Every year, we have to write a summary, to our own work an affirmation for the development of the company to make a contribution to the company's development, and now our business in the rapid development and growth. Our company's long-term stable development is the first thing we need to do is to differentiate the service and management, and do a good job of daily basic work. Let our brand manufacturers and manufacturers and we work together to create a better tomorrow, so that our God customers into the Huamei feel the warmth and comfort of home. Let us Huamei the significance of the existence of more far-reaching.
Our property department is responsible for the mall's security, electricity, cleaning, plumbing, heating and air conditioning, and other key work, each position is very important, indispensable, the customer enters our shopping malls first feel the warmth of the property services, cozy, a warm greeting, a warm smile, so that the customer feels the warmth of the home and a kind of home products brought about by the culture. Plumbing, cleaning, central air-conditioning, other property facilities and equipment maintenance and repair, the work is relatively fragile, cumbersome, which requires us to each property people's sense of responsibility is truly implemented in practice is crucial. The past 20xx year, everyone has a new harvest, the face of the rapid pace of development of enterprises, everyone needs to correct the place. Enterprises to develop must be full of unprecedented unity, unity of purpose, focus on the details, comprehensively enhance the service, enhance the reputation of Huamei, so that our road wider and wider.
I. (1) plumbing facilities and equipment maintenance and management is more solid and transparent. At the beginning of the year, we have formulated the goals and plans for plumbing and heating work, fully mobilize the creativity and ingenuity of the personnel, the operation of the central air conditioning, maintenance and repair, and manufacturers of engineers to communicate with the whole staff for direct-fired engine system learning, and applied in practice. The central air-conditioning auxiliary maintenance, do a good job of the original work, we have a number of equipment due to the gradual aging of the equipment for the whole staff to participate in, contribute to the solution, focus on solving some of the problems in the operation of the unit. For the problems encountered in previous years, we do consider in advance, so that prevention is the mainstay. For the work of energy saving and consumption reduction, from the operation method is carefully designed, carefully considered, in order to achieve the effect on the basis of the data of previous years to minimize the effect of previous years to maximize. The property work by the return visit, booth satisfaction rate of more than ninety-eight percent. Insulation work in the mall, the use of commercial renovation opportunities, by us to buy materials and construction of some of the cold point of insulation treatment, to achieve a better effect, for the mall to develop energy-saving goals in mind for everyone, by the previous passive work, into active work.
(2) full service consciousness, service attitude change is a highlight of our work. For the company put forward the smile service, happy to work the overall goal, each of us with the heart to understand, have a sense of through the specific work. Achieve good results, a saying is extremely apt, heartfelt smile is the happiest and most beautiful smile. The company's good image comes from everyone with a true heart to experience, to do. Merchants, customers, brand manufacturers is a whole, each link has a problem will affect the overall development of the mall, so we are in the service for customers for merchants, more perfect, more active. Their business as their own, their comfort or not as their own empathy.
(3) The training and growth of personnel is the treasure of long-term development of the enterprise. The comprehensive quality of personnel do not go, it is difficult to say that the enterprise is bigger and stronger. Only everyone knows the importance of learning, for growth is the absolute key to victory, through the exchange of technology, so that everyone has been comprehensively improved, through the study of books in the advanced management experience, so that we are more sober to see, only with the knowledge to arm their own minds, coupled with their own skills in order to become a composite talent needed by the enterprise. Close to a year of learning, each of us, have improved greatly, between the upper and lower levels, between the same level, between departments, get along more harmoniously, by not understanding, into understanding, from passive into active. Network promotion work, this is the property staff in 20xx year is worth going to say the highlights, we have some comrades can be long-term for the growth of the company to do long-term online promotion, which is very welcome, and we do not ask for return, only for the development of the company. These passes are all over the learning to bring us growth.
II. Enterprise development, break through the bottleneck of the boundaries to success. Working in Huamei, our greatest experience is that this is a learning team, is a team to catch up with the superiority of our leaders have ambitious goals of excellence, efficient management concepts, which is not available in other enterprises. This is also where we feel most comfortable. Everyone can put their own destiny and the fate of the enterprise tightly linked together, the rise and fall of the enterprise, glory and disgrace as their own, there are even greater dangers and difficulties, and then strong competitors we are not afraid, only to perfect their own work, perfect, focus on the details, only to do the details in place to enjoy the success of the joy that brings us.
