According to the type of task can be divided into: daily planned and temporary work plan. Below is the text content of the engineering department work plan that I have carefully organized for you.
Engineering Department work plan text content 1
(a) public **** equipment and facilities repair and maintenance and management
1, increase the coordination of the construction unit, and strive to the end of February to complete the maintenance of diesel generator failures on the West (diesel control computer motherboard repair, replacement of emulsified lubricating oil).
2, follow up on the public **** equipment and facilities warranty left over, put forward solutions and recommendations to coordinate the relevant construction units to continue to repair and rectification.
3, the improvement of the living pool water level control and alarm, increase the safety factor, eliminate potential safety hazards, to protect property safety.
4, contact the construction unit to overhaul the pump monitoring system, and the security department on duty and the Ministry of Engineering personnel for the pump monitoring system operation training.
5, the company took over the property project power supply, air conditioning, water supply and drainage, fire, elevator, weak power system and building renovation projects for inspection and data verification.
6, sort out the construction unit of the L4 district public **** equipment and facilities warranty period, clear warranty responsibility.
7, the development of public **** equipment and facilities outsourcing maintenance funds budget reported to the company for review, proposed outsourcing maintenance program.
8, the establishment of detailed equipment ledger, equipment list.
9, the preparation of detailed equipment, facilities repair and maintenance plans, maintenance projects, maintenance standards, requiring departmental employees to strictly according to the plan and standards for the implementation of equipment maintenance, so that equipment operation is safe, reliable, extend its service life, to achieve the preservation of value, value-added purpose.
(ii) marketing work
Actively cooperate with the sales department, to ensure the normal operation of the model rooms, sales halls and related facilities, to create a good atmosphere and environment for marketing work.
(C) Household maintenance services
1, first focus on public **** facilities and equipment inspection, maintenance, repair work, to ensure that the equipment is in a good state of operation, and at the same time, pay attention to the household maintenance services, to do both hands, both hands must be hard. Combined with the current shortage of manpower, every day, the day shift, mid-shift arrangements for one household maintenance mechanic to provide maintenance services to the owners, mainly to address the impact of the owners of the normal life of the repair project.
2, coordination of the Department of Customer Service to clarify the renovation unit, the construction unit of the indoor decoration warranty coverage, is the scope of the warranty, the Department of Customer Service to coordinate the relevant units responsible for resolving the problem, to reduce the pressure of indoor maintenance;
3, it is recommended that the company to determine the number of contracted maintenance units, when received beyond the scope of the Department of Engineering business or the scope of the service capacity of the project, such as the owner's request, you can provide the owner with a special maintenance unit. The relevant information of the unit, by the owner to contact the door service repair.
(D) system construction
1, according to the district equipment and service characteristics, the development of property management ISO program documents, work norms, quality manuals, improve the rules and regulations of the Engineering Department.
2, the application of ISO documents to improve the park's public **** facilities, equipment systems, operation and management regulations and safe operating procedures, scientific management of equipment and facilities to ensure the safe operation of the system equipment under the jurisdiction.
(E) standardize the management
1, with property management ISO program documents, work norms, quality manuals and various types of record forms, standardize the management and improve the level of property management.
2, the organization's staff to learn the company's rules and regulations, seriously implement the job responsibility system, supervise subordinate staff to strictly implement the operating procedures and staff code, and conscientiously implement the property management regulations and the company's rules and regulations.
3, the organization of subordinate staff with the Department of Customer Service to do a good job of customer service, from time to time with the Department of Customer Service to carry out discussions, communication, *** with progress.
(F) team building
1, strengthen the staff skills training
(1) for the jurisdiction of the property of various types of equipment, facilities, operational status, functions and technical characteristics, throughout the year to carry out theoretical learning, on-site explanation and operational training, requiring employees to be clear and familiar with the location of various types of equipment and operating methods.
(2) for the subordinate staff of the technical situation, the preparation of professional knowledge training program, according to the plan implementation, and regular assessment.
