Safety construction agreement

Nowadays, there are more and more occasions that require the use of agreements, and the signing of agreements can maximize the protection of their legal rights. A reference to the agreement is how to write it, the following is my collection of safety construction agreement 4, welcome to read and collect.

Safety construction agreement Part 1

Main contract number:

Party A (contractor): Xinjiang Hongyuan Shengtong Electric Power Engineering Co. In order to implement the "safety first, prevention first" policy, clear the safety of both parties, to ensure that the construction of personal, building and equipment safety, according to the and other relevant state laws and regulations, the two sides agreed to sign this agreement.

Article I Project:

Construction Address: Hi-tech Industrial Park, Changji City

Project Content and Scope: Contractor to build all the labor in the installation project

Start Date: June 28, 20xx (subject to the approval of the report on the commencement of construction)

Completion date: August 28, 20xx

Article 2 Safety Target: Eliminate major accidents, put an end to unauthorized command and unauthorized operation

Article 3 Party A's Safety Responsibility

1, before the commencement of construction, Party A should undertake the ability of Party B to undertake the construction of the project safety audit, will be the unit of the safety management requirements, the construction area of the facilities, equipment and so on, the situation of the Party B for a full-scale construction safety and technical briefings, and have written records or information.

2, Party A shall require Party B to develop construction safety measures for Party A's record. Party B in the hazardous production area operations developed by the construction safety measures, Party A shall review and supervise the implementation.

3, Party A assigns a person responsible for contacting, checking and coordinating with Party B to implement the relevant safety regulations.

4, Party A has the right to stop, correct and issue safety rectification notice to Party B in the safety construction, civilized construction problems.

5, Party A has the right to Party B to participate in the construction of technical knowledge of safety and safety work procedures of the random test.

6. Party A is responsible for investigating and reporting statistics of accidents occurring in construction.

Article 4 Safety Responsibility of Party B

Party B, as the contracting unit of the project, shall bear the full responsibility of personal injury or death, equipment and engineering quality accidents, site fires, as well as all man-made accidents caused by its own mismanagement or the negligence of Party B's construction personnel, and shall not increase the Party A's costs or delay the progress of the construction for the sake of it. Party B shall effectively fulfill the following safety responsibilities:

1. Party B shall ensure that the relevant qualification certificates provided by Party B for the labor requirements of the contracted works shall be true, legal and

effective.

2, Party B must carry out the implementation of national laws and regulations on production safety, must develop appropriate safety management system; strict implementation of the "Temporary Electricity Specification", "Construction Safety Inspection Standards", heights ﹑ fire ﹑ groundbreaking ﹑ lifting tanks (pits) ﹑ lifting and other relevant safety construction systems and other safety regulations, systems.

3, on-site construction should comply with national and local laws and regulations on labor safety, labor laws and regulations, to ensure the legitimacy of its employment. Party B must be in accordance with the relevant provisions of the state, for construction personnel equipped with labor protective gear, safety gear.

4, during the construction period, Party B should have a full-time safety management organization, with full-time safety supervisors, (less than 30 people set part-time). At the same time, Party B assigns _ _ as the contact person for safety work. Responsible for construction site safety management, coordination, monitoring work.

5, Party B, all construction activities, must be prepared to safety construction measures, construction of all construction personnel before the construction of a comprehensive technical safety briefing, and in the entire construction process correctly and completely implemented, no measures or no briefing is strictly prohibited construction.

In the dangerous area of operation, may cause fire, explosion, electric shock, poisoning, asphyxiation, mechanical injuries, burns, production equipment power ﹑ shutdown event, must designate a special guardian, the development of special construction safety measures, by the Party review, permission to supervise the implementation.

6, large-scale independent construction projects should also prepare the construction organization design, by the Party and the supervision unit to review the qualified supervision and implementation.

7, Party B for the project's construction machinery, tools and safety equipment must meet the needs of construction, after inspection in line with the safety regulations, in the construction process should be frequently checked and maintained.

8, before the start of work, Party B shall organize all construction personnel to carry out safety education and safety tests, and will be examined by the list of qualified personnel (including temporary additions or replacements) and test scores reported to Party A for the record. Special operators must hold a qualified and valid qualification certificate issued by the relevant departments.

9, before the start of work, Party B should organize personnel to the construction area, the operating environment and the use of Party A to provide facilities and equipment, work equipment, etc. to check and confirm that meet the safety requirements. Once the construction, it means that Party B confirms that the construction site, operating environment, facilities and equipment, work equipment in line with safety requirements and in a safe state.

10, Party B shall not exceed the designated construction scope of construction, should be installed in the construction range of temporary fences or warning signs, and prohibit unrelated personnel from entering the construction site. Without Party A's consent, Party B shall not use Party A's facilities and equipment not related to construction; shall not remove or change Party A's protective facilities and signs without authorization.

11, Party B must accept Party A's supervision, inspection, safety rectification opinions put forward by Party A must be timely rectification and feedback

12, Party B's construction process accidents or unsafe conditions that jeopardize the production and operation, should be immediately reported to Party A, and actively cooperate with the investigation. At the same time, Party B personnel in the construction of personal injury and death, but also must be immediately reported to the local government safety management, public security departments, trade unions to investigate and deal with, and reported by the Party B categorized statistics.

13, in the construction process, Party B's responsibility for Party A's personal injury, equipment damage and fire and other accidents, Party B bears full responsibility and is responsible for compensating Party A for all economic losses.

Article 5: For the liability accidents caused by the third party in relation to the project, the party involved shall solve the problem by itself.

For safety accidents caused by force majeure natural disasters, both parties **** with the negotiation to solve; for Party B should be expected, or have been expected, but did not take precautions caused by the safety of responsible accidents, Party B shall bear full responsibility.

Article 6 A and B contact information and response time: A and B should be sent to each other in writing by working contact list, fax, telex and other means. Both parties shall respond within 8 hours upon receiving the written contact from the other party.

Article VII Construction Safety Deposit

Party B shall deliver to Party A a safety deposit of RMB 5000 Yuan after the signing of the project contract and before the commencement of the construction. Party B in the construction process did not violate the safety management regulations, no personal injury, equipment and above accidents, in the completion of the acceptance of the project will be the full amount of the deposit refunded (without interest); if the construction process occurs in the following cases, deduct the corresponding proportion of the safety deposit:

(1) serious injuries and above personal accidents, fires ﹑ collapses ﹑ lifting and equipment, major accidents, deducting the entire safety deposit;

Article 7 Construction Safety Deposit Safety deposit;

(2) the occurrence of personal injury accidents, fire, collapse, lifting and equipment accidents, deduct 50% of the safety deposit;

(3) found in violation of the safety management provisions of the behavior of each person, the deduction of 100-200 yuan.

Article VIII Liability for breach of contract

1, Party B provides invalid qualification materials, Party A has the right to terminate the contract, and Party B will bear all the losses caused by this.

2. Violation of laws, regulations, rules and regulations and the provisions of this agreement, resulting in construction safety accidents, in addition to accepting the relevant government departments to deal with, the party at fault shall bear the liability of 1000 yuan / person.

3, Party B did not set up a safety management organization, failed to correctly and comprehensively implement the safety measures, construction design; construction personnel did not master the characteristics of the project and construction safety measures; construction machinery for the project, work equipment and safety protection gear does not meet the construction needs, Party A has the right to require Party B to immediately stop rectification, the consequences and losses caused by Party B.

4, Party B personnel safety work procedures failed the sampling test or special personnel without a license, Party B shall bear the responsibility of 100 yuan / person breach of contract.

5, Party B uses Party A to provide facilities and equipment, work equipment and other damage caused by Party B should be compensated.

6, Party B personnel to other production areas without reason or unauthorized use of Party A's facilities and equipment, but has not yet caused the consequences, Party B shall be liable for breach of contract according to 100 yuan / person.

7, Party B on the Party's proposed safety rectification advice is not timely rectification, every day late, Party B by 100 yuan / day default liability.

8, the construction process of personal injury and death, fire, collapse, lifting and equipment accidents have concealed behavior, in addition to accepting the relevant government departments to deal with, the party at fault shall bear 50000 yuan / times the responsibility of breach of contract.

Article IX A and B agreed on other matters:

1, into the scene must wear a helmet, correctly wear labor protection products, climbing must wear a seat belt, under the tank must be 36 volts of safety lighting, the site has a flammable fire must be opened fire ticket, violation of each time to bear the responsibility of 1,000 yuan in breach of contract.

2, the same person two violations, doubling the penalty each time.

3, the implementation of fixed management, to ensure fire escape, civilized construction.

Article 10 The implementation of this agreement, such as the occurrence of disputes, by the two sides of the consultation, mediation; if the consultation, mediation can not be resolved disputes, the two sides agreed to the project location of the People's Court to file a lawsuit.

A and B must strictly implement this agreement, the legal effect of this agreement is independent of the main contract.

The validity period of this agreement: from May 28, 20xx to December 30, 20xx (the validity period of the security responsibility from the date of entry into force of the main contract to the expiry date of the warranty period).

This Agreement shall enter into force after it is signed and sealed by the legal representatives or authorized agents of both parties.

This agreement is in four copies, two copies each.

Article 11 The following 1-7 items are attached to this agreement.

1, the contracted project requirements of the relevant qualification materials

2, Party B construction technicians, the person in charge of the work of the relevant certificates

3, special operators on the qualification certificates

4, Party B construction personnel safety and technical knowledge and safe work procedures test results

5, construction safety and technical organization measures

6, large-scale independent projects.

6, the construction organization design of large-scale independent projects

7, the construction of safety technology delivery

Party A (seal): Xinjiang Hongyuan Shengtong

Electric Power Engineering Co. Party B (seal):

Entrusted by the agent: Entrusted by the agent:

Contact phone number: contact phone number:

Signed at: Xinjiang Hongyuan Shengtong Electric Power Engineering Company Conference Room

Signing Time: May 28, 20xx

Safety Construction Agreement Part 2

In order to ensure the fire safety during the decoration period, in compliance with the relevant provisions of the XX Municipal Government, the decorative decoration project area has implemented the fire prevention responsibility system on a grade-by-grade basis during the period of decoration, and now the Property Management Office (Party A), together with the owner (user) and its commissioned decoration project Decoration construction unit (together with Party B), entered into a fire safety power of attorney as follows:

Party A's responsibility:

1, based on the design program validated by the Fire Services Bureau, the supervision of the renovation project;

2, to coordinate the construction of Party B into the field;

3, is responsible for the introduction of fire protection facilities to Party B and the relevant provisions of the community related to the project;

4, is responsible for the construction of the project;

4, is responsible for the coordination of Party B construction of electricity, water and fire matters;

5, Party B construction of fire safety has the right to supervise, in the discovery of Party B construction of unsafe factors, have the right to order Party B to correct, until the order to stop work, and reported to the relevant departments to deal with the law.

Party B's responsibility:

1, responsible for the community unit room decoration works of fire safety responsibilities, to ensure that no fire accidents.

2, the establishment of the site safety officer (name:), to Party A to understand the construction-related fire safety matters, and is responsible for the construction of fire safety.

3. Use of electricity, water and fire shall be approved by Party A before proceeding:

3.1 Electrical operators shall have electrician's license, which shall be shown in the original, and the copy shall be filed with Party A for record.

3.2 When carrying out the fire work, should go to Party A for the fire certificate in advance, the operation should be carried out by licensed welders, and illegal operation is strictly prohibited.

4. Party B shall comply with Party A's management system.

5, Party B need to use flammable items in the construction, must do a good job in advance of the storage of flammable products, there should be a person to report to Party A, approved by Party A before they can be brought to the designated cabinet responsible for the amount of items stored can not be too much, to the limit of the day's use, after the construction is completed, the remaining items must be taken away from the scene.

6. Smoking is prohibited in the construction area.

7, the construction area should be equipped with fire-fighting equipment, the number of portable fire extinguishers equipped with at least two.

8, fire accidents should be dealt with in a timely manner, and quickly notify the Party and call 119 alarm, and truthfully report the cause of the accident, protect the scene, cooperate with the investigation.

9, the site of the day decoration waste should be promptly cleaned up to the designated area, especially shavings sawdust should be removed every day, set up a person in charge of construction waste or garbage is strictly prohibited to block the fire escape, is strictly prohibited to cover, damage, misappropriation of fire protection facilities, to ensure that the site is clean.

10, Party B construction personnel off work, should carefully check the construction site to prevent leaving fire hazards, personnel must leave the electrical equipment power cut off.

11, Party B should be construction personnel for safety education, Party B should actively cooperate with Party A's supervision and inspection, and the development of a safety system, this agreement in triplicate, the three parties to take a.

Party A, the construction site should be carefully inspected to prevent leaving fire hazards, personnel must leave the electrical equipment power cut.

Party A (property service enterprises):

Party B: (owners) (decoration construction unit)

year

Safety Construction Agreement Part 3

Party A: XX (hereinafter referred to as "Party A")

Party B: XX (hereinafter referred to as "Party B"). "B")

In order to strengthen the safety management of xxxxxx, to ensure the safety of electric circuits, electricity, by the A and B **** with the consultation, the development of security agreements.

I. Party A's responsibility

1, Party A shall conscientiously implement the "People's Republic of China *** and the State Production Safety Law", "People's Republic of China *** and the State Electricity Law" and the relevant provisions of government departments and Party A's management requirements for safety work.

2, Party A shall provide Party B with pre-job professional training and familiarize with the distribution map of the unit's power lines, and only after passing the training and examination shall Party B be allowed to enter Party A's power distribution room for operation.

3, Party A should be clear to Party B to the work environment and the key critical parts and other safety precautions, to provide Party B with a safe and standardized . Operating environment, there are hidden dangers of insecurity to be resolved by Party A. If there are unsafe accidents resulting in injuries or economic losses, Party A is fully responsible.

4, the party B raised security issues, should make every effort to solve.

Second, Party B's responsibility

1, Party B must hold the relevant documents issued by the state on duty, strictly abide by the operating rules and regulations, and shall not violate the rules of operation.

2, Party B should conscientiously implement the "People's Republic of China *** and the State Production Safety Law", "People's Republic of China *** and the State Electricity Law" and the relevant provisions of the government departments as well as the Party A's company on the safety of the management requirements, and strictly abide by the provisions of the safety management.

3, Party B should be on call when problems arise, and during the operation shall not leave the post without authorization or find someone to take over, to do a good job of all the records and registration work to ensure safe operation.

4, Party B personnel are not allowed to private use, demolition of Party A unit of electrical facilities, in the course of the work, must be equipped with their own, the use of qualified (by the relevant departments of the inspection and qualification) of the professional tools of the electrician, or else, resulting in any violation of the operation of the Party A and B and third-party injuries and economic losses, Party B is solely responsible for the Party A is not liable.

Third, this agreement is not exhaustive, all in accordance with national laws and regulations. If the content of this agreement and national laws and regulations are in conflict, the national laws and regulations for the implementation of standards.

Fourth, this agreement in duplicate, A and B each party to sign a copy.

V. This agreement has been implemented since the date of signature and seal.

Party A: XX

XXXX year XX month XX

Party B: XX

XXXX year XX month XX

Safety Construction Agreement Part 4

Party A: Laohekou Xinjing Science and Technology Limited Liability Company

Party B: equipment and facilities pipeline insulation party responsible for:

First, the purpose: for the maintenance of both parties **** the same interests, to ensure the quality of construction and safe production, to maintain good working order and construction site safety, health environment, by the A and B sides of equal consultation, signed this safety construction agreement.

Second, the construction period: year month to year month.

Third, the content of the agreement:

1, Party B into the plant construction, must be agreed by the person in charge of Party A, and designate the person in charge of on-site construction, the construction site set up a safety supervisor, to facilitate the coordination of the construction process, contact; At the same time, in the case of not affecting the safety of Party A's production and operation under the premise of the Party A need to provide Party B with the construction of convenient conditions and services. At the same time, without affecting the safe production operation of Party A, Party A shall provide Party B with construction facilities and services.

2, Party B before the construction, the construction personnel must be safety education, and signed with Party A, "safety construction agreement", safety agreement is not signed the project shall not start; Party B shall not be subcontracted to other construction team after obtaining Party A's project, such as Party A confirms the fact that there is subcontracting of the project, Party A can require the stoppage of work or cancel the right of construction of Party B, and look for another supplier to cooperate.

3, before the start of construction, Party B must develop a safe construction program, develop safety precautions and emergency response measures, and submit to the Party A safety supervision and management department for the record.

4, Party B construction personnel into Party A's plant must strictly wear labor insurance products, safety protection equipment, special operators must also be licensed to work.

5, Party B should set up obvious warning signs in the construction area, for a longer period of time centralized construction projects to do closed processing, construction personnel should be in the construction area activities, do not enter the non-construction area, Party A personnel have the right to check at any time.

6, Party B's construction team must be equipped with safety protection equipment in place, effective safety measures, or not start work; construction process caused by accidental personal injury or accidental damage by Party B is responsible for.

7, the construction process, such as the need to use water, electricity, etc., Party B must apply in writing, and agreed by the person in charge of Party A, designated by the professionals to receive water, electricity location, and to ensure that the electrical wiring and plumbing connection specifications.

8, the construction process, such as special operations, such as heights, lifting operations, etc., should be in strict accordance with the requirements of the special operations, equipped with safety protection supplies, facilities, such as scaffolding, safety belts, helmets, etc., or not work.

9, construction vehicles into the plant speed shall not be greater than 5km / h, the factory must be checked by the guards on duty, the items carried with the car must be signed by the person in charge of A and B to confirm the release.

10, the construction process, Party A supervision and inspection system, the right to carry out inspections at any time, the right to stop unauthorized operation, the right to violate the safety provisions of the act of punishment or order the construction team to stop work and rectification.

11, Party B in the construction process the day of the garbage must be cleaned up on the same day, the end of construction should be thoroughly cleaned up the construction site to achieve the end of the work, the end of the material, the site is clear, cleaned up the garbage properly disposed of, and therefore cause pollution, traffic and other accidents by Party B is responsible for.

12, other outstanding matters to be resolved by the A and B negotiation.

Six, this agreement in duplicate, the A and B each party, with the same legal effect, the agreement from the date of signature (seal).

Party A (official seal)

Party B (official seal)

Representative:

Representative:

Year Month Day