Equipment acceptance report

Equipment Acceptance Report

As society continues to progress, more and more matters will be used in the report, the report has the characteristics of the language declarative. Writing a report is clueless? Here is my collection of equipment acceptance report, welcome to learn and reference, I hope to help you.

Equipment Acceptance Report 1

I. Appearance Inspection

1. Photographs and records of the equipment and the outer packaging, check whether the equipment's outer packaging is intact, there is no damage, soaking wet, damp, deformation, etc., and check the surface of the outer box and the state of the package;

2. Check the surface of the equipment and accessories for damage, corrosion, bruises, etc., focusing on the inspection of the rotor impeller damage, the main components and the main working surface;

3. If you find that the packaging is damaged, equipment and accessories have damage, corrosion, signs of use, etc., you should make a detailed record and focus on the photographs to retain the evidence, and timely to the supplier for the return of the replacement and claim procedures.

Second, the number of inspections

1. Quantity inspection should be based on the supply contract and packing list, check the host, accessories, such as equipment specifications, models, configurations, and quantities, and piece by piece inventory check;

2. Carefully check the random information is complete, such as manuals, certificates of conformity of the product inspection, warranty, etc.;< /p>

3.

3. Pay attention to check the serial number and factory number of the equipment, if necessary, you can check online;

4. Carefully make a good record of unpacking and counting, write down the location, time, participants, box number, product name, should be to the number of real and actual, such as found in shortages, misdirection and other issues, we must promptly make a record of the relevant materials and retain.

Third, fill in the acceptance record sheet

1. Box acceptance is completed, found that any one does not meet the requirements of the contract documents, must be recognized by the supplier's representative (signature, seal).

2. Write a record sheet of equipment unboxing inspection, serial number and factory number, field photos as part of the equipment acceptance documents.

Equipment unpacking acceptance record sheet

No.

Equipment Acceptance Report 2

Society is constantly progressing, which is something we are very willing to see, but there are also many things we usually do not pay attention to, for some equipment acceptance we are not very much concerned about the following example of the inspection of the equipment system.

Hubei Province, public security organs at all levels of the command and scheduling system is different, its role is limited to a separate urban area of the police and police, its effectiveness and information **** enjoyment of the ability to be very limited, did not form a unified command system throughout the province. 110, 119, 122, "three" is also mostly separated from the model, is not conducive to the command of the case of emergencies and scheduling; at present, the "three" have their own application system, which can not meet the overall scheduling of the police. Application system, can not meet the needs of the overall scheduling; to a certain extent, resulting in a waste of human and financial resources. This situation and the development of computer technology is extremely inconsistent with the state, while to a certain extent hindered the development of command and scheduling technology, affecting the public security organs of the rapid response capability, urgently need to be resolved.

The Ministry of Public Security is currently holding a special meeting in Shanxi, the requirements of a unified "online command and control system" to achieve system networking, platform, so as to achieve the "three stations in one", integration of resources, saving police, financial and material resources. Based on the above, the XX Provincial Public Security Department put forward the development of "three stations in one" network platform system "XX Provincial Public Security Command Center Online Command and Dispatch System" requirements. The construction objectives of the system are as follows:

1, to realize the "three stations in one"

2, the province's command and control system network, platform

3, the province's large network of command and control system

4, the use of advanced technology to ensure that the system's operational efficiency

5, and gradually realize the GIS geographic information system and the GPS global positioning satellite system connection, to achieve a full range of command and control. Connected to achieve a full range of command and scheduling gradually realize the super-media (voice, data, image, video) command and scheduling system. Command center construction under this principle.

Hubei Provincial Public Security Bureau 110 command center system project, constructed by XX Technology Development Co. The project in the direct leadership of the Public Security Bureau and support cooperation, completed from the program design equipment in place, engineering installation and commissioning, opening and operation of the work. This system project from the system wiring to the equipment hardware and software installation and commissioning are responsible for the contractor to provide and installation and commissioning. The system includes a center screen, LED bar screen, TV curtain wall, operating desk, 2M cabinet, TV, police computer "three in one" software system.

Among them, the police computer, network switches, UPS power supply and TV provided by Party A itself, Party B is responsible for installation and commissioning. System wiring in strict accordance with the relevant requirements, all lines to neat, beautiful, reliable, standardized, grounding specifications, in line with national regulations. There are 4-way air switches installed on the left side of the TV wall, taking power from the main power supply of the machine room, controlling LED, big screen and TV respectively. The operator console is powered by UPS uninterruptible power supply to ensure that the "three-in-one" system works normally 24 hours a day.

From the above example, we can see that the inspection of the equipment system is a very serious matter, we can not because of the daily use of equipment for maintenance on their inspection, especially we need to buy the equipment for those who just acceptance.

Equipment Acceptance Report 3

A project overview:

The project is located in the National Tourist Resort, XX Road, six kilometers in front of the Saigon Pier section of the sea roadside, west of the Sea Arts Garden District, east of the villa group, south of the State Guesthouse, the geographic location is superior, convenient transportation. With the plateau lake Dianchi as the backing, the Western Mountain Sleeping Beauty as the barrier, relying on the mountains next to the water, with a full of verdant natural landscape and fresh air, the project has a unique architectural modeling, with the Western-style architectural features and styles, is a collection of shopping, leisure, entertainment as one of the integrated business district.

The project planning license No.: Kun Guei Building Certificate (20xx) XXX and (20xx) No.; construction license No.: Degree Building Word 20xx No. XXX; construction drawing review approval No., its total floor area of square meters. ***XXX unit project, the building function is store, the building maximum 17.45m. foundation for hydrostatic prefabricated piles on independent bearing platform foundation, ground beam connection, all reinforced concrete cast-in-place frame structure, anti-eight degree seismic defense. The project was started on X, X, X in 200X, and submitted for acceptance on X, X, XX in 200X.

Second, the project project completion brief:

According to the contractual agreement of the parties involved in the construction of the contents of the project design, construction, etc. are required to complete the task of the project to meet the quality level requirements of the contract, in the design of the project, the construction process, strict implementation of the laws, regulations, codes and relevant provisions. This project underground soil soil layer is complex, belongs to the soft land foundation, the project shape is unique, beautiful, span, construction process is complex, high quality requirements, the construction unit prepared targeted construction organization design and division construction program. Construction technology, quality assurance data, construction management and construction materials, components and equipment factory inspection reports and other archival data are complete and effective. According to the content of the contract between the parties to review the completion of the following:

1. Completion of the design project: foundation, main body, indoor and outdoor decoration works; water supply and drainage works, fire protection works; building electrical installation works; elevator installation works; outdoor works; community municipal roads. After reviewing the foundation project qualified, the main project qualified, indoor and outdoor decoration project qualified, roofing project qualified; water supply and drainage project qualified; building electrical engineering qualified.

2. Completion of the contract: the general contract agreement, subcontract agreement, professional contract agreement has been reviewed in accordance with the contract agreement to complete the content.

3. Technical files and construction management information: the review of pre-construction, construction plan design review and other technical files are complete; supervision of technical files and management information is complete; construction technical files and management information is complete.

4. Test reports: After reviewing the main building materials (steel, cement, brick, sand, stone, waterproofing materials, electrical materials, etc.) test reports are complete and meet the requirements.

5. Project Quality Warranty: Project Quality Warranty has been signed, and the preparation of commercial housing quality assurance and housing instructions.

Third, supervision and rectification of the situation:

In the process of engineering construction of each division, sub-process: construction, design, supervision, construction and other units to work closely together, and better complete the inspection of the project, the inspection of the quality of the strict hold on the quality of the customs, the need for rectification of the place, the construction of a convenient and serious rectification immediately rectified rectification, after supervision of the party to carry out review and inspection. After the supervisory party to review the acceptance, to meet the standard requirements before entering the next process of construction.

In the construction process, the supervision unit in strict accordance with the national construction quality standards for construction, with the various units involved in the construction of the project to complete the task of construction supervision, engineering construction process, each process is strictly in accordance with the supervision of the outline, supervision procedures to do to ensure the quality of construction.

Fourth, the acceptance of the composition of the unit:

In accordance with the Ministry of Construction, "housing construction and municipal infrastructure projects completion of acceptance of the Interim Provisions" requirements and "the quality of residential works sub-household acceptance of the management regulations," the construction unit in XXX 20xx XXX organization of the initial inspection, XXX 20xx XXX sub-household acceptance. On XXX, 20xx, the formal acceptance of the completion of the project was organized, and the composition of the construction, design, survey, supervision, construction units and supervisory stations participating in the completion of the acceptance of the project meets the requirements.

Fifth, acceptance and rectification of the situation:

The project in accordance with the requirements of the Department of Construction Yunjianjian 20xx287 document for the household acceptance, acceptance of the construction, supervision, construction, design and other units of the acceptance of the comments made for the acceptance of the problems raised in the acceptance of the construction unit has been rectified by the units concerned by the re-inspection of the passed. And made a "residential project quality points. And made "residential project quality sub-family acceptance record" and "residential project quality sub-family acceptance inspection record". The project also did pile foundation static load and dynamic test; also asked the provincial quality inspection station for the main structure entity testing, indoor environmental testing, equipotential testing and other security testing, test reports provided by the quality supervision department, the test results are qualified.

Six, the overall evaluation of the project:

After the construction, design, supervision, construction, supervision and other units *** with close cooperation, the project has been successfully completed. Reach the completion of acceptance conditions, is now officially organized completion of acceptance.

;