What is the bidding bottom in bidding?

The bottom of the bidding is the expected price of the bidding project, can reflect the amount of funds for the proposed project, in order to clarify the financial obligations of the bidding unit. According to the regulations, the tender for domestic construction bidding, should be within the approved project estimates or revised estimates, the bidding unit with which to control the cost of the project, and as a yardstick for judging the bidder's offer is reasonable, the winning bidder are to sign a contract in accordance with the offer.

The use of bidding can relatively reduce the cost of the project; bidding is a measure of the bidding unit quotes quasi-criteria, with bidding, in order to correctly determine the reasonableness and reliability of the bidding price; bidding is the evaluation of bidding, bidding is an important basis. Scientific and reasonable bidding can be evaluated for the owner in the bidding, bidding correctly select the bid price is reasonable, quality assurance, appropriate schedule, good corporate reputation of the construction company. Bidding reflects the survival of the fittest, open and fair competition mechanism.

A good bidding, should be from a practical point of view, reflecting the scientific and reasonable, it puts the opportunity to win the bid in front of many enterprises, they can rely on their respective personnel technology, management, equipment and other aspects of the advantages of participating in the bidding, maximize access to legitimate profits. And the owners can also get quality service and save infrastructure investment.

Bidding must be controlled by the budget estimates, if the breakthrough budget estimates, should analyze the reasons. If the bidding preparation error, the error should be corrected. If the construction drawings design to expand the scale of construction, should modify the construction drawings, and re-prepare the tender. Otherwise, it should be revised estimates, and reported to the original approval authority to adjust.

Bidding is also an important yardstick for bid evaluation. The bidding and tendering law, (bid evaluation) with a bid, should refer to the bid. However, how to refer to the tender evaluation, is a very important issue in the bidding system.

For a long time, the construction project bidding actually become the construction project plan price, the bidding price to bidding as a benchmark or to bidding as the basis for the revised price as a benchmark, up and down range can not exceed a certain range; this range is generally very strict, the range is very small.

More about the engineering/service/procurement category of the tender writing production, to enhance the winning rate, you can click on the bottom of the official website customer service free advice:/#/?source=bdzd