Unit typhoon prevention work summary short 5 articles

? Time flies really fast ah, now you may have changed from a handful of novices to a familiar old bird, we have to summarize the work of this stage. To be able to better face the next stage of work. Are you worried about writing a work summary? Considering your needs, I specially I "unit of work to prevent the typhoon summary brief 5", just for reference, I hope to provide you with reference!

? First, fully prepared for the disaster

? First, strengthen the organization and leadership to ensure that personnel on duty. Cancellation of the Mid-Autumn Festival holiday, the development of duty schedules, the implementation of the main leaders in charge of the leaders on duty system, the implementation of 24-hour duty, all personnel on duty. Ensure that the region's 66 disaster shelter managers are all on duty, to ensure that the emergency rescue and disaster relief detachment is fully staffed, divided into two groups, each group of five people, by the xx director and xx researcher as a team leader, ready for disaster relief. Secondly, start the emergency plan, do a good job of mobilization and deployment. Rapidly start the emergency response, in a timely manner to the street issued a notice of disaster prevention and mitigation work, mobilization and deployment of the street to do a good job of avoiding the opening of the point of Taiwan, receiving and resettlement preparations, do a good job of verifying the disaster, disaster reporting preparations.

?14 22 o'clock typhoon landed on the eve of the xx researcher personally led a team of disaster-prone communities (village to community, easy landslide zone) and transfer resettlement of a large number of communities to carry out inspections and guide the good defense work. Third, make good preparations for disaster relief to ensure adequate supplies. Check the disaster relief warehouse supplies, prepare food and drinking water in advance of the disaster shelter, and notify the agreement to reserve business and disaster relief warehouse ready to supply supplies, the disaster shelter to ensure that the affected people have food, clothes to wear, have a place to live, have clean water to drink, to protect the basic life of the affected people.

? The first step is to make sure that you have a good understanding of the situation and that you are able to make the best use of your time. First, timely and accurate reporting of disasters. Strict implementation of the Ministry of Civil Affairs natural disaster situation statistics system, a person responsible for disaster information reporting work, in the prescribed time to report the disaster and disaster relief work. The implementation of the zero reporting system, street and community disaster information reporting channels are smooth, timely and accurate reporting of disaster information. The whole region *** counted 103,630 people affected by the disaster, the house collapsed 105. Second, timely and safe transfer of the masses. Always put the people's lives in the first place, the region's emergency relocation of 9229 people, including centralized resettlement of 3165 people, decentralized resettlement of 6064 people. Third, timely enough to issue supplies. Effective protection of the basic life of the affected people, the disaster shelter *** issued clothing **** 1016 pieces, other living materials discount about xx million yuan.

? Third, quickly carry out post-disaster reconstruction

? First, the development and issuance of work requirements. Rapidly formulate the post-disaster reconstruction work program, and issued to guide the street community post-disaster reconstruction work. The second is to actively coordinate the assistance of the troops. Take the initiative to dock the troops in the area and request troop support. Do a good job in assisting the soldiers and officers to protect the work, timely to the streets and communities to check the food and other security situation, and require the streets to make every effort to ensure that the soldiers and officers have enough to eat, eat well, rest well. *** there are 20xx troops into the rescue and relief and post-disaster reconstruction, become the main force of the rescue and relief work in our region, for the post-disaster reconstruction of our region has made an important contribution. (Among them: the city assigned the 93rd division of the armed police 710th regiment, 278th regiment and Fuzhou City detachment and other officers and soldiers **** 1350, the district double embrace the Office of the coordination of the troops officers and soldiers **** 665.) Third, the entire cadres and workers to participate in the reconstruction. Formation of 30 people emergency rescue and relief detachment, led by Zhang Zaikeng director personally to the streets and communities to participate in the work of clearing obstacles, successively *** 200 people to Wo Shan Street Changle community, teachers' training school, Double Ten Middle School, Gulong Apartment, Crystal Forest, City on the city and other communities, schools, residential communities to participate in the work of garbage removal, road clearing and so on. Fourth, the mobilization of social forces to participate widely.

