpentry work, even if only to do the pass, be sure to follow this step, large core board sinking, veneer veneer, and then only on the paint. Do mixed oil, there is the kind of irresponsible workers, lazy, directly on the core board brush oil, this is absolutely wrong. Don't believe the individual selling the core board nonsense, directly on the top of the brush oil are no problem. Remember, directly brush oil, not long, all have to crack, remember to remember.

Now do mixed oil, do not have to brush, but with the spray. Best, let the workers to the inside of the door, the meter box and sprayed with white, not waste but also beautiful.

Brush wall nothing to say, leveling, sanding, rolling brush, the effect is good, absolutely rely on your home oiler's craft.

We need to remind you, if the wall to brush the color, color mixing must pay attention to, mixing out the color to be lighter than the color card, can not be the same as the color card or deeper than it, or you will be regretted. Because of painting the wall at least two times top coat, some also three times, the color of the wall will be a layer than a layer of deep.

About the painting method is spraying or rolling, the benevolent see benevolence, the wise see wisdom. My home is rolled, never tried to spray. It is said that spraying is better, but once there is damage to be repainted, it will become very difficult.

(H) wallpaper, beautiful walls

The wallpaper than paint, the effect is much, much better.

After the wall paint brush, the oilman will be in the need to paste wallpaper in the place of nitro paint, paint every other day can be dry, and then you can ask the master to paste wallpaper.

Note: wallpaper paste 48 hours do not open the window ventilation, let it slowly dry.

To say goodbye to the master, individual places warped, if you want to trouble him to help to repair it.

At this point, it is time to buy panels, sockets, lamps and lanterns

(IX) Installation of socket panels

Socket panels can be installed in about half a day.

Remind you: 1, it is best to buy a socket with switch function, especially in the kitchen, so that rice cookers, microwave ovens can be exempted from plugging and unplugging the power supply, the switch can be controlled.

2, although the socket with a switch is good, but pay attention to the practicality. According to my observation, five-hole power supply with a switch, three outlets are flat, once your appliances need to be round three, there will be empty sockets with a plug board depressing situation. Therefore, the multi-outlet must also be, even if it does not have a switch control!

At this time, should purchase bathroom kitchen ceiling

At this time, such as the need to install bathtubs, please purchase and install before the ceiling

(10) kitchen and bathroom ceiling, sealing up the last unsightly part

First installed water heater and bathtubs, installed, the ceiling sealing edge in order to better half-wrapping the water heater, that is, a more beautiful articulation la.

Note: 1, it is best to buy aluminum buckle ceiling, even after many years of demolition, sell scrap aluminum are worth a lot of money. On the contrary, pvc buckle good-looking, but the quality, performance are average, and plastic things even if you sell scrap are not worth a few dollars.

2, buy buckle plate, to ask the price of the whole package, do not buckle plate, corner to buy. But the installation fee is calculated separately.

(XI) installation of cabinets, the birth of a beautiful whole kitchen

Cabinets are a tie-in project, should be arranged in advance about the hood, stove and sink. It is best to send the same day and install the cabinets at the same time.

Talk to the cabinet maker in advance, and bring the artificial stone countertops cut down the position of the stove and sink together, wrapping a water meter, piping and so on, very useful.

(xii) installation of finished door

The finished door should be installed before the floor, mainly because of the complexity of the steps to install the door, hinges, door locks, door suction, door frame, etc., the use of many tools, such as the first installation of flooring, bumping and bumping is difficult to avoid.

(xiii) installation of drying racks, curtain rods, lamps, sanitary ware, sanitary hardware

It is recommended that before installing the floor, these cinder blocks scattered more than one project to get done.

(xiv) install the floor

Floor must be done before installing the leveling, did not expect, the floor paved, the aisle a walk a deflated, very depressing. Had to take down, take fast dip powder leveling after resurfacing.

Prepare a little pepper beforehand, do not buy the floor workers to bring the so-called insecticidal powder, let them along the kick corner sprinkled on the line.

Make sure to ask the workers not to cut the floor in the house, the hallway to cut, and finally clean the hallway on it.

(xv) installation of radiators

Decoration to the end, the most negligent.

Must be clear in advance with the said, the installation of the single stamp such as not the manufacturer's chapter, will not be signed.

Pay attention to the installation of radiators, (not the purchase order), who is the part of the seal? A lot of this is the operation, the purchase order is stamped with the manufacturer's chapter; installation order is stamped with the installation team's chapter. In this way, the so-called "guarantee × × years" is only the radiator itself, but the material is either steel or copper aluminum, as long as the factory almost no quality problems. The most problematic place is the installation! If you agree with the installation team's chapter, it basically means that you give up the right to make the manufacturer responsible. Once there is a soaked floor, flooded home accidents, the manufacturer absolutely shirk responsibility, the installation team is simply impossible to find people. The so-called warranty can only be borne by the user.

(16) open cleaning

The biggest embodiment of cleaning, I think is to wipe the glass. So high up in the building, climb outside to wipe yourself, is a frightening thing. Next is the floor waxing, wax to buy their own, cheap and okay to use, but be sure to use the cleaning of the waxing machine, the efficiency of dozens, hundreds of times faster than manual.

The rest of the aspects, I do not feel the need to rely too much on cleaning, they also take a small blade here and there scraping, not so spiritual.

So, after the cleaning, it is best to carry out the detailed cleaning again. Go to the supermarket to buy a packet of "five clean powder", get a few old towels. With old towels, dipped in dry five clean powder, from the pass to the door, from the tiles to the kick corner, a house to a house wipe, do not be lazy, the results will definitely make you proud.

(XVII) furniture, home appliances into the field

Fresh new home, the brunt of the furniture. Beds, mattresses, closets, shoe cabinets, sofas, dining tables and so on.

Remind you: before the furniture into the field, should be prepared for the following items: disposable shoe covers (do not buy poor quality, step on the broken), a few boxes of activated charcoal, ladders, floor protection film (handling closet, TV cabinets, etc., it is best to do a protection of the floor).

If you buy a fabric bed, remind you to see if the fabric can be taken down all the way. Because I really can't stand the static electricity of chemical fiber, the next day I want to take down the original cloth cover by myself, go to customize a set of cotton, found that the cloth cover is made too long, was nailed into the bed box to go. The worker was lazy and thought I wouldn't remove the cover for a year and a half. I don't know if other people's homes have this experience, anyway, the worker master the next day and ran a trip, dead heavy bed dismantling some quite troublesome. Appliances hurry delivery, tight or not in a hurry to wait to talk about it. Anyway, the appliances are more and more advanced, cheaper and cheaper.