III. A good vision, good expectations will be the driving force of our growth. Enterprise development by the leadership of the direction of the rudder, but the navigation depends on each person to push the waves, so we hope that our business can give more opportunities to learn and grow, so that our thinking and pace of development and growth to keep pace with the pulse of the enterprise. Enterprise is a big family, each personnel like brothers and sisters, and only then we will be in the future of the fierce competition in the market with the same enemy, to move forward.
Drainage designer year-end summary of the work of two
I entered the XXXXXXXXXX company in XXX years, engaged in XXX; XXX XX in XXX years XX months to obtain the title of Assistant Engineer, so far I engaged in the work of XXX has been X years, in the X years, I am down-to-earth, serious work, hard work and study, in the continuous practice of their own level of all aspects have been greatly improved.
First, job responsibilities
In this X years of construction projects I gradually realized that the construction work should be shouldered with a great sense of responsibility, because the results of their own not only be responsible for their own responsibility, be responsible for the unit, be responsible for the owners, but also be responsible for the community, and once built to influence the decades, the impact of this society is Huge. So I do my job seriously at the same time, and strive to learn a variety of new norms, new technologies, and constantly improve the level of personal skills and professionalism, encounter problems and take the initiative to consult the relevant norms, information, and ask old comrades for advice, in the actual engineering services, and actively communicate with the owners, and the relevant government departments to coordinate, and take the initiative to provide technical support for the construction unit, and do their best to do a good job in the later stages of the project services, but also The company has been praised by all parties in the society.
Second, professional and technical ability
In the technical work of rigorous and pragmatic, positive and enterprising, through self-study, training, and the exchange of various professionals to continuously improve the professional and technical ability, in the work of the active acceptance of new technologies, new materials, new ideas, new methods, proficiency in a variety of office software, the knowledge they learned to the actual project to go. Knowledge embodied in the actual project, able to theory and practice, and correctly deal with the owner's economic requirements and the relationship between the principles of construction. During this period, I also participated in many trainings, such as "XXXXXXXX" organized by XX City Construction Bureau in XX City XX Hotel in XX XX in XX, and "XXXXXXXX" in the conference room on the third floor of the unit, and so on. In this XXX years, I y appreciate that for our young generation, the construction of this industry, the pursuit of technology is never-ending, although during this period I also took a lot of detours, experienced a lot of confusion, but in their own efforts and with the help of colleagues, I step by step over, the program design ability to gradually improve the technical maturity; can individually with the owners of the communication and coordination, and communication with the government departments, Dealing with on-site construction problems, really reflects the level of an engineer. In their own continuous progress at the same time also do not forget to take the initiative to help young comrades, so that they more quickly grasp the technology, fast growth.
Third, the specific work
I am engaged in the work is mainly responsible for the construction of drainage construction technology and measures of the construction phase of the pre-preparation, mid-construction, post-inspection.
(a) construction preparation stage of drainage construction technology and measures
1, scientific design review of the construction drawings of the drainage project
In the construction project, the drawing design is the first step in the beginning of the project, the construction of drainage pipe drawing design requirements are relatively high, which requires the construction unit to be from a practical point of view, the specific consideration of the construction area of the construction conditions, especially the geographical conditions. Conditions, especially geographical conditions. It mainly includes the investigation of the stratum, the groundwater level and other relevant conditions, and at the same time, according to the size of the city, under the premise of giving full consideration to the amount of water supply and drainage, the reasonable design of water supply and drainage pipeline structure and pipeline size. To do the construction drawings of the design to meet the needs of urban drainage, which is a reasonable premise for the drainage pipe.
After the design of the drawings of the drainage pipe construction, the construction personnel must have an in-depth understanding of the drawings. Urban pipeline is a system, not isolated, so the construction process of each link is interconnected. Construction personnel must have a certain understanding of the entire project, and a detailed grasp of the geographic situation of the construction area, in order to ensure the accuracy of construction.
