In today's developing world, more and more scenes and occasions need to use contracts. Signing a contract can encourage both parties to promise and perform cooperation in a standardized way. So do you know how to write a legal contract? The following is a sample of labor subcontracting agreement I collected for you (4 copies in total). Welcome to read, and I hope you will like it.
Labor subcontracting agreement 1 Party A:
Party B:
Due to the needs of the project, Party A subcontracts the work to Party B for construction. In order to safeguard the rights and interests of both parties and clarify their responsibilities, rights and obligations, both parties reached the following agreement through consultation:
I. Project name:
Second, the project site selection
Third, the contracting method: single contractor:
IV. Contents of the contract:
Verb (abbreviation for verb) Work content and unit price:
1. Installation of septic tanks connected to municipal sewage pipes in living quarters.
2. The labor cost of each package is 30, 0 yuan/m (excluding any mechanical and material costs).
3. Check the borehole straightness 1, 0 m 80 and 0 yuan/m.
6. Payment method: All the project funds shall be settled within two weeks after the project is completed.
Seven, the time limit for a project and personnel requirements strive to be completed before April 30, xx.
Eight. Safety requirements: if an accident happens to Party B's construction personnel at Party A's construction site, Party B shall bear the medical expenses below 200 0 yuan and Party A shall bear the medical expenses above 200 0 yuan; If Party B does not obey Party A's safety management or wear safety facilities, all safety medical accidents will be borne by Party B. ..
Nine, quality requirements
1, and the visual quality shall be implemented according to the current acceptance specifications;
2. Clean up the site after work and take care of the finished products.
X. Other matters not covered shall be settled by both parties through consultation.
XI。 In case of any dispute during the performance of the contract, both parties agree to mediate with the competent construction department. If mediation fails, both parties agree to submit the dispute to the arbitration commission.
Twelve, in duplicate, each party holds one copy: this contract will automatically become invalid after the payment is completed.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Labor Subcontracting Agreement 2 Party A:
Party B:
Due to the needs of the project, Party A subcontracts the channel project of this bid section to Party B for construction. In order to safeguard the rights and interests of both parties, the following agreement is reached through negotiation:
1. Contracting method: single contractor.
Second, the work content and unit price:
1, channel, labor cost per package RMB/m;
2. Channels, the labor cost per package is RMB/m;
3. Channels, the labor cost per package is RMB/m;
4. Channels, the labor cost per package is RMB/m;
5. Channels, the labor cost per package is RMB/m;
6. Channels, the labor cost per package is RMB/m;
7, channel, single package labor cost yuan/meter;
8. Channels, the labor cost per package is RMB/m;
9. Channels, the labor cost per package is RMB/meter. Three. Payment terms:
Fourth, the time limit for a project and personnel requirements should be completed within years, months and days.
Verb (abbreviation of verb) safety requirements: Party B's construction personnel have an accident at Party A's construction site, and the medical expenses shall be borne by Party B. ..
Six, quality requirements
The visual quality shall be implemented in accordance with the acceptance specifications and current acceptance specifications; All channels and other projects made by Party B are guaranteed to pass the acceptance of agricultural comprehensive counties, cities and provinces; Clean up the site after work and take care of the finished products.
Seven. Other matters not covered shall be settled by both parties through consultation.
Eight, in duplicate, each party holds one copy: this contract will automatically become invalid after the payment is completed.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Labor Subcontract Agreement 3 Employer (full name): Gansu Tongcheng Engineering Construction Co., Ltd.
Contractor (full name):
According to the Management Regulations on Single Project Contracting within the Company and the Construction Project Contract signed by our company (winning the bid), the following terms and conditions are reached on the specific matters of this project contracting, please * * * * abide by them.
I. Project name:
Second, the project content:
III. Contents of the contract:
1, project cost:
External budget value: xx yuan
Labor cost (see agreement): xx yuan.
Material cost (see details): xx yuan.
Mechanical fee: xx yuan
Branch management fee: xx yuan
Taxes:
Project profit: xx yuan
(Note: The above figures are budget prices, which will be adjusted according to Party A's final accounts)
2. Term of the contract:
Year, month, day ~ year.
3, project quality:
(1) quality grade:
(2) Quality management:
The contractor shall carry out the construction in strict accordance with the construction drawings, contracts, changes, minutes and national engineering quality acceptance standards. Fully implement the ISO 9001-20xx-20xx quality management system, and carry out quality management in strict accordance with the procedures in the quality manual. Each team or project department shall set up full-time quality inspectors to supervise and inspect key projects and key working procedures, and check all kinds of inspection applications and inspection procedures. In case of quality accident, it shall be handled according to Management Regulations of Engineering Quality Award and Punishment Rules of Gansu Tongcheng Engineering Construction Co., Ltd. Before the project is completed, it must be accepted by the Quality and Technology Department before diplomatic service can be carried out.
4, safety in production:
The contractor shall strictly abide by the Regulations on the Administration of Work Safety in Construction Projects, implement the standard of JGJ59-99, and carry out the construction within the scope permitted by the work safety license. According to the safety production management system of Gansu Tongcheng Engineering Construction Co., Ltd., we must:
(1) Before the commencement of construction, the contractor shall cooperate with the safety management department to purchase engineering accident insurance according to the construction contract.