(3) Encourage employees to participate in skills training in their spare time, to cultivate a multi-talented technical backbone (at present, there are three employees in my department to participate in the Power Supply Bureau's high-voltage into the network operation training).
2, pay attention to ideological education
(1) to strengthen the awareness of production safety, prevention is the mainstay, prevention is better than cure, to ensure personal safety and equipment safety.
(2) pay attention to professional ethics education, correct the staff's work attitude, strict management, and establish a positive atmosphere. Firmly eliminated four kinds of people: people who only say not to do; people floating in the business; business level is not high, and do not seek to improve the people; the use of their positions, the people who seek personal gain.
(3) to strengthen the property management service awareness education, cultivate a sense of competition, improve the quality of staff, strengthen the team spirit of staff education, enhance cohesion.
3, promote talent training
Within one year to train 50% of the grass-roots employees with the quality of the foreman, foreman with the quality of the supervisor, the supervisor with the quality of the manager, for the development of the company's reserves, the delivery of backbone talent.
(VII), the prospects of the company
1, strengthen management, the company stronger
By strengthening the management of the company's property management services, scientific, formalized, professional, integrated, in one to two years to make the company stronger, the reserve of management personnel, to build the company's integrity brand.
2, the scale of operation, the company bigger
zz property management as the basis for the establishment of the operating department, the external takeover of the building, expanding the development of staff space, so that the company operates on a large scale, to create greater economic and social benefits.
Engineering Department work plan text content 2
First, the work of the overall idea
Engineering Department of the comprehensive progress of the current project, in a positive and steady to the completion of the existing works of the closing work at the same time, and gradually plan out the next year's specific work ideas, specifically as follows: "two construction "refers to the construction of the engineering team, fighting force and cohesion. Engineering management system and the construction of engineering management system. Engineering construction "three goals" refers to the project progress goals, quality goals, cost objectives to be reasonably balanced, coordinated and unified, so as to promote the completion of the project's comprehensive objectives.
Second, the project management indicators
A, ** Department Store internal lighting renovation project completed
B, ** Plaza eave floodlighting project completed
C, the project qualification rate of 100%
D, the site of zero major safety accidents
Third, the work plan
(a) the start of the construction and the scale of the project
(a) the start of the construction and the scale of the project
2018, the construction of the project is to be completed. /p>
In 2018, the Engineering Department, with the support of the company and relevant departments, ** Department Store internal lighting renovation, ** Plaza eave floodlighting project, according to the company's scheduled start date to start construction.
(ii) Quality control objectives
The projects are excellent up to 80% and qualified up to 100%. The main control project all qualified, general project acceptance through.
(C) progress management objectives
Completion of the company's annual plan targets, to achieve progress management contract objectives.
(D) Cost control objectives
Completion of various cost control objectives issued by the company, fulfillment of cost control contract objectives, and progress control objectives.
(V) safety and civilization measures
Safety and civilization measures are mainly from the following two aspects.
1) qualification documents management
A, business cooperation unit safety production qualification review and filing management
B, construction machinery equipment testing for the record
C, special operators induction certificate review for the record
D, professional and technical, professional management of the safety personnel qualification review for the record
2) major construction programs, systems Management
A, construction site layout plan review
B, civilized construction management approach to implementation
C, warehouse management program, scaffolding program, construction of temporary electricity program, construction machinery erection program, aerial work control program, construction measurement control program.
D, workers living environment management system
E, on-site construction environment management system
F, safe and civilized construction inspection and evaluation and reward and punishment system
(F) the internal construction of the department
1, team building
around the next year's work objectives, the engineering department staff in the department of team building is particularly important. The engineering department to improve the department's "team building". Engineering Department to improve the department's "team cohesion" and "team fighting force" as the fundamental, stimulate the department staff to actively participate in the activities organized by the company, and actively participate in the company's corporate culture, and strive to promote the staff and the company's team building coordination. Comprehensively stimulate the enthusiasm of the staff, and enhance the overall combat effectiveness of the staff.
