In our ordinary daily life, the letter of commitment to us more and more role, the letter of commitment itself, although no legal effect, but there is a binding effect, sign the letter of commitment, you have to test the integrity. So, how to go about writing a letter of commitment? The following is my compilation of the work period commitment letter 7, I hope to help you.
Work schedule commitment letter Part 1xx Luxian Hongxin Construction Labor Co.
I (name) team in your company's project site engaged in the building ( ~ ) layer of work, to ensure that all listen to your management personnel arrangements and commands, this team if one of the following circumstances, I voluntarily accept the following corresponding penalties:
First, the team is not enough personnel, did not meet the required node schedule, I voluntarily subject to the penalty yuan / times;
Second, workers do not listen to your management arrangements and command, I voluntarily subject to the penalty yuan / times;
Third, your request to work overtime at night, if the workers do not listen to the workers, I voluntarily subject to the penalty yuan / times;
Fourth, the day of the amount of work that should be completed must be completed overtime all night, otherwise I voluntarily subject to the penalty yuan / time;
Five, after the sequence of work, the work must be completed overnight overtime, otherwise I voluntarily subject to the penalty yuan / times;
Fifth, after the sequence of work must wait for the acceptance of the former work before, not after the general contractor, supervision acceptance through the construction of the first, I voluntarily subject to a fine of yuan / times;Sixth, did not achieve the required quality or fall hand clear requirements, and did not rectify the time specified, I voluntarily subject to a fine of yuan / times;
Seven, not according to the specification requirements for construction, due to the workers themselves caused a safety accident, each fine of yuan. Safety accidents, each fine of yuan, and all losses by my responsibility;
eight, workers without authorization with the general contractor or supervisory personnel, each fine of yuan;
nine, this class of workers, such as men and women in the living area of the living area, each person each time a fine of yuan;
ten, this class of workers, such as in the dormitory of the private wires, or boil water, or cook something to eat, each fine of yuan; (). The above fine as long as there is a basis, without the need for my signature, can be deducted from the wages)
Unit Name
Project Manager
Signature of the Commitment:
Year Month Day
ID Card Number
License No.
Design Unit (Official Seal):
____ year ____ month ____
Schedule Commitment Part 2First, the construction preparation stage of the organization to ensure
(1) the establishment of a sound project organization system
① as early as possible to establish a project management body suitable for the characteristics of the project, so that personnel at all levels as soon as possible to enter the role of the decomposition of the construction tasks to ensure that the earliest possible implementation of the decomposition of the various construction tasks.
② project method of organizing construction, give full play to the optimal allocation of resources, the advantages of dynamic management.
③ The main management and technical personnel of the project department are composed of personnel with rich experience in engineering and construction. Project manager, project director and other leadership decision-making layer, the relevant personnel from the bidding stage to the end of the project to maintain stability throughout the construction process.
④ According to the nature of the project and project characteristics, the construction operation layer of our project management department as the main construction team, give full play to the advantages of construction to ensure that the implementation of the construction tasks in a compact and orderly manner.
(2) in advance and complete the construction of the preparatory work
① speed up the deployment of resources to ensure that the personnel, machinery and equipment and the required materials in a timely manner into the field.
② To complete the construction of temporary facilities as quickly as possible, to create conditions for the full-scale construction.
③ As soon as possible to prepare the implementation of the program for each division, sub-projects, and timely report to the owner, supervisor review and approval, so that the project as soon as possible to meet the conditions for the start of work.
④ Combined with the actual project, the development of project management and quality assurance of the specific measures and methods to achieve standardized management. To lay the foundation for the smooth implementation of the project.
Second, the construction process organization to ensure
(1) the realization of information management, timely adjustment of the schedule plan and resource allocation: the preparation of the overall construction schedule, and determine the key lines, based on the development of a "monthly, weekly" construction schedule and the construction of each division, sub-projects of the construction schedule. The construction progress plan for each division and sub-project is formulated on the basis of the "monthly and weekly" construction progress plan and the construction progress plan for each division and sub-project. In the process of implementing the plan, all kinds of construction information will be collected in time and analyzed through data processing and analysis, and the schedule plan and resource allocation will be adjusted in time according to the results of the analysis to ensure that the schedule is met.