? Huli District Pei Shan Social Service Center, Xiahui elderly service center, combined with social work, social work, Boai social work and many other social work agencies more than 100 social workers volunteered to go to the front line of the disaster, actively involved in the region's 53 service communities to participate in the post-disaster reconstruction, to help carry out the garbage removal, road clearing, the elderly solace, temporary traffic command, and so on. At the same time to mobilize the region has been registered more than 20,000 volunteers *** with the participation of disaster relief and reconstruction work, infected by volunteers, many residents also consciously join the volunteer team, "social workers + volunteers" has become the region's rescue and relief team in a beautiful landscape.

? The next step in the work of the intention

? Do a good job of special hardship cases, low-income households, low-income families, people with disabilities, key preferential objects, the revolutionary five old people and households in serious disasters and other related people's aid. Do a good job in Nanping City to our district to donate materials issued.

unit typhoon prevention work summary short 5 (Part II)

? According to the coastal typhoon warning issued by the Meteorological Bureau, this year's No. xx Typhoon xx, (super typhoon) is expected to wipe over or land on the northeast coast of xx on the night of the 7th, and land on the afternoon of the 8th to the night or on the coast of xx. In order to ensure the production safety of construction projects, our department insists on the concept of typhoon prevention which is rather ten times air defense than one time relaxation and the principle of prevention-oriented and combination of prevention and resistance, deploying precautions ahead of time to ensure safety in the process of typhoon prevention and resistance. And in response to the typhoon carried out a number of typhoon prevention and flood control work, early implementation, early deployment. Through the inspection of the project department, ahead of time to map out the situation, find problems, the implementation of measures to carry out a comprehensive preventive inspection and rectification work, now on this anti-xx work report as follows:

? First, strengthen the leadership, the implementation of the responsibility

?1, the establishment of flood control and antitaiwan group.

? Group leader: xx

? Deputy group leader: xxx

? Group members:

?2, the flood and typhoon team is responsible for flood and typhoon specific work arrangements, daily inspections, combing, reporting and identification of sources of danger and other specific work;

?3, the flood and typhoon team of my department according to the flood and typhoon emergency plan, and the establishment of a duty system, every day in time to watch the city's meteorological stations, television stations, radio stations and other media release of the typhoon, rainstorms, Gale, lightning and other meteorological disaster warning information, according to weather changes in a timely manner to do site flood and typhoon prevention work.

? Second, the deployment in place, the overall situation, scientific decision-making

? After receiving the notice of the typhoon, my department urgently convened a mobilization and deployment meeting to seriously carry out preparations for the defense of the typhoon, the Group's typhoon prevention and counter-terrorism documents to study and publicize the implementation of the typhoon to ensure that the work of the typhoon prevention of a high standard and no error.

? Third, strengthen the inspection work of the defense against the typhoon, eliminate hidden dangers, and strive to no dead ends, no loopholes

? Project Department received the deployment of anti-Taiwan, immediately organize inspections, found that the problem is corrected in a timely manner, and cite one to do a good job in all preparations to ensure that there is plenty of time, materials and equipment; the implementation of the system, and be ready to start the emergency response plan in preparation for emergency disposal,

? Fourth, the project department seriously implement the layout of the work, check the existence of problems

?1, construction fence reinforcement;

?2, the field and the surrounding area of the drainage inspection and dredging;

?3, large pile machine, equipment inspection work;

?4, temporary mobile home roof reinforcement measures;

?5, the protection of the power distribution box Work;

?6, emergency rescue team personnel, materials, equipment preparation;

?7, the construction units, supervision units of anti-Taiwan anti-Taiwan personnel on duty;

? Fifth, the next step in the work of measures

? In response to the problems exposed in the work of the typhoon and flood control, we will seriously analyze our own shortcomings, and strive to improve and perfect the work, try to do a fine, do, do a good job of all the work, and at the same time, to other departments to learn from the advanced experience of the typhoon and flood control, the establishment, sound typhoon and flood control work of the long-term mechanism for the promotion of the company's safe and smooth production and make efforts.

unit typhoon work summary short 5 (Part III)

? First, typhoon and flood control work carried out

? Project Department for this year's typhoon and flood control work is well prepared. The general manager of the company personally took the lead in organizing and implementing the convening of a special meeting on Taiwan flood control and safety and related measures, and began this year's Taiwan flood control and safety of the overall deployment of the work, targeted preparation of special measures to prevent floods and typhoons, the project department set up a general manager of the company marshalled the leading group of Taiwan flood control as well as the Taiwan flood control emergency response team, and clarify the responsibilities of all relevant departments and personnel, the project department of construction workers to carry out Special education on typhoon and flood prevention and safety for the construction workers of the project department, set up the coordination of work during the typhoon and flood season, command and duty system, reinforcement of temporary facilities, scaffolding, tower cranes and other key parts of the construction site, check and channelize the drainage system, inspection and reinforcement of the temporary power pipeline lines and temporary facilities of the house, the specific circumstances are as follows:

? For this year's No. 9 super typhoon "Chanhon", the higher leadership carried out detailed instructions for the safety of typhoon and flood control, the project also timely understanding of the "Chanhon" movements and other relevant information, and for typhoon "Chanhon".