2, the system
Engineering system construction mainly to reflect the following aspects. A, improve the engineering department internal rules and regulations guidelines. B, a clear division of responsibilities within the Ministry of Engineering. C, the formation of internal work with other departments of the business process interface. D, with engineering business cooperation unit management rules and regulations.
Fourth, focus on issues
(a) clear construction mode
In the company's construction mode gradually clear at the same time, the Ministry of Engineering will be in accordance with the company's construction mode to quickly clarify the ideas, the first time with the company to complete the model docking.
(2) Rational planning of contract and contracting mode
According to the project characteristics, planning and determining the contract and contracting mode in line with the characteristics of the project of the company, through rational planning and determining the mode, so as to maximize the profit of the project.
(C) build and improve the project management model suitable for our company
According to the company's project management model, the engineering department will use this model as the basis to improve the rules and regulations, forming a complete and feasible management program.
V. Hope to get support and help
In terms of human resources and team building, we hope to get strong support from the company. In addition, the project construction mode will be determined as soon as possible.
Engineering Department work plan text content 3
First, safety management
1, equipment and facilities safety management must adhere to the "safety first, prevention first" policy; must adhere to the systematic management of equipment maintenance process; must adhere to the continuous updating and improvement. Must adhere to the continuous updating and transformation; update the level of safety technology, can timely and effectively eliminate the equipment operation process of unsafe factors, to ensure that zero major accidents. 2, a clear responsibility for safety operations, the formation of a perfect safety maintenance management system. 3, strict implementation of operating safety regulations, to achieve safety management standardization, institutionalization. 4, to strengthen the safety of foreign decorative companies to strengthen the safety supervision, strict decorative units safety Access conditions.
Second, the work plan
1, to strengthen the service consciousness of the maintenance department. Currently in the service, the Ministry of Engineering needs to further improve the level of service, especially in the way and quality, need to be further improved. This department will regularly carry out the service object, civilized manners, multi-capable technology training, improve the service quality and service efficiency of the department personnel.
2, improve the system, clear responsibility, to ensure the healthy operation of the department. In order to play the role of the Ministry of Engineering as a property and the development of good communication between the owners care about the role of the link, for the shape of the service, improve and improve the work system, so as to be more suitable for the development of the current work; from the system of equipment management and personnel arrangements, to truly realize the work of the rules and regulations, the system regulates the work. Through the implementation of the system, clear responsibility, to ensure that the department's work is carried out in a benign manner.
3, strengthen the supervision of equipment, strengthen the cost consciousness. Engineering Department is responsible for the maintenance and management of all residential facilities and equipment, directly related to the control of property costs. Familiar with the operation of equipment, performance, to ensure the normal operation of equipment, in accordance with the norms of real-time supervision of the gravity zone, the Ministry of Engineering will be implemented in accordance with the needs of the relevant work, so that there is equipment, maintenance, results; and facilities and equipment maintenance focus on planning to a specific individual.
4, carry out training, strengthen learning, improve skills. On the current scope of services of the Ministry of Engineering, is still relatively limited, especially limited to the structure of their own knowledge, in order to further improve the work skills, appropriate theoretical learning, complementary to improve the overall team's level of service.
5, for the maintenance of facilities and equipment maintenance characteristics, the development of the corresponding maintenance plan, the workflow sub-detailed.
Third, do a good job of energy control
Management of energy costs usually account for a large proportion of the daily costs of the property company, energy saving is an effective means of improving the efficiency of the company. The key to energy management is:
1, improve the energy-saving awareness of all employees
2, the development of the necessary rules and regulations
3, to take the necessary technical measures, such as office power and gate post power separation in addition to the original street lamps and elevator power (they are not the same charges), underground parking lot lighting facilities and equipment renovation, the parking lot to reduce energy consumption to Minimum; will be transformed into energy-saving lamps and lanterns in the building; will be transformed into a touch time-delay switch for the lighting control switch in the building.
4, in the equipment operation and maintenance costs of internal assessment and control, to avoid and reduce unnecessary waste.
