How to apply for a procurement report to write a complete

How to apply for a procurement report Part 1

Dear company leaders:

With the increasing number of new recruits, the existing computers have been unable to meet the needs of the work, coupled with the fact that some of the computers are in disrepair and can not be used. In order to improve office conditions, improve work efficiency. Therefore, we are applying for the configuration of 15 desktop computers. The total cost required is about $ 36,950, hopefully approved!

Philips 19.5-inch monitor 11, the budget for each unit price of 650 yuan / unit.

Philips 22-inch monitor 4, the budget for each unit price of 700 yuan / unit computer mainframe, the budget for each unit price of 1800 yuan / unit.

Office of the existing 36 computers (35 units can be used), Wanfeng 2, 2 servers, a total of 40 units.

Application Department: Personnel and Administration Department

Application Date: 20xx x month x day

Application for procurement report how to write Part 2

XX City (County) Finance Bureau leadership:

XX Municipal Hospital is a city to the superior medical care, health care, mental rehabilitation, teaching and research as one of the big specialties small comprehensive hospital, responsible for the medical care of the XXX million people. The hospital is responsible for the medical service of XXX million people. Founded nearly ________ years, through continuous development, has gradually established and improved, opened XXX beds. In recent years, the hospital has always adhered to the "patient-centered" guiding ideology, to strengthen the construction of medical ethics and medical style, and strengthen the quality of service, for the urban workers' medical insurance designated hospitals. Due to the backwardness of the hospital's medical equipment, in the current medical market competition is more intense in the case has lost many advantages, the hospital currently only has the general type of medical equipment, has been overdue for service, frequent failures, far from being able to meet the clinical requirements.

According to the Ministry of Health medical equipment configuration requirements, in order to actively participate in the market competition, and strive to improve the hospital's medical level, and constantly increase the social and economic benefits, the hospital intends to introduce Siemens whole-body spiral CT machine, Siemens 800 mA X-ray machine, nuclear magnetic **** vibration, color transcranial Doppler and other large-scale equipment. The total investment of the project is RMB XXXX million. Source of funds: the use of "Nordic Investment Bank" loan XXX million U.S. dollars (equivalent to RMB XXXX million), the rest of the hospital's self-financing solution. After the completion of the project, the hospital's annual income of up to XXXX million yuan, the annual profit of more than XXXX million yuan, the annual benefit of XXX million yuan, ________ years can pay off all the loans.

Applicant:

Date of application:

How to apply for a procurement report Part 3

× × City Bureau of Foreign Trade:

Rhinoceros horn is the raw material of medicinal materials required by our company to export valuable proprietary Chinese medicines, the production of proprietary Chinese medicines exported for the exchange rate is very high, and it is also a bestseller for export. At present, rhinoceros horn imports are tight, the price is rising, the future is not easy to import. In view of the history of the city's rhinoceros horn and rhinoceros horn products have the following sources:

First, the city's jewelry company in the city and foreign ports can be purchased part of the rhinoceros horn and rhinoceros horn products.

ii. ......

iii. ......

In order to support the production of proprietary Chinese medicines exports For the country to create more foreign exchange income, after the study of the following views:

First, please assist the Bureau to the above relevant units to contact the above rhinoceros horn and products received after the transfer of my company's production of proprietary Chinese medicine exports.

Second, considering the current import and domestic price gap is very large and the actual situation of foreign trade brother company export tasks, whether the value of foreign exchange can be exported according to the value of the settlement, but also according to the price of imports discount RMB settlement.

The above comments when or not, please review and approve.

Applicant:

Date of application:

How to apply for a procurement report Part 4

Company Leader:

My department XX used a Tsinghua Purple computer, the company was established to buy and use so far, has been seriously aging, not only running slow and often from time to time to crash, automatic shutdowns, resulting in some of the documents have been lost, the machine has been repaired 3, 4 times, still sometimes the above phenomenon occurs. This machine has been repaired 3 or 4 times, but still sometimes have the above phenomenon occurs. Now completely unable to boot, after repair is still no avail, resulting in party information system and retired staff information system information loss, seriously affecting the normal work. Now special application for the purchase of a computer.

Please approve.

XXX

Year Month

How to apply for a purchase report Part 5

Dear school leaders:

Hello! With the completion of the school's new mechanical training base, can be put into use immediately, our mechanical and electrical group of training base equipment will be further improved and increased, the mechanical and electrical group of training base development plan is reported as follows:

1, the original equipment in the training building 4, to the first and second year students used for practical training classes, the first year students' practical training is mainly arranged in the drawing room, machine room, etc., to simulate The practical training of the first-year students is mainly arranged in the drawing room, machine room and so on, mainly simulation training. Second-year students of practical training courses are mainly arranged in the number of car workshop, machining center workshop, etc., in order to practice the operation of practical training, but the raw material of the workpiece can be used in plastic, 45 steel and other lower-priced, softer texture and other materials.

2, the alternation of work and studio production arrangements in the new mechanical training base.