2, the pipeline materials for strict requirements
In order to ensure that the construction results have a certain quality effect, and to meet the people's construction requirements, the need to arrange for specialists to each batch of drainage pipe materials into the field to carry out a strict inspection. Specialized personnel include the material officer, quality inspector, safety officer and technician of the building construction unit. They are mainly for the type of material, specifications, appearance and other detailed inspection, can fully ensure that the surface of the material is not obvious scratches and wear and tear and other phenomena, and the appearance of the material color to have a certain degree of uniformity, as well as material manufacturers have the corresponding certificate of conformity, can provide qualified reports. To ensure that the material is well inspected to the greatest extent possible. Mainly because even the same manufacturer of materials, raw materials used, there will be different degrees of quality problems. Only after obtaining a certificate of conformity that meets the construction requirements, can the corresponding materials be approved to enter the construction site.
3, do a good job in the measurement of the release line, to maintain the accuracy of the measurement
In the process of drainage pipe construction, the measurement of the release line is very easy to produce errors, I need to do is to control the error within the permissible range, more than the error is unqualified. Therefore, in the discharge measurement, the construction of the technical people must be strictly in accordance with the steps and specifications of the construction measurement, to ensure the accuracy of the measurement.
(ii) construction stage drainage construction technology and measures
1, timely reservation of holes and casing
civil foundation, the main structure of the construction stage when the discharge pipe and and the introduction of the pipe through the building, the construction technicians should be tracked to check the installation of water supply and drainage construction in accordance with the requirements of the reservation of holes, set up the casing. The personnel should be familiar with the drawings and the location and specification of all the reserved holes and buried casing to ensure the accuracy of the reserved holes and buried casing. The technicians must require the construction personnel to bury the water supply and drainage pipes in the first floor and do a good job of anticorrosion treatment, after which backfilling can be carried out indoors, and the construction unit should also temporarily block the various reserved pipes. Kitchen, toilet reserved holes should pay attention to the location of sanitary ware and kitchen, toilet line, pipe layout, so as not to damage the line, pipe during installation. Installation of waterproof casing position should be accurate, casing can not be skewed and off-set, casing mouth inner edge should be chamfered, remove welding slag and burr edge. Through the shear wall casing using steel casing, according to the design and specification requirements for the production of casing, pre-buried should be well positioned to deal with and review the location of the casing, such as offset should be adjusted in a timely manner.
2, dry pipe and riser production and installation stage
This stage of construction work includes: the production and installation of the support bracket, the production and installation of the riser, dry pipe production and installation. This stage of quality control points are: (1) pipe production, especially galvanized steel pipe lassoing quality should be strictly controlled, pipe connection interface should be tight; (2) riser installation before hanging plumbline, to ensure that the verticality of the pipe; (3) pipeline installation is firm, the installation of support hangers in accordance with the specification requirements; (4) plastic piping must be installed expansion joints, drainage risers according to the specifications of the set of inspection ports; (5) pipe Concealed pipeline in the well must be concealed before the hidden acceptance, if the pipeline well water riser must be pressure test, acceptance before concealed; (6) riser installation construction interruptions, must do a good job of the upper end of the pipe mouth cover, to prevent debris from entering.
3, branch pipe and accessory production and installation stage
(1) branch pipe installation
water supply branch pipe installation has two ways of concealed and open installation. Concealed piping needs to be cut in the brick wall or floor trench, pipe installation acceptance and then covered with mortar. Although this installation method can better meet the requirements of aesthetics, but because it will have a certain impact on the quality of construction and pipeline maintenance difficulties, so in the construction of rough housing construction, generally rarely used. Explicitly installed water supply branch pipe laid along the wall, need to install pipe clips on the wall. Drainage branch pipe also has two ways of concealed and open installation. Concealed installation, the floor elevation of the bathroom and the bedroom, living room floor elevation left between a certain height difference, the drainage branch pipe laying and installation and then filled with stone, painting the ground. Explicitly installed drainage pipes are installed in the ceiling of the lower bathroom and require the installation of hangers. Concealed installation is not only aesthetically pleasing, but also avoids the potential for future disputes between residents on the upper and lower floors. In addition, unlike water supply pipes, drainage pipes are not pressurized pipes, so the chance of damage to the pipe is very small. This installation is worth advocating.