?1. Typhoon, rainstorms during the weather to follow up at any time, construction workers to avoid going out activities. Must go out should be their own safety work, engineering duty inspection personnel prohibited single person out, out of the inspection should be aware of the construction site and road conditions beforehand, can not act alone, to ensure personal safety. And the establishment of flood and Taiwan temporary personnel settlement for temporary evacuees to rest. Project managers take the lead to eat, live in the construction site line, with everyone with the advance and retreat, **** efforts.

?2. The project manager took the lead in checking and reinforcing the temporary facilities in the living area of the project department, and reinforcing or replacing the loosened steel pipes on the roof.

?3. Prepare a good emergency rescue and response plan for Taiwan and flood control, and make timely changes and improvements according to the actual situation.

?4. The project department for the good work of Taiwan flood control, prepared a more adequate preparation of materials, emergency lights, snakeskin bags, submersible pumps, raincoats, rain shoes, ropes, walkie-talkies, emergency vehicles and so on.

?On the morning of July 10, 20xx, my project department carried out a comprehensive inspection and deployment of the construction site, the results of the inspection are as follows:

?1, the project manager took the lead in organizing the inspection of the materials and equipment on the construction site, materials and equipment susceptible to the impact of the typhoon have been warehoused and strengthened to protect the processing of the site to prepare for the emergency rescue of the materials and medical supplies needed. Drainage facilities to ensure smooth.

?2, temporary electricity management: the construction site of the temporary electricity works carried out a general inspection, the construction of machinery and equipment of the temporary line has been removed, the distribution box door is closed, the site of all construction power cut off.

?3, the construction site living area management: the construction site of the fence check, there are hidden dangers have been reinforced and reinforced; staff quarters have been reinforced and prepared for typhoons and rainstorms.

?20xx, x month x night from 10:00 pm, according to the weather forecast (typhoon orange, rainstorm yellow warning) on-site project department started the emergency plan, by the general manager of the company personally sit in command, the project department on duty to the living area of each dormitory to transfer the information to the 2:00 a.m. to the success of the transfer of all the workers, transfer site for the site of the 15 # room, the success of the transfer of the number of More than 900 people, the project department for the transfer of workers free of charge to provide 11 days of breakfast, lunch, dinner and breakfast on the 12th, to ensure that all the workers eat and live, to ensure the safety of life.

? The total number of participants in the flood control and typhoon prevention project department is 15 people, 24 hours on duty, cell phone 24 hours on, duty personnel from time to time on the transfer of personnel to carry out condolences and safety advice to ensure the safety of workers during the typhoon.

? Second, the shortcomings of the work of typhoon and flood control

? Some personnel are not strong awareness of typhoon prevention and flood control, in recent years, typhoons do not have much impact on the local Shanghai, resulting in some personnel paralysis, do not take it seriously, the Ministry of the project should be strengthened in the future to strengthen the personnel of the typhoon flood control education, and timely publicity of the importance of typhoon flood control work.

? Third, the next step of the work initiatives

? In view of the lessons learned from this typhoon, our next steps are as follows:

?1. Strengthen the publicity and education of the work of typhoon prevention and flood control, and raise the awareness of all the staff of the typhoon, so that all the staff can do a good job of preventing typhoon, typhoon avoidance, emergency rescue, etc., and comprehensively improve the awareness of flood and typhoon prevention and strengthen the ability of self-protection.