(2) Strengthen the business system responsibilities, strict implementation of the job responsibility system: strengthen the business system responsibilities, strict implementation of the job responsibility system, the implementation of the construction tasks to the people, to ensure that all the job responsibilities to cover the full range of project construction, no gaps, no overlap, so as to ensure that the quality of human work to ensure that the target duration of the realization of the work.
(3) strict implementation of the site meeting system
(1) held every day the work of the operating team work will be summarized on the completion of the day's plan and arrangements for the next day's work plan, the work will be chaired by the deputy production manager, the captain of the operating team to participate. According to the site conditions to organize temporary coordination meeting, strengthen the site command scheduling work, so that the project to maintain normal and orderly construction.
(2) take the initiative to strengthen the contact with the owners, supervisors and other relevant departments, held regularly every week with the owners, supervisors, design, construction units to participate in the regular meeting of the project, which will summarize the week's progress of the project and the next week's work plan, the urgent need to solve and urgently need to deal with the issue of discussion, and to formulate the appropriate measures to ensure that the next step of the work of the smooth implementation of the project.
(3) timely organization of the project acceptance: the completed project, especially the hidden works in a timely manner to organize acceptance, to ensure that the next process is carried out in a timely manner. (4) develop and strengthen the finished product protection measures: develop and strengthen the finished product protection measures to ensure that the construction process does not appear finished products, semi-finished products due to human factors damage caused by rework, repair resulting in delays.
Third, the construction plan to ensure
(1) the preparation of the project progress plan
① in accordance with the overall principles of construction deployment to prepare the overall construction progress control plan, and according to the project, the amount of work, the construction conditions and construction techniques to be adopted, to be invested in the construction of construction personnel and machinery, etc., to divide into construction areas.
② schedule control plan must be the construction of the site plan decomposition, and based on the decomposition plan, analysis of the logical relationship between the processes, to determine the key line schedule, the rational allocation of resources and the scientific use of resources, so as to ensure that the key line schedule, and ultimately ensure that the realization of the total schedule.
⑵ Preparation of material procurement plan
① One-time preparation plan: after receiving the construction drawings, immediately organize technical and related personnel to carry out drawing review, and timely contact with the design unit to clarify the drawings, and timely preparation of a one-time preparation plan for the material department, so that the material department to grasp the details of the various materials required for the project and the planned time to enter the field to ensure that a variety of materials can be contacted in advance, purchase, reserve, and so on. Contact in advance, ordering, reserves, to avoid stopping the construction process to wait for the material phenomenon and make the schedule delayed.
② plan and make up the plan: according to the monthly construction progress plan, regularly to the material department to provide a variety of materials needed next month plan, at the same time, according to the adjustment of the month's engineering plan, the required materials to make up the plan, so that the material purchases can be targeted to ensure that the monthly plan to be achieved on schedule.
③ Preparation of capital use plan
According to the overall construction progress plan, quarterly and monthly capital needs to be estimated, and the preparation of the use of the plan to ensure that the project prepayment and project settlement can be reasonably used to ensure that the overall progress of the plan to be realized on schedule.
Fourth, the construction technology to ensure
Technically, the technical staff in accordance with the requirements of the progress plan, early construction programs, technical briefing, material preparation plans, and actively adopt new technologies, new technologies, improve labor productivity. Engineering, can use machinery without manual construction, reasonable arrangements for the convergence and insertion of processes, reduce the intermittent time between processes, to achieve orderly and reasonable flow construction, control the construction beat, regulate the labor time, to prevent process stoppages, in order to shorten the duration of the construction period, to achieve the goal of the schedule.
(1) carefully read the map, in-depth investigation of the site situation, according to the actual situation of the preparation of practical technical delivery. The key points of the project, difficult points, develop a reasonable construction program, make construction preparations in advance, and technical assurance measures are effective.
(2) to determine a reasonable construction process, organize the cross construction of various processes, accelerate the construction speed, shorten the effective duration. ?€€?€€(3) Combined with the project progress plan, prepare a detailed material use plan, to ensure that the supply of materials to meet the needs of construction. (4) the construction process firmly implement the "three inspection" system, to ensure that the quality of acceptance of a qualified, to avoid rework phenomenon occurs.
Fifth, the construction environment to ensure
The project department set up a person in charge of the site investigation, local relations coordination, for the smooth construction of the project to create a good external environment. Strengthen the contact with the owner, supervision, design and management units to ensure smooth information exchange. Strengthen the regular meeting system to solve conflicts and coordinate relationships to ensure that the construction progress is carried out in accordance with the schedule. Before the commencement of the project, according to the drawing information provided by the design unit, and pipeline information, geological survey information, design briefings, drawing reviews and measurements carried out, do a good job on-site technical preparations, labor force preparations, material preparations, equipment preparations and other work. After entering the site in a timely manner to do a good job of site and temporary facilities construction work, while doing a good job of underground pipeline survey and measurement of the points of re-testing and other work.
Six, breach of contract commitment
My company if you can not reach the overall schedule target, is willing to a fine of 5, million yuan; every delay of 1, days, is willing to bear a fine of 500 yuan.
Schedule Commitment Part 3To: Xinhua District Animal Husbandry Bureau Fangyuan
If my unit in Xinhua District Animal Husbandry Bureau XXX years of pig standardized large-scale farm construction project B bidding project, in the implementation of the project in the course of the implementation of the project, in addition to our response to all the terms of the bidding documents and the performance of the contract content, and to the project schedule to meet the requirements to make the following commitments:
First, to ensure that the construction is strictly in accordance with the drawings, the relevant norms, and to achieve qualified standards.
Second, the development of construction schedule management organization and safety management responsibility system, equipped with adequate safety production equipment and personnel, and seriously implement the construction of accelerated management regulations.
Third, all the engineering construction construction workers are prepared in advance to speed up the construction period and do a good job of thinking.
v. Ensure that within the construction period, safe, quality and efficient completion of the construction tasks.
Six, after receiving the notice of award, signing the contract for the project, after the construction equipment into the construction conditions, to ensure that all completed within the construction period required by the owner, such as delay, willing to compensate for the total cost of the project 0.03% / day.
Bidder: Henan Fangyuan Construction Co., Ltd (seal)
Legal representative or authorized representative: (signature)
Date: XXX January 17
Commitment: XXX
Time: XXXX XXXXXXXXX
Duration Commitment Part 4To: Co.Ltd.
After After receiving the tender documents of your company, our company will immediately organize the relevant personnel to carry out a serious and detailed study and prepare the tender in accordance with the scope and requirements of the tender documents, now combined with the actual situation of our company on the project related to the contract terms and conditions, duration, quality, safety and civilization of the construction, the settlement of the information, the payment of wages of civil workers, warranty and other aspects of the bidder's commitment is as follows:
1, to the conditions of the contract Commitment: Recognize and accept the requirements of your Bidding Documents and contract conditions of constraints;
2, the duration of the commitment: If the bid is awarded, our company guarantees that after receiving the notice of commencement of the work, the work will begin within the specified time, and to ensure that according to the contractual period, the node requirements for the completion of all construction works;
3, the quality of the project commitment: to ensure that in accordance with the bidding documents of the technical requirements and quality requirements of the construction. Ensure that the project acceptance and achieve excellent engineering standards;
4, safety and civilized construction commitment: strict compliance with the "Chinese People's Republic of *** and the State Safety Production Law", "Regulations on the Management of Safety Production in Construction Engineering", "Safety Production License Regulations" and other laws and regulations, to ensure that there is no major responsibility for accidents, and to achieve the level of safety and civilized construction site;
5, the submission of the settlement of the data Commitment: Within days after the official handover of the project, we will submit complete and effective settlement information at once;
6. Commitment on payment of civil workers' wages: we will establish a civil workers' roster, announce the civil workers' wages on time every month and accept the supervision and verification of the labor security department and your company to ensure that the civil workers' wages can be paid in full and on time;
7. Commitment on warranty: we commit that within the warranty period stipulated in the contract.
Any quality defects of the project and the resulting consequences are responsible for and timely fulfillment of the warranty obligations according to the contract.
Commitment unit:
Legal representative:
Date:
Month and year:
Schedule Commitment Part 5To XXX Co.Ltd:
Huali. Xixi Peninsula Business Center outdoor landscaping project by my construction party, according to the morning meeting of the leadership of the construction period requirements, to develop a construction progress plan, we will be equipped with strong troops, in strict accordance with the construction progress plan, for your service.
From April 8 to April 23, the 16 days, in accordance with the construction progress of reasonable and effective arrangements for construction work, to ensure that to meet the requirements of the construction period before the completion of April 24th.
We will be responsible for the compensation if the delay in the construction period causes losses to you.
Hereby promise
Zhejiang Bader Landscape Project Department
Commitment: Mr. Zhang
XXX April 7
Commitment: XXX
Time: XXXX XXXX XXXX
Schedule Commitment Part 6Giga City, Quality and Technical Supervision: In order to ensure that the Giga City, quality and technical supervision of the weak electricity part of the project inspection and testing building construction. Inspection and testing building weak electricity part of the project construction period effectively realized, fully perform our obligations under the contract, I on behalf of Xiangyu Communications Ltd. to ensure that the construction period of the relevant issues solemn commitment:
1, in the specified time period to submit to meet the requirements of the subcontract for the construction of the construction program and progress plan, and strictly in accordance with the construction program approved by the Ministry of the construction program and progress of the plan to be carried out. In the process of implementation, when we need to change the construction program and progress plan, we must first obtain Party A's consent.
2, in the stipulated period (April 10, 20xx to August 31, 20xx) to complete all the work agreed in this subcontract.
3. Our authorized representative (proxy) will be stationed at the construction site for not less than 24 days per month. Special circumstances need to leave the construction site, must be agreed by the Party before leaving.
4, the site of the construction team, technicians, special trades and important, key processes of the operating personnel to be replaced, must first obtain the consent of the Party, or be willing to bear the delay caused by all the adverse consequences of the work schedule.
5, to ensure that the site construction machinery and equipment sufficient and matching with the construction project, and to ensure its integrity. Without Party A's consent, we will not withdraw any major construction machinery and equipment from the site.
6, in the Party requires the project to catch up with the construction period or a large dry period, to ensure that unconditionally upon receipt of the written notice of the Ministry of the project to catch up with the construction period or a large dry period, to meet the requirements of catching up with the construction period or a large dry period to increase the machinery and equipment, personnel, materials and so on.
Our company solemnly promises:
First, about the supervisory personnel
1, our company will be in the owner's requirements of the period of time to organize the bidding commitment to carry out supervision work, such as there is a reason for the need to replace the supervisory personnel, we will obtain the owner's consent in advance, and to ensure that the replacement of personnel qualifications are not lower than the qualifications of the personnel to be replaced and the requirements of the contract.
2. During the contract period, our company will take all measures to ensure the stability of the supervisory personnel, in order to facilitate the supervision work continuously and normally.
3, if the project needs or the owner requires additional supervision personnel, we will actively deploy qualified supervision personnel to the site.
4, in each year before the winter break or a single project has been completed when the need for supervision of personnel withdrawal, we ensure that in advance to the owner to submit a written personnel withdrawal plan, after obtaining the written consent of the owner in accordance with the plan to organize the withdrawal of supervisory personnel.
5, such as individual supervisors can not be in accordance with the agreement of the supervision contract to carry out supervision services
, once found, the company will be seriously dealt with, and at the same time to accept the owner in accordance with the terms of the contract to take care of the treatment and penalties.
6, our company will organize a special logistics service group for the construction supervision of the project supervision of the supervision staff services, they will organize the supervision of the staff into, out of the field and the life of the security, on the back of the family life 's difficulties to give a timely solution to the site personnel do not have to worry about. At the same time, we will carry forward the company's fine tradition, play our company's organized and disciplined characteristics, focus on the company's essence, and strive to create a good reputation in this project, and contribute our strength to the construction of transportation in XinJ.