5, directly looking for manufacturers into the purchase of equipment accessories, unified purchase of spare parts, according to the equipment maintenance cycle. In order to replace in a timely manner, to ensure that the equipment to play the best energy-saving role, reduce maintenance costs.
Fourth, preventive maintenance
1, preventive maintenance: all facilities and equipment are developed maintenance and overhaul plan, according to the equipment maintenance cycle of the established time, the project and the process of implementation of preventive maintenance.
2, daily repair processing: facilities, equipment, the daily use of faults found in the form of repair orders to take maintenance measures. (Party building work plan)
3, daily inspection: the Ministry of Engineering on duty in the duty of the equipment within the scope of responsibility, facilities for one to two inspections, found faults and abnormalities in a timely manner.
V. Sound equipment, facilities files, maintenance work to do a good job checking records.
In order to ensure that the equipment, implementation of the integrity and continuity of the original information, on the existing basis to further improve the management of departmental files, the establishment of equipment ledgers. For the new takeover of the Venice neighborhood, due to the real estate company supporting facilities installation lag, do a good job in the collection of facilities and equipment information to follow up.
Six, facilities and equipment maintenance work:
1, the strict implementation of the regular inspection system, found that the problem is dealt with in a timely manner, no less than one daily inspection.
2, according to the different seasons to arrange regular inspections, especially the flood season, to strengthen the inspection to ensure safety.
3, according to the actual needs of the community iron fence, iron doors and street lamp poles in addition to rust and paint.
4, according to the actual needs of the community roads, flower beds, wall renovation. Our engineering department will carry out the above work, show our company's service image, provide owners with more high-quality and caring service, and create better conditions for the future development of our property company.
Engineering Department work plan text content 4
The new year has come, in the face of the reality of the hotel industry is becoming increasingly competitive, as well as the hotel operation is faced with the further aging of the facilities and equipment of the difficulties and challenges, the Ministry of Engineering to make every effort to combined with the hotel's existing equipment and facilities to do a good job of year-round maintenance work.
First, the overall work of the Ministry of Engineering this year:
The Ministry of Engineering to ensure that the normal operation of the hotel's power to further strengthen the maintenance and operation of equipment management, strengthen the plan maintenance, equipment inspection, to ensure that the fire, elevator, power distribution, central air conditioning, water supply system, kitchen equipment and facilities, such as the normal operation, in particular, to enhance the Department of Restaurants, Recreation Department, the Department of the facilities of the room the rate of completion and comfort. Comfort. Further increase the energy management efforts, strengthen the cost consciousness, improve the management of consumable materials, facilities and spare parts management, and vigorously grasp the potential and repair the old and waste work.
Strengthen personnel training, service awareness training, service skills training, and strive for multi-skilled personnel, make full use of human resources, improve service, improve the image of the back office, and promote the quality of work to a higher level.
Second, the Ministry of Engineering to focus on the following work:
1, pay close attention to the Ministry of Engineering staff training and assessment work, from courtesy and manners, grooming, service awareness, service procedures, service quality, etc., to improve work skills, improve efficiency, improve the image of the work to achieve multi-purpose, to cultivate a comprehensive craftsmen, such as electricians must be from the strong power maintenance to distribution, fire, central air conditioning, elevators and other aspects. The central air-conditioning, elevators and other aspects of technical integration. The Ministry of Engineering technicians to implement the survival of the fittest, skills assessment. For some of the old staff fatigue, injecting new vitality, personnel appointments do not engage in a pool of stagnant water, the introduction of competition and elimination mechanism, as the saying goes: a door hinge is not worm-eaten, flowing water does not rot. Take the able and diligent to retain, inert, mediocre out of the way, in order to make the whole group at any time competitive and energetic. Hope that through training, assessment, so that the engineering staff are full of enthusiasm to create a comfortable hardware environment, to provide guests with comfortable service products, to completely change the guerrilla, fire-fighting team, oil soldiers image, so that the backstage service is also full of rich hotel atmosphere.
2, improve the work of the service program, strengthen the initiative, coordination, coordination with the departments, especially between the front and back office departments, between the team, the upper and lower levels of the work between the timeliness, effectiveness, do not shirk, do more. Each team to strengthen the equipment and facilities of the daily inspection, according to the standard route inspection, the responsibility of zoning, responsibility to the person. And by the maintenance team on a regular basis on the use of facilities in various departments to talk about the use of maintenance knowledge, put an end to barbaric operation.
3, in accordance with the maintenance system, to grasp the large key equipment plan maintenance, do a good job of elevators, central air-conditioning, fire, power distribution, water supply system of the seasonal overhaul, routine maintenance, especially for the central air-conditioning in the spring maintenance process on the host and its supporting cooling towers, water pumps, end fan coil, water system cleaning and maintenance, careful debugging, to ensure that the central air-conditioning smooth operation of the safe Summer. Strengthen the catering department, guest room department, karaoke room electrical appliances, decoration, plumbing and other facilities, kitchen equipment, restaurant equipment cycle maintenance inspection. Maintenance must be confirmed by the use of the department in place or not, as the basis for the assessment of the team.
4, set up the concept of cost economy, play the role of the use of the center, sound and in accordance with the energy, materials, repair and waste management system and methods to control the reduction of material consumption, energy costs, strengthen the repair and waste, and strive for further cost reductions.
(1) grasp the quality of engineering accessories, major accessories and materials to register the date of use, track the use of quality and life. Strengthen the investigation and control of the overall quality of accessories.
(2) repair the old and waste to strengthen the assessment of statistics, monthly inspection team repair the old and waste, and resolutely put an end to the replacement of only regardless of the poor work style of careful maintenance.
(3) Reasonable regulation of the economic operation of the equipment, to eliminate the phenomenon of leakage.
(4) implement the energy management approach, strengthen the use of water, electricity, energy checks to eliminate waste.
(5) Strengthen the materials, equipment parts of the fixed management. Establish a good equipment spare parts account, detailed use of each accessory material, easy to control.
(6) strict control of outsourcing projects, water, electricity installation can be resolved by their own installation. Equipment maintenance strictly control outsourcing, as much as possible to maintain their own, try to control maintenance costs.
5, the Ministry of Engineering staff to enhance personal hygiene and grooming awareness, enhance the awareness of personal qualities, learning to master the new standards of star, to create a harmonious and beautiful environment for the hotel.
In short, no matter how big or small things to do to do the best, we also believe that there is no best, only better, only we continue to pressurize ourselves, looking for the excitement of the work, passionate about the cause of passionate about the work of passionate about the enterprise to pour deep love, full of affection for the customer, dedication to the community, a comfortable hotel is bound to become a home away from home for customers.
Engineering Department work plan text content 5
First, 20XX engineering department's work objectives
1, in the continuous inspection and maintenance to ensure the normal operation of equipment.
2, follow up on the engineering problems left over in 20XX, and put forward effective measures to rectify.
3, intervention in the first phase of high-rise and the second phase of the villa project, especially to strengthen the first phase of the high-rise hidden works of investigation and initial inspection.
4, do a good job of high-level reception, to ensure that each employee can be independent acceptance, individually with the owners of the home inspection, and detailed information on the structure of the house and hidden plumbing and circuitry direction.
5, strictly in accordance with the annual training program for training, especially the new staff induction training.
6, July 31, 20XX to complete the first phase of high-rise engineering acceptance, the key to receive the work of information.
7, to complete the first phase of high-rise equipment to undertake and ensure the normal daily use and maintenance.
8, the establishment of facilities and equipment maintenance program, in strict accordance with the plan.
9, do a good job of secondary renovation information review and inspection work to ensure that the renovation of safe construction.
10, do a good job of outsourcing facilities and equipment maintenance unit selection and sign a contract.
11, all the housing data organization and file establishment.
12, with the marketing and the completion of the work of various departments.
13, follow up the construction of the first phase of villa greening last year omission.