3, the original 4 building on the first floor of the warehouse room, the relevant special machine tools, raw materials and cutting tools, etc. moved to the new mechanical training base, changed to the EDM workshop, intends to purchase 18 sets of fast-wire cutting machine tools. In order to meet the mechanical professional mold students in the classroom use.

4, the original 4 building on the second floor of the carving machine workshop inside the equipment has been eliminated, classes, practical training are not in use, so the plan is to donate the inside of the carving machine to other schools. Empty out after the intention to be divided into two, half as a small machine room, which puts 10 computers for CAD, mechanical entity design, industrial product design skills training group to use, the other half of the intention to be used as a showroom for students' work, used to store the excellent work of freshman and sophomore students.

5, the new mechanical training base and the first floor of Building 4 of the new EDM workshop according to modern standards of factory design and layout, requiring the school's General Affairs Department in addition to the layout of water, electricity, gas, etc., but also to be arranged with a complete sewage and exhaust system.

6, skills training group of clamping, electrical and electronic, CAD, mechanical entity design, industrial product design will be arranged in the training building 4 building. Digital car, digital milling, general car and machining center combination arranged in the new mechanical training base.

7, the new mechanical training base **** covers an area of 1512 square meters, after the actual measurements and calculations, the specific arrangements shown in Figure 1. In addition to special processing machine tools need to be moved out of the original Building 4, other machine tools need to be newly purchased. Specific purchases are as follows:

Application Department:

How to apply for a purchase report Part 6

Company Leader:

The unit has 45 computers, 42 are in use, and the other three have been scrapped. Some of the computers in use for the purchase of the left and right (including the Ministry of Finance, 2 units, 2 units of the Ministry of Production. Ministry of Technology 2 units, the Ministry of Materials 1 unit, operating 1 unit, the Office of 2 units, the terminus of the dispatch office 1 unit, pound 1 unit, **** count 12 units), low configuration, noise, slow running, often crash, the work has a certain impact. In order to improve efficiency, especially to the leadership to apply for the replacement of this batch of computers. In addition, the Ministry of Production to apply for an increase of 1 computer, the Ministry of Management to increase 2 units, the Ministry of Finance to increase 1 unit, *** counting 16 units. After consultation with the business, finalized the price of each new computer 2990 yuan x 16 = 47,840 yuan.

Updated to replace the old computer for recycling, each priced at about $ 150 x 13 = $ 1950.

Hereby apply, when or not, please approve!

Applicant:

Date of application:

How to apply for a purchase report Part 7

Dear Principal:

Because the school computer plug-in boards have been damaged, many of the work carried out on the impact of the application is now solemnly put in writing, look forward to approval.

In order to respond to the quality of education, efficiency and development of the year with practical action, we are because of the competition for computers to do coursework and blame each other, affecting the unity of the situation has quietly unfolded. According to your hands to develop the whole school to buy the charter and your other relevant instructions, combined with the lack of a plug-in board in our school so that the two computers can not work in reality, as soon as possible to buy has come to the point of no delay, it can be said that the idea of tightening a tight can still catch up - to reduce the mutual accusations. Loosened will regret for the rest of their lives - affecting team unity and quality of teaching. For this reason, the desire to buy a plug board is urgent, and the mood to fight for leadership support is earnest.

I. Funding

Take the school to make up for the purchase of staff advances, teachers donations and other ways to raise funds. In line with the principle of saving money, reasonable financing, to the school financial allocations, teachers actively contribute to the active financing.

Second, the benefit analysis

1, with the plug-in board, the maintenance staff will be installed in the first time, so that the two computers that have been idle since the beginning of the school instantly into work. This will enable teachers to make the leap from manual transcription to mechanized operation, and also save time and pen and paper expenses.

2. The phenomenon of teachers going to Internet cafes for information will be effectively eliminated. The most important thing is to save teachers late at night from the Internet cafes to return to school labor and in the community, the students in the minds of the adverse impact caused by the absence of the resulting bad reputation to the school, but also eliminates the school leadership due to the absence of teachers and personally patrol the school's labor.

3. With the plug-in board, the number of people fighting to use the computer will be reduced by two. Although the weaker ones fight and lose, when the winner sees the loser's face full of indignation and gnashing of teeth, I believe the winner's heart is not happy, which seriously affects the winner's mood when using.

Third, the instructions

1, in view of the many bad sites on the Internet, the leadership is worried that we can not stand the temptation to resist the corrosion problem. I installed antivirus software at the same time, will also install a MM and bad site shielding software, when the beautiful MM and bad site firewall isolation, not to mention logging bad site, even if it is a beautiful MM chat, it will be the luxury of a lifetime. The first thing you need to do is to get your hands on a new computer, and you can do it on your own.

2. Given that these two computers will increase the cost of electricity, it is possible to reduce the wattage of light bulbs or to increase the cost of electricity. This can be solved by reducing the wattage of light bulbs or removing lighting equipment.

3. On the issue of loss of plug-in boards, it can be solved by installing heat dissipation equipment or reducing the voltage.

I am looking forward to the approval!

Applicant:

Date of application: