The completion acceptance summary refers to a process of reviewing and analyzing the completed project after acceptance. Do you have any difficulties in writing the completion acceptance summary? The following are the reference materials of three sample essays on completion acceptance summary shared with you for reference. You are welcome to read them.
model essay 1 for completion acceptance summary
? Leaders and experts:
? Hello!
? The expansion project of XX started in XX month, XX year. After nearly one year's construction, under the leadership of XX development company and competent departments at all levels, the project was successfully completed with the sincere cooperation and solidarity of all contractors. Here, please allow me, on behalf of the company and the supervision department, to express my heartfelt thanks to the leaders and experts who came to the completion and acceptance of XX expansion project!
? The following will make a brief report on the supervision work.
? I. general situation of the project
? Ii. overview of supervision work
? From XX month, XX year, the construction unit will gradually enter the site for construction until the completion acceptance in XX month, XX year. According to the requirements of design and relevant specifications, the structural acceptance of partial projects will be carried out, which meets the requirements.
? Our company attaches great importance to this project. Comrade XX of our company serves as the general supervision engineer of the project, and the competent professional and technical personnel of the company are transferred to form the project supervision department, and the supervision plan is compiled. The supervision engineers of various professions are organized to learn more about the specifications, mandatory provisions and bidding documents, and are carefully familiar with the construction drawings. On the premise of understanding the design intent, the detailed rules for the implementation of various professions with guidance and operability are compiled and strictly implemented in the supervision process. In order to ensure the high standard of quality and safety control during the project implementation, the supervision project department has implemented a series of supervision measures, such as technical disclosure system, safety disclosure system, witness sampling system and project acceptance, to ensure the smooth development of project supervision.
? Iii. project quality control
? 1, the owner, supervision * * * with the organization for the first time the site meeting, the meeting made clear the quality goal, and put forward the problems that should be paid attention to in quality control to achieve this goal.
? 2. Before the project construction, the construction unit is required to improve and perfect the quality assurance system, including quality inspection, data and construction, including the project manager and technical director? Five members? Must be in place, the construction unit is required to strengthen the self-inspection function for each working procedure, and the supervision engineer can be notified for confirmation only after passing the self-inspection, thus ensuring the quality of each working procedure of the project.
? 3. According to the actual situation, the supervision station plan shall be prepared, and the key parts that should be on the station, such as piling and concrete pouring, shall be on the whole process, and the corresponding records shall be made.
? 4. Prepare the witness sampling plan, and carry it out in strict accordance with the plan. The raw materials of steel bars, steel bar welding, concrete, mortar and other specimens sent to XX Construction Engineering Testing Co., Ltd. are all qualified in this project.
? 5. Strictly control the quality of materials entering the site, as the entry point of engineering quality control, carefully check the product certificate, quality assurance sheet and test report, and inspect the appearance, and extract an appropriate number for inspection according to the specifications. The construction unit shall be required to leave immediately if it does not meet the requirements, and shall not be used in the project. 6, strengthen the parallel inspection of the engineering site, on-site inspection and other related supervision work, found that the problem immediately notify the construction unit in oral and written form for rectification, follow-up investigation of related problems, until the rectification is completed, the qualified party agrees to enter the next working procedure. During the construction process, my supervision department issued a notice of multi-point supervision engineer for the construction unit, and the quality problems and construction safety problems on the site accounted for the main part. The construction unit can basically rectify in time according to the design and specification requirements.
? 7. During the construction of each working procedure, strengthen the on-site actual measurement work, check the evaluation data such as the inspection lot submitted by the construction unit to the site, get the actual data, and rectify the parts beyond the specification.
? 8. For the installation of engineering materials and components, our supervision department has done the following work:
? (1) Strictly supervise the installation materials and each installation process according to various construction acceptance specifications;
? (2) For the completed working procedures, we all carry out tests according to the design and specification requirements, and conduct on-site tests or tests on relevant parts, such as grounding resistance test of lightning protection downlead and insulation resistance test of equipotential bonding, etc., and ask the construction unit to rectify in time when problems are found.
? Iv. project schedule control
? Under the correct leadership of the construction unit, our supervision department has done a lot of supervision and coordination work, which made the construction progress in a key position on the premise of ensuring safety and quality, and was finally completed in XX in XX through the unremitting efforts of all units.
? The work done by the supervisor in controlling the construction progress is summarized as follows:
? 1. According to the actual progress problems on site, the construction unit made reasonable arrangements in writing or organized special meetings for many times, and adjusted manpower, material resources and funds to make the construction unit pay more attention to it.
? 2. The supervisor is responsible for taking the lead, coordinating and solving various factors that affect the construction progress, and determining the quantities that should be completed every week according to the schedule.
? 3. When the planned construction period deviates and the key working procedures and nodes cannot be completed as planned, the owner's consent shall be obtained, and all contractors shall be required to adjust the construction plan in time, which shall be submitted to the supervision department for examination and approval before implementation. In the decoration stage, the number of days required for the construction unit to complete the corresponding process is limited, and the number of construction workers in each process is determined, and the progress control has achieved obvious results.
? 4. According to the progress plan reported by each construction unit and the actual situation on site, the supervisor agrees with the owner to determine the final deadline for the project to reach the pre-acceptance adjustment.
? 5. Grasp the progress of the construction unit in time and report it to the owner in written form.
? V. project investment control
? 1. project payment measurement
? According to the construction contract signed by the owner and each construction unit, the supervisor shall sign the project progress payment in strict accordance with the nodes agreed in the contract, and carry out the actual measurement of the quantities involved in the change in strict accordance with the actual situation on site.
? 2. Design change
? In conjunction with the construction unit, design unit and construction unit, after the joint review of the changed design, put forward the review opinions. For the contact list and changes put forward by construction and design, we put forward reasonable suggestions in time, and notify the construction unit to implement it after obtaining the final confirmation from the construction unit and design unit, and conduct acceptance in time.
? Vi. contract management
? This project involves many types of installation work, and the supervision department has strictly reviewed the qualifications of subcontractors and other units, and actively coordinated the problems raised by the general manager and the sub-manager during the construction process, so that the project can proceed smoothly.
? Seven, safe and civilized construction
? In the process of supervision, the supervision project department has always placed safety and civilized construction in the first place, always keeping in mind its importance, and strictly urged the construction unit to do a good job in safety and civilized construction in accordance with the safety production law and safety regulations. If there are hidden dangers in production safety in important parts and links, the construction unit is immediately required to rectify them until the hidden dangers are eliminated.
? In the process of supervision, we mainly did the following work:
? 1, according to the characteristics of this project, combined with the actual situation, the site before the start of the preparation of the "safe and civilized construction supervision rules", to guide the daily supervision process control inspection, implementation.
? 2, adhere to the daily inspection of the site safety production and civilized construction, especially for the formwork, scaffolding, derrick, safe electricity,? Three treasures, four mouths and five borders? Safety inspection of important parts such as protection, and record the supervision account, and immediately point out the potential safety hazards that do not meet the requirements, requiring the construction unit to make thorough rectification.
? 3. Regularly check the safety account of the construction unit, especially carefully check the safety education and safety disclosure of employees, and put forward the shortcomings in time.
? 4. Put forward supervision opinions on the civilized construction of safety production in the form of regular supervision meetings and monthly reports, summarize and analyze the problems existing in the civilized construction of safety production, put forward the focus of the next stage, and ask the construction unit to pay attention to it.
? Under the leadership of the construction unit, after the strict supervision of my supervisors and the cooperation of the construction unit, no major safety accidents occurred in this project.
? Eight, quality assurance data, partial evaluation
? The original material guarantee, block statistics, foundation trench inspection, settlement observation, structural entity detection, concealed acceptance and divisional and sub-divisional evaluation data all meet the acceptance requirements.
? Nine, appearance evaluation
? The appearance quality, section size and section size of brick masonry of this project meet the requirements of the specification after being measured by the supervision site, but the decoration visual quality is average.
? X. engineering evaluation
? XX expansion project meets the acceptance evaluation criteria and is qualified.
? Xi. conclusion
? After more than two years, the XX expansion project, with the unremitting efforts of the participating units, ushered in today's completion acceptance with hard sweat. Looking back at every scene of the whole project construction, everyone has deep feelings. There are many situations encountered in this project, which are difficult to deal with, and all parties have cooperated to solve them. However, it also provided a stage for all contractors to show their talents and accumulated valuable experience. All our supervision staff also learned a lot of engineering management experience. I would like to express my heartfelt thanks to the leaders of XX Development Company! Thank you to the quality supervision station, design institute, survey institute and other related units for their enthusiastic guidance and help in our work! In the future work, we will conscientiously sum up our work experience and improve it in the future work.
? XX supervision company
? XX year XX month XX day completion acceptance summary model essay 2
? I. general situation of the project
? This project is a 2,-ton/year benzene hydrogenation project of xx Chemical Co., Ltd.
? We undertake the construction of civil works, mechanical and electrical equipment installation, electrical instrument installation and debugging, class I and II pressure vessels installation, some non-standard equipment production and installation, supporting electrical, lighting, water supply and drainage, process piping and other affiliated equipment and facilities installation, and are responsible for the strength test and air tightness test of pipeline equipment.
? And cooperate with the installation and debugging of automation system and the cleaning of pipeline equipment
? 1. Civil engineering: The building area of the complex building is 1885M2, with three floors and a total height of 14.75m. The foundation form of this project is an independent foundation, and the main structure is a rectangular frame infilled wall structure.
? The main process equipment covers an area of 56., including compressor room, evaporation frame, E-3/E axis frame, 1-17 axis pipe gallery, 2-3 axis frame, 6-8 axis frame, 12-14 axis frame, tower foundation, compressor foundation, pit and other equipment foundations.
? Device? The elevation of .m is equivalent to the absolute elevation of 3.1m, the foundation bottom elevation of-5.75m--2.35m, and the natural ground elevation of 3.m..
? The shaft frame foundation is an independent foundation, and the main body is a steel structure with 1-3 floors, and the height of the main body varies from 7.5 m to 18 m.
? The building area of methanol cracking hydrogen production plant is 232.5, and the foundation form is independent foundation. The main structure is concrete frame with a height of 6.m, and the equipment foundation inside and outside the frame is divided.
? * * * More than 6, cubic meters of earthwork, 33 tons of steel bars, 2,5 cubic meters of commercial concrete and 7 tons of steel structures were completed.
? 2. Equipment: The equipment of this plant is mainly composed of static equipment and dynamic equipment, in which the static equipment includes 7 towers, 5 reactors, 46 vessels and 37 heat exchangers; The dynamic equipment consists of 5 pumps and 4 compressors.
? 3. Process pipelines: There are 84 process pipelines in the methanol cracking hydrogen production plant, with a total kilometer of about .5 km. There are more than 17 kinds of media, with a design pressure range of .2-~1.98MPa and a temperature range of 6℃-32℃.
? The process pipeline of the main process unit has completed more than 1,5 pipelines, with a total kilometer of about 4 kilometers. There are more than 35 kinds of media, and the design pressure range is .2-~ 8.2 MPa.
? 4. Electricity: The electricity of this project mainly includes high and low voltage distribution system, power distribution system, lighting system and lightning protection and grounding system.
? The grounding of copper-clad steel is over 2xx meters, the cable laying is over 1, meters, and the cable tray is over 5 meters.
? 5. Instruments: The DELTA-VDCS control system of EMERSON Company is adopted in this project. The important parameters are concentrated in the control room for monitoring operation, and the safety interlock part is realized on the SIS system of TRICON.
? 917 sets of instruments, 13 instrument cabinets, 12 operation desks, 7 instrument dust-proof junction boxes, 24, meters of optical cables, 2,3 meters of instrument grounding wires and 5 meters of straight cable bridge were mainly completed on site.
? Ii. statutory documents
? The bid-winning documents, construction contracts, construction permits and construction drawings are complete.
? Iii. project quality control
? Xx Chemical Co., Ltd. 2, tons/year crude benzene hydrogenation production line civil engineering and installation project bidding document quality target as excellent project.
? According to the operation of our company's quality management system and engineering quality assurance system, on the basis of construction management system, the quality management operation network of xx Chemical Co., Ltd.' s 2, tons/year crude benzene hydrogenation production line is established, and the guiding ideology embodies the company's? Careful installation, excellent service, continuous innovation and quality assurance? Quality policy.
? The chief engineer of the branch is in charge of the quality of the project, and the project manager of the execution line is in charge of the quality. The responsible engineers of each professional management group and the quality assurance engineers of materials, power and equipment are specifically responsible for the quality management and control of materials, equipment, installation and construction of each group and system, with emphasis on controlling the quality of each stage of the project. Man, machine, material, law and environment? And other factors that affect the quality, and organize the construction team to carry out self-inspection and mutual inspection of process control points and stop points in stages, so as to achieve that the quality of each stage of the project is always in a stable and controlled state.
? By the supervision department branch technical supervision section chief in charge of quality, through the branch construction technology department for quality planning and preparation of quality plans, to implement the responsibility of the construction professional management team engineers, as well as materials, power, equipment quality assurance responsibility engineers, to.