15, follow up the first phase of high-level perimeter fence and monitoring system installation.
16, inspect and follow up the division of underground parking lot of the first phase of high-rise and the installation of guide signs.
16, follow up on the first phase of high-rise and the first phase of the villa there are engineering defects in the rectification work.
17, do a good job of the tenants engineering maintenance of paid and unpredictable services, to ensure that the rate of engineering repair shall not be higher than 2%. 18, follow up on the first phase of the villa and the first phase of the high-rise, underground parking plant charges the installation and use of the road gate system.
19, the establishment of equipment files and do a good job of archiving equipment information.
Second, the difficulties and solutions of the Ministry of Engineering
1, after a visit to the nearby neighborhoods of various projects, found that my company's engineering department employees' wages are low, and I hope to get the support of the senior leadership, so as to improve the quality of life of the employees of my engineering department.
2, in 20XX the legacy of the first phase of the villa related information and keys hope to be handed over to my property company as soon as possible, so that our work can be better carried out.
3, part of the underground garage in the first phase of the villa is not threaded, can not be energized, which seriously affects the use of the tenants garage, please group coordination of the relevant departments to solve.
4, in the inspection found that the clubhouse and the practice field did not reserve access port, part of the maintenance of my department can not be carried out, please the relevant construction unit to solve.
5, in order to reduce the first phase of the villa's security risks, I hope that the group's leaders to negotiate, can be installed as soon as possible monitoring system.
6, at present a villa perimeter fence is used in color steel plate and iron, color steel plate is easy to deformation affect the image of the company's projects.
7, the current phase of the villa C2 garage is gross ground, in order to improve the quality of the project, our company suggests the use of floor paint pavement.
8, a villa gutter (eaves trough), many times repair any serious leakage, hope to get the support of the group leadership, can be completely solved, so as not to cause damage to the wall due to its leakage.
9, the first phase of the villa C2 garage did not install intelligent card system, resulting in our company on the vehicle management difficulties, I hope to wait for the support of the group leadership.
10, a villa sub-family installation of the window is too large, seriously affecting the use of tenants, hope that the leaders of the group to deal with the consultation.
11, a villa courtyard door, push and pull difficult, easy to dismantle the serious impact on the use of tenants and the quality of the project, hope that the leaders of the group to deal with consultation.
12, the septic tank of the villa of the first phase adopts rain and sewage combined flow, and the main pipe is not connected with the municipal pipe network, which leads to the speed of septic tank filling up, and we hope that the leaders of the group will deal with it through consultation.
13, the first phase of the villa sub-unit so far, there is no installation of access control intercom system, seriously affecting the use of tenants.
15, a villa so there are facilities and equipment, so far the developer did not require my property company to participate in the acceptance, so that it directly take over the management.
Problems:
1, the implementation of the departmental system to be strengthened, the development of a series of measures are often not well implemented, the assessment has not increased, the assessment is not reflected.
2, due to departmental communication work is not enough, so the cohesion work is not done well.
3, departmental and departmental communication needs to be strengthened, the need to further strengthen the departmental work together.
4. did not strengthen the production process improvement, increase production efficiency and quality
xxx work plan
1, increase the construction of the system, the firm implementation of the target responsibility system, the refinement of job responsibilities. Management must be institutionalized, standardized, procedural, for any disciplinary violations of the phenomenon, should be dealt with seriously in accordance with the system, to make each employee has a sense of responsibility.
2, strengthen up and down communication, collect problems, find problems, solve problems. Make the company united. Work together to do a good job in all aspects of the work
3. Accelerate the optimization of the production process improvement, process improvement of 13 items per month, increase production efficiency to improve quality.
4. Strengthen the company's all products, to reduce production costs for the direction of production, the target amount of 500,000 yuan.
5. The accuracy of the main materials of the parts list of the factory issued orders reached 100%. Other list of materials 98.5% (does not affect the production)
6. Strengthen the sample staff skills training, enhance the qualification rate of customer samples, the target is 98% Satisfaction is 99%