Second, on the supervision facilities
1, our company will take a new purchase, deployment and other ways of bidding commitment to supervision facilities (including office and living facilities, communications equipment, transportation, testing and inspection instruments and equipment, etc.) organization into the field, into the field of supervision facilities to ensure that meet the needs of the work and the requirements of the bidding documents as a minimum standard.
2, according to our management system, the company will be responsible for project supervision staff to properly use, management, maintenance of all supervision facilities to ensure that all the facilities are in good working condition during the contract period.
3, such as the need for the project or the owner otherwise required to increase part of the supervision facilities, the company will actively, on schedule, equipped with the corresponding facilities to meet the requirements.
4, such as part of the project has been completed, the corresponding supervision facilities can be withdrawn, we will report in writing to the owner, in order to obtain the owner's consent before organizing the withdrawal of the corresponding facilities.
Third, on the quality of the project
1, our company will send qualified, good business skills, strong sense of responsibility, experienced, strong supervisors to form a project supervision organization, to high-quality supervisors to ensure that the high quality of the project.
2, our company has a perfect quality assurance system and incentives and penalties, and to ensure that the quality assurance system is normal, effective operation, and timely delivery of rewards and penalties, the use of systems and economic levers to constrain the supervisory staff to strengthen the supervision of the quality of the project, to ensure the quality of the project.
3, we will supervise, check the project supervision organization quality education and training, technical delivery, quality disease prevention and control measures and other quality activities to improve the quality awareness of supervisory personnel and business quality, can find problems and solve problems in supervision, and even remind the contractor in advance to take measures to prevent the occurrence of quality problems.
4, we will take ahead of the control (review of the construction report and special construction program, check the construction preparatory work, sampling the quality of raw materials, etc.), the process of control (inspections, side stations, special inspections, etc.), acceptance control (quality data inspection, quality inspection of the project entity, etc.) and other measures to strengthen quality control, to ensure the quality of the project; at the same time, through the supervision of directives, notification of criticism, reworking, suspended At the same time, through the supervision of directives, notification of criticism, rework, suspension of construction, temporary measurement and other means to constrain the contractor to ensure the quality of the project.
In short, through the above measures, we guarantee to achieve the following quality objectives:
One-time acceptance rate of the sub-projects to reach 100%;
Handover acceptance of each construction contract section of the quality score of 93 points or more, the quality of the qualified grade;
Completion acceptance of each construction contract section of the quality score of 92 points or more, the quality of the excellent grade;
The quality of the construction contract section of the construction contract section of the quality score of 92 points or more, the quality of the excellent grade.
Fourth, on the progress of the project
1, the contractor is required to put forward the general progress plan of the project, annual and monthly construction progress plan and monthly report according to the contract requirements, review and supervise its implementation.
2, check the implementation of the progress plan at any time, and compare the progress of the plan with the actual progress, and when there is a deviation, the contractor is instructed to take appropriate measures to ensure the realization of the plan.
3, once a month to check the contractor's construction inputs (including funds, machinery and equipment, material reserves, labor, etc.), and compared with the monthly plan inputs, such as insufficient inputs to affect the progress of the project, and timely instructions to the contractor to increase inputs in order to ensure the progress of the project.
4, to improve the efficiency of supervision: timely examination and signing of the report on the commencement of work, timely acceptance of the process to ensure that the project can be started on schedule, completed in time to move to the next process of construction; strengthen the process of control, timely detection and resolution of problems, not because of the quality and safety issues affecting the progress of the project.
Through the above measures, we guarantee to achieve the following schedule control objectives: to ensure completion on schedule, and strive to complete ahead of schedule.
V. On cost supervision
Carefully review the cash flow plan submitted by the contractor, on-site verification of the number of works and measurement, review and issue payment certificates. Strictly review the day labor, extra work, design changes, price adjustment, recognize straight and carefully do the construction site records, when the contractor requires additional compensation or claims, do a good job of recording and organizing all kinds of evidence and information, for the owners of the cost of a good pass.
Six, on the contract management
1, on the project or any part of the form, structure, quality, quantity and any construction process changes, strictly in accordance with the project contract and the owner of the development of the relevant management approach to the implementation of the project contract and the timely change of the unit price and the number of projects for review and reporting. The contractor's proposed extension of the construction period or change the design cost, on the grounds and matters of its application, verification of all the circumstances, and according to the contractual procedures for the validation of the increase in the amount of change in the design, according to the approval authority under the contract, approved by the owner and the resident supervising engineers, superintendent of engineers to issue a notice of change.
2, supervise the contractor to enter the project's main technical, management personnel composition, the number of the list listed in the contract is consistent with the incompetent main technical, management personnel, and timely supervision of the contractor to replace in order to meet the contract requirements.
3, supervise the contractor's subcontracting of the project, illegal subcontracting is strictly prohibited, the necessary subcontracting of timely review of the views, reported to the owner and the Office of the Superintendent for approval and implementation. Strictly review the contractor's subcontracting in the form of labor.
VII, on production safety
1, supervise the contractor to establish a reliable safety assurance system, the establishment of vertical to the end, horizontal to the edge of the safety responsibility system; to strengthen the individual, the construction team, the Department of the three levels of safety education; improve the production safety management system, safety and technical delivery system; preparation of special production safety construction program and emergency response to accidents in the production of safety, and safety drills; supervise the contractor. Drill; urge the contractor to actively carry out "safe site construction" activities.
2, supervise the resident supervisory body to carry out a monthly safety and civilization construction education, training, improve the safety awareness of supervisors; in each important sub-projects before the commencement of all supervisors to carry out safety supervision of the technical briefings on the project may occur in the safety of the accidents and supervisory methods to be explained to ensure that there is no form of safety accidents.
3, to strengthen the safety of the production of prior control, including: the preparation of safety supervision work plan, review of the report on the commencement of construction and construction of special programs for safety production, supervision of the contractor's safety and civilization of construction technology briefing, inspection and audit of the contractor's use of safety production costs.
4, to strengthen the process of production safety control, the establishment of safety production account and hazardous source account, carefully record the safety supervision log; through inspection, inspection and other measures to timely detection and elimination of hidden safety hazards; through the supervision of directives, notification of criticism, suspension of rectification, punishment and other means of constraints on the contractor to ensure production safety.
Through the above measures, to ensure that the frequency of general safety accidents is controlled within 3 ‰, the accident rate is controlled within 1.5 ‰, and resolutely put an end to the major casualties, no mismanagement caused by or the Safety Supervisory Bureau determined to be responsible for serious and major accidents.
Eight, on environmental protection
In the construction of the leading implementation of cleaner production processes, standardize the construction site, to achieve civilized construction, to take the "whole process of control" of the active management approach, try to avoid damage to the natural ecology, cut down on environmental pollution, compensation for the loss of natural resources, so that the construction of the project to the environment caused by the impact of minimal environmental losses, environmental protection and environmental impact of the project to achieve the minimum loss. The impact of the construction of the project on the environment to minimize environmental losses, environmental restoration costs at least, the best ecological function of the effect, to ensure the implementation of green engineering construction.
Nine, on the construction of integrity
1, our company attaches great importance to the work of integrity construction, resident supervisory bodies must set up a leading group of integrity construction, the establishment of a sound integrity construction guarantee system, increase the work of integrity publicity and education, the integrity of the construction work throughout the process of construction supervision.
2, my company in the resident supervisory body to implement the "sunshine project construction activities", regularly publicize the quality inspection, change approval, office and living expenses such as the use of accepting all supervisors, contractors, leaders at all levels, and even the supervision of the community to sunshine project as a hand to create a full Fine engineering, escorting the rapid development of the project for the star spit.
3, such as supervisors can not withstand the temptation to take, eat, drink, whoring and gambling and other damage to the image of supervision, harming the interests of the contractor and the owner, once found, the company will take criticism and education, dismissal, and even by the judicial authorities to pursue legal responsibility and other measures to deal with the same time, and unconditional acceptance of the owner in accordance with the terms of the contract to be taken by the treatment and punishment.
Through the above measures, we guarantee to make this project a quality project and sunshine project.