(2) quality control points
This stage of quality control points are: a) the pipe is installed firmly, the installation of the support bracket to comply with the specification requirements; b) the depth of insertion of the interface must comply with the specification requirements to ensure that the interface of the tightness; c) branch pipe to the use of (drainage) water point location, elevation should be in strict accordance with the design requirements; d) the drainage branch pipe in the direction of the slope of the water flow must be in accordance with the design requirements; e) the drainage branch pipe in the direction of the water flow must be in accordance with the design requirements; e) the drainage branch pipe in the direction of the water flow must be in accordance with the design requirements. Must be in accordance with the design requirements; e) Valve installation should be closed to avoid debris into the valve affecting the tightness, one-way valve installation should pay attention to the valve import and export direction and the direction of water flow is consistent.
4, pipe washing and test phase
After the end of the pipeline installation should be carried out after the pipeline test, check the tightness of the piping system, water supply system pipeline should also be blown to meet the health requirements. Tests include: pressure test for water piping, drainage pipe filling test, drainage pipe ball test, test problems should be looking for reasons to rectify and re-test, the test can only be accepted after passing.
5, equipment and sanitary ware installation stage
Equipment and sanitary ware installation must be in the pipeline blowing and testing after passing, equipment and sanitary ware installation at the end of the construction process, this is also for the protection of the finished product, to prevent other types of work in the operation of equipment and sanitary ware damage. At the same time, due to the installation of equipment and sanitary ware are valuable items, easy to dismantle, so also anti-theft. Equipment and sanitary ware installation location must be correct, washbasin and washbasin installation elevation to meet the design and use requirements, installation to be firm.
6, metal pipe painting and corrosion stage
This stage is the construction process of the final stage. Fire water pipeline must be painted red rust paint, metal support hangers must be galvanized or brush rust paint, buried in the introduction of water pipeline is a metal pipe, must be done to prevent corrosion.
(C) construction of late drainage construction techniques and measures
After the basic end of site construction, should also do a good job of late quality control. Before the completion of the project should be all the valves, water meters, fire hydrants, sanitary appliances and other facilities for a comprehensive cleanup to ensure that the box, appliances, etc., no dirt, surface cleanliness. Check the water pressure test of the water pipeline, the water supply system of the blowing, valve pressure testing, drainage pipe filling test and water test test and other test items such as the preparation of test reports, collate and summarize all the hidden works to check the hidden single, a variety of water supply and drainage technical data, certificates of conformity, warranty certificates, all kinds of electrical appliances and materials, test reports, etc., and bound into a booklet. According to the actual construction of the project to prepare a complete as-built drawings, collated and summarized and bound, as the basis for acceptance of the project and the construction unit of the future maintenance of the original data.
In these years, although I have made some small achievements, but relative to the company and the higher leaders of my trust and expectations there is a gap. In the future work, I will work harder, constantly improve their professional and technical level, better design tasks. Broaden the idea, more creative to complete their work, and strive for their own ideals.
Drainage designer year-end work summary threeTime flies, from March into the company to now almost 9 months. From just joining the company's system, management processes and the work of the unfamiliar to the company's drainage (from the company's system, drainage basics, drainage processes, drainage equipment, etc.) the work process of all aspects of the problem and the application of all the obvious progress, there is a certain degree of judgment and analytical ability, the following is a summary of my work for the period of time.
First, the basic knowledge learning stage?
Text theory learning, process route drawings and equipment principle learning: from living water, fire water, circulating water, deaerator, water purification treatment and finally to rainwater collection.
1, the text of the theory of the main learning in the basic terms related to water supply and drainage, to master the most basic basic theory, level, pressure, flow and other units, definition of the meaning of the relevant figures, reflecting the problems occurring in these problems how to adjust. Such as the definition of the concentration factor: evaporation and the concentration of the material content and replenishment of the same material content of the water ratio, in the circulating cooling water, due to evaporation and the concentration of dissolved solids and replenishment of dissolved solids in the water ratio. In practical measurements, we at Sierpont Circulating Water Systems measure values in terms of the concentration ratio of CL ions. The opening of the make-up water valve is adjusted according to the different concentration ratios Drainage water valve opening. Through the study of these basics, it is easier for me to understand the learning of the process behind, the different meanings represented by each indicator.