(2) Establish a responsibility system for production safety, determine safety objectives, formulate safety technical measures as required, conduct safety technical disclosure, and formulate safety emergency rescue plans.
(3) Strictly implement the pre-job three-level safety education system, so that the assessment, education and records are complete.
(4) Conduct safety education for subcontractors and labor suppliers in accordance with Management Rules for Foreign Construction Teams and Temporary Employment. After passing the examination, the person in charge will sign a safety production contract, accept safety supervision within the scope of the contract, and organize civilized construction in strict accordance with safety standards.
(5) When a safety accident occurs, it shall be handled according to the safety management system of Gansu Tongcheng Engineering Construction Co., Ltd. ... The safety accident of the subcontractor's labor service supplier team shall be recorded in the contractor's safety assessment without discrimination.
(6) Complete the safety records of each stage on schedule. When the project is completed, the safety evaluation book shall be compiled and completed.
5, civilized construction:
The contractor shall strictly abide by the Interim Provisions on the Management of Civilized Construction of Construction Projects in Gansu Province (documentNo. Gan Jianshe [20xx]33 1).
(1) Site appearance: according to the requirements of civilized construction, site fences, passages, site signs, site yard layout, site roads, working surfaces and ground shall be set.
(2) Management of materials and tools: The maintenance of construction tools should meet the requirements of basic standards.
(3) Environmental sanitation: In order to prevent air pollution, waterproof pollution and noise pollution in the construction site, measures should be taken to strengthen the management of toilets and drinking water in the construction site.
(4) comprehensive management; Governance and safety, civilized construction education, finished product protection, employees' compliance with laws and regulations, and dormitory management should all meet the standards.
(5) Fire fighting: Fire fighting and facilities on site are fully equipped, relevant procedures are handled in time, and the fire fighting management system is strictly implemented. In the process of construction, Party B shall be responsible for the fire accidents caused by Party B's violation of fire laws and regulations.
Four, the project price payment:
1, the contractor must complete the examination and approval procedures of the project progress payment according to the standard.
2. The employer and the contractor jointly dunning. After the project payment is in place, the contractor will give priority.
Verb (short for verb) Other:
1, the contractor shall accept the supervision of all departments of the head office and strictly abide by the company's management systems. If it violates the company's regulations, it will be deducted from the expenses of the branch company.
2. This contract is made in six copies, with the Employer (General Office 1, Planning and Operation Department 1, Quality Management Department 1, Safety Management Department 1) and the Contractor 1 holding five copies each.
Attachment:
1, personnel list of project department
2. Budget and final accounts (including materials)
3, the subcontract team agreement
Owner: Gansu Tongcheng Engineering Construction Co., Ltd.
Representative: xx
Contractor: xx
Representative: xx
Supervision unit: xx
Planning and Operation Department: xx
Quality and Technology Department: xx
Safety management department: xx
Xx,xx,xx,XX
Labor Subcontract Agreement 4 Employer (hereinafter referred to as Party A): ID number:
Contractor (hereinafter referred to as Party B): ID number:
Party A entrusts the labor contract of the existing project to Party B.. In order to clarify the respective rights, responsibilities and obligations of both parties, Party A and Party B sign this contract through friendly negotiation according to the specific conditions of this project, and both parties must abide by it.
Article 1 General situation of the project
1 and 1 Project location:
Project contents of 1 and 3:
4. 1 contract method: labor contract (including labor, auxiliary materials, machinery, hoisting, secondary handling, loading and unloading vehicles, etc.). )
4.2 Project cost: RMB (in words);
3. Contract duration 1: calendar days.
Article 5 Party A's responsibilities
Before the project starts, Party A shall educate and explain to Party B about quality, safety, technology, construction period, material saving, fire control, public security, civilized construction on site, site management and labor discipline, and provide Party B with housing; Party A shall ensure the timely supply of materials, and shall not affect the construction due to the untimely supply of materials, conduct quality inspection and inspection on the completed sub-projects in time, and pay the project payment in full and on time as stipulated in the contract.
Article 6 Responsibility of Party B
Party B shall make good preparations before entering the site in strict accordance with Party A's requirements, abide by Party A's reasonable management system and cooperate with on-site management; Wear safety helmet and safety rope on site, strictly implement safety operation rules and relevant safety regulations, and Party B shall bear the expenses and responsibilities for safety accidents caused by Party B's own reasons; Party B shall carry out the construction according to the relevant quality requirements and accept the supervision and inspection of Party A. ..
Article 7 Payment Terms
After signing the contract, pay RMB yuan (RMB yuan only) as the cost of participating in the competition and related accessories; Pay RMB only as progress payment after the completion of the second floor steel stairs and elevator shaft; After completion, Party A shall organize acceptance within 2 days, and if there are any problems, Party A shall put forward rectification on the spot, otherwise, Party A shall immediately pay RMB Yuan only after passing the acceptance.
Article 8 Effectiveness and Termination of the Contract
This contract is made in duplicate, one for each party. After both parties have fulfilled all contractual obligations and paid the completion settlement, this contract will be terminated after Party B delivers the completed project to Party A, except for the warranty clause ... Party A shall bear the responsibility for the work stoppage caused by various reasons during the construction of the project, and the construction period shall be postponed accordingly, and appropriate compensation shall be given; If the work stoppage is caused by Party B, the responsibility shall be borne by Party B, and the construction period shall not be postponed.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
;