?2, in response to the problems exposed in the work of the typhoon prevention and flood control, seriously analyze their own shortcomings, and strive to improve and perfect the work, as far as possible to do fine, do, do good. At the same time, to other brother units to learn from the advanced experience of flood control, the establishment, improve the long-term mechanism of flood control work, in order to promote the company's safe and smooth production to make its due contribution.

unit typhoon work summary short 5 (Part IV)

? After receiving the defense of this year's No. 9 typhoon "xx" warning notice, my street immediately and seriously implement the typhoon prevention instructions and the spirit of the district meeting, the leadership attaches great importance to the timely deployment of the majority of the community people to collaborate, strict precautionary measures, and invested in a large number of manpower and material resources to make the most of the full emergency preparedness and response work, in the district party committee, the district government of the correct Under the direction of the leadership, Lou Shan street and the jurisdiction of the community, the unit's full cooperation, achieved a comprehensive victory in this anti-Taiwan, to protect the lives and property of the people.

? After the release of the typhoon emergency response, the street quickly held a mobilization and deployment of anti-typhoon work will be the main leaders of the street asked the jurisdiction of all the anti-typhoon personnel to improve the position, resolutely overcome the paralysis and carelessness of the mind, for the jurisdiction of the community, the existence of the key hidden dangers of each unit one by one to put forward the preventive work requirements. Communities, units through the network, posting notices and other ways to publicize the knowledge of residents to prevent typhoons and safety instructions during typhoons, timely notification of the latest weather information. Affected by the typhoon, the street assembled 40 people of the anti-typhoon team, each community, each unit organization *** more than 200 people of the anti-typhoon force, the strict implementation of the 24-hour duty system and the leadership of the system, each package of community leaders in-depth grass-roots, around the key hidden dangers and weaknesses in the organization of the investigation, supervise the implementation of precautionary measures, and actively mobilize the transfer and evacuation of people in the old houses, sheds and simple houses, **** transfer and resettlement 117 people, persuaded to evacuate 40 people.

? Immediately after the typhoon, the street leaders in-depth in various communities, enterprises to view the disaster situation, did not cause casualties and major property damage and other accidents.

? The next step of the work initiative

? In view of the lessons learned from this typhoon, our next steps are as follows:

?1. Strengthen the publicity and education on typhoon prevention and flood control work, raise the awareness of all staff on typhoons, so that all staff can do a good job of preventing typhoons, typhoon avoidance, emergency rescue and other work consciously when typhoons come, and comprehensively improve the awareness of flood and typhoon prevention and strengthen the ability of self-protection.

?2, in response to the problems exposed in the work of the typhoon prevention and flood control, seriously analyze their own shortcomings, and strive to improve and perfect the work, as far as possible to do fine, do, do good. At the same time, to other brother units to learn from the advanced experience of flood control, the establishment, improve the long-term mechanism of flood control work, in order to promote the company's safe and smooth production to make its due contribution.

unit typhoon work summary short 5 (Part V)

? By the strong No. 9 typhoon "xx" impact, the Ministry of Supervision to conscientiously implement the spirit of the leadership of the emergency organization agencies, attach great importance to, pay close attention to the development of the typhoon, go all out to quickly organize, coordinate and direct the construction units, supervision of the relevant departments of the Ministry of Supervision to carry out the defense of the typhoon "xx" work, effectively do a good job of typhoon prevention. "work, effectively do a good job in all defense work, minimize the losses caused by natural disasters. Now the relevant anti-typhoon work is summarized as follows:

? First, emergency preparedness

?1, raise awareness and strengthen leadership

? In order to timely and scientific response to unexpected accidents and incidents, the establishment of Xiapu nuclear power project supervision department emergency organization. Emergency team leader: superintendent engineer.

? Deputy head of the emergency team: Deputy Chief Supervising Engineer and department heads.

? Emergency Response Office: located in the Department of Safety Management, Emergency Response Office Director of the Department of Safety Management as the person in charge, members of the safety management personnel and quality assurance department personnel.

?2, emergency material security

? The Department of Project Supervision is equipped with the necessary emergency supplies such as: raincoats, rain boots, disinfection supplies (purple iodine, 75% alcohol), commonly used medicines (band-aids, gauze), first aid items (bandages, sterile dressings), flashlights and so on. Emergency evacuation, you should prepare the necessary drinking water, bread and other food.

? Second, after the typhoon to resume production

? After the typhoon, the Supervision Department requires each construction unit to do a good job of on-site hidden danger investigation, focusing on checking scaffolding, slope, temporary electricity, etc., and immediately manage the existing problems to ensure that the site safety status meets the requirements before organizing the construction