2, process route drawings to learn the main drawings, the route is the most important, every day pipeline to where, what materials inside after a device material changes, these are vital, the future work can not have the slightest error, and will not give me the opportunity to make mistakes. So the process is the most important in the learning process of these months. For example, water purification is by: after the production of water into the water, after high-efficiency sedimentation tank to clarify the turbidity, need to add coagulants, flocculants, etc., Bioss-treat to further remove impurities and other small particles, the intermediate pool of water as a backwash water storage, reverse osmosis and ultrafiltration focuses on going out of a variety of ions, hardness, alkalinity, CL ions and other corrosive on the water pipelines, scaling, after the effect on the return to the heat effect, and then enter the larger production of water irrigation for supply. After entering the larger produced water irrigation for other devices.
2 Through the study of the process route flow, so that I mastered our water supply and drainage department is the main work. Understand our later raw materials, media, products. We are how to transform the unqualified water into supply process use qualified water. Also makes me understand that my work is a great responsibility.
3, the principle of equipment learning, mainly to learn the process used in the equipment, the structure of these devices, the principle, the role. Through the study of these devices to better understand the equipment in this day the role played in the process route, a more profound understanding of the process. For example, the mechanical clarifier structure and working principle: clarifier mainly consists of water collection tank, support bridge, inlet and outlet pipes, dosing pipe, sampling pipe, slag discharge pipe, the first reaction chamber, the first reaction chamber, the second reaction chamber, deflector, slag mixing slurry, mixing impeller, mixer shaft, scraper shaft, scraper arm, the top of the support steel structure and other components. Mechanical mixing clarifier is a mixing chamber and reaction chamber into one, that is, the raw water directly into the first reaction chamber, where due to the agitator blades and turbine stirring and lifting, so that the incoming water, chemicals (PAC coagulant, PAM flocculant) and a large number of reflux slag rapid contact mixing in the first reaction chamber to complete the mechanical reaction, and reflux slag in the original slag collision and adsorption, the formation of larger flocs, and then be The turbine is lifted to the second reaction chamber, and then through the folding flow to the clarification area for separation, the clear water rises from the collection tank, the mud in the lower part of the clarification area back to the first reaction chamber, the mud scraper scraping set to the mud hopper, through the bottom of the pool sludge valve control discharge, to achieve the effect of clarification of the separation of the raw water.
Second, out of the internship stage
December I started in Honggang Petrochemical internship, although the time is only one month and also shift work, but I think I have learned, the true meaning of the petrochemical plant.
1, on-site physical learning.
2, the internship process saw me in the drawings drawn many times on the circulating water tower, twice as high as my circulating water pumps, one meter two that enter and exit the free pipeline and so on. All these make me y realize that my work is extremely important and dangerous. At the same time I also saw the physical and drawing the difference between the more clear, intuitive to see the internal structure of the equipment, recognize the actual working condition of the equipment, many drawings are not very clear on the place to be resolved, but at the same time there are other problems, equipment running to what state is the best, the pipeline towards the curved, how to be able to familiarize themselves with these pipelines are those materials, the material's collective parameters, the equipment needs backwashing or overhaul. When the equipment needs to be backwashed or overhauled and what work to do.
2, the central control room learning
3 I think this is extremely important, the biggest feeling is that as long as here you can understand at a glance, outside of those big guys are completely connected to a whole, a system, a set of processes, a plant. Various material changes in the pipeline is very obvious. Your control is the need to be very fine, each table, valves, reflecting the operation of the entire system of the state, so here is the most important post of the entire system, to see the master of the Hongkang master is always very busy look, I also hope that I can be to the master of the operation of each valve as seriously, record each data, to complete a good job.
Three, the experience of the work process
1, accumulate experience, learning to use. In the nine-month learning process not only learned a lot of professional skills, but also to be able to do to utilize the knowledge learned, flexible application to the work. When solving and analyzing problems, use professional knowledge and think positively so as to find accurate results.
2, modest to ask for advice, to strengthen their own. In the learning process to other colleagues to learn from the work experience, learn from the good way of working, unity and cooperation, enhance the sense of responsibility, so that the learned just in the future work, not to waste the company's resources, to improve the quality of work done and standards. Continue to cultivate their own sense of responsibility for the work and sense of enterprise, work hard, and make more contributions to Sierpong.
In short, the past work, as an ungraded operator, I have always been serious about learning, conscientious work to do the work of the people, and do a good job of leadership to my work. In the future work, with the gradual and full-scale construction of the project, I will, as always, study harder, work harder to complete the work, I believe that through the work of the future, I will do my best for the development and growth of the company Sierpont. And I wish Sierpont a more brilliant tomorrow.