Book catalog of building automation systems

Illustration

1 Fresh air unit

X-1 Fresh air unit (without humidification) control system

X-2 Fresh air unit (with Humidification) control system

X-3 fresh air unit (separate cooling and heating coils) control system

X-4 fresh air unit (air blower frequency conversion) control system

X-5 fresh air unit (with purification section) control system

2 air conditioning unit

K-1 air conditioning unit (single fan, no humidification, no exhaust) control system

p>

K-2 air conditioning unit (single fan, humidification, no exhaust) control system

K-3 air conditioning unit (double fan, no humidification, exhaust) control system

p>

K-4 air conditioning unit (dual fans, humidification, exhaust) control system

K-5 air conditioning unit (air blower frequency conversion) control system

K- 6 Air conditioning unit (with secondary return air) control system

K-7 variable air volume air conditioning unit (total air volume control, ordinary terminal) control system

K-8 variable air volume air conditioning unit (Total air volume control, reheat type terminal) control system

K-9 variable air volume air conditioning unit (total air volume control, fan type terminal) control system

K-10 variable air volume Control system of air conditioning unit (constant/variable static pressure control, ordinary terminal)

K-11 Variable air volume air conditioning unit (constant/variable static pressure control, reheat terminal) control system

K-12 variable air volume air conditioning unit (constant/variable static pressure control, fan type terminal) control system

K-13 clean air conditioner control system

K-14 purified air conditioner Control system

3 Cold and heat sources and exchange stations

L-1 refrigeration station (primary pump system) control system

L-2 refrigeration station (secondary pump system) stage pump system) control system

L-3 external melting ice storage control system

L-4 internal melting ice storage control system

L-5 heat exchange Station (interconnection system) control system

L-6 heat exchange station (interconnection system, secondary pump frequency conversion) control system

L-7 heat exchange station (mixed water system ) control system

L-8 thermal storage control system

L-9 refrigeration station (air cooling unit) control system

L-10 water source heat pump control system

4 Water supply and drainage

S-1 High water tank water supply control system

S-2 Frequency conversion pump water supply control system

S-3 Domestic hot water supply control system

S-4 Sump drainage control system

5 Power transformation and distribution and power lighting

D-1 High and low voltage power distribution Monitoring system

D-2 Elevator and escalator control system

D-3 Public lighting control system

6 Control equipment, actuators and sensors

Y-1 Frequency converter control schematic diagram

Y-2 Air supply fan and exhaust fan control schematic diagram

Y-3 Exhaust air and smoke two-speed fan control principle Figure

Y-4 electric water valve wiring schematic diagram

Y-5 electric air valve wiring schematic diagram

Y-6 temperature and humidity sensor wiring schematic diagram

Y-7 flow meter wiring schematic diagram

Y-8 air valve actuator installation diagram

Y-9 electric regulating valve actuator installation diagram

p>

Y-10 air duct type temperature sensor installation diagram

Y-11 water duct type temperature sensor installation diagram

Y-12 water duct type pressure sensor installation diagram

Y-13 flow transmitter installation diagram

Y-14 water flow switch installation diagram

Y-15 pressure differential switch installation diagram

7 Project Example

Shandong Weifang International Finance

Building construction equipment monitoring system

Jilin Provincial Local Taxation Bureau Comprehensive Office Building Construction Equipment Monitoring System

Shandong Province Jiaonan City Electric Power Dispatching Center Construction Equipment Monitoring System

Beijing Hotel East Building Construction Equipment Monitoring System

Dalian Futures Building Construction Equipment Monitoring System Project

Wuhan International Convention and Exhibition Center Construction Equipment Monitoring System

Tsinghua Tongfang Science and Technology Plaza Construction Equipment Monitoring System

Construction Equipment Monitoring System for Block D, Phase II of Tsinghua Tongfang Science and Technology Plaza

Construction Equipment Monitoring System for Zone II of the Great Hall of the People’s Thermal Renovation Project

New CCTV Station Site Construction equipment monitoring system for the main building of the construction project

Shandong Provincial Cancer Hospital Clean Air Conditioning System Automatic Control Project

National Olympic Sports Center Athletes Apartment Building Equipment Monitoring System

Nanjing Subway North-South Line-Phase Project Construction Equipment Monitoring System

Changchun Municipal Government New Office Building Construction Equipment Monitoring System

S Appendix

Techcon (Taikang) Control System Introduction

……