2, strengthen the prevention and control of air pollution. Effective implementation of provincial and municipal action plans for the prevention and control of air pollution and the implementation of the program and the national and local governments to develop the winter measures, major events, safeguards, emergency measures for heavily polluted weather, pollutants, such as special emission limits and other environmental management requirements.
3, strengthen the prevention and control of water pollution. Implementation of rainfall and sewage diversion system, wastewater discharge to implement the requirements of the environmental assessment approval of the built project, and play a positive benefit of this environmental protection management technology reform project.
4, strengthen the prevention and control of noise pollution. Selection of low-noise equipment, and targeted respectively to take sound insulation, muffling, vibration damping measures to reduce noise, noise emission implementation of the "industrial enterprises in the factory boundary environmental noise emission standards" in the class 3 standard limits.
5, strengthen solid waste pollution prevention and control. General industrial solid waste should be classified and collected, the implementation of recycling pathways. Living garbage should be collected and handed over to the sanitation department for timely transportation to avoid secondary pollution. Is a hazardous waste, the construction unit must be entrusted with the appropriate qualifications of the unit in accordance with the relevant provisions of the state to properly handle and do a good job of anti-seepage and anti-corrosion measures. The construction of temporary storage facilities within the company needs to comply with the relevant provisions of the pollution control standards for hazardous waste storage and its amendment. 6, the project should be implemented in accordance with the principle of "emission standards, clean production, total control", and the strict implementation of supporting the construction of environmental protection facilities and the main project at the same time as the design, construction, and put into operation at the same time. Environmental protection "three simultaneous" system. After the completion of the project, the construction unit should be in accordance with the "Regulations on the Management of Environmental Protection in Construction Projects" requirements, acceptance of supporting the construction of environmental protection facilities, and in accordance with the law to the public acceptance report, without acceptance or acceptance of unqualified shall not be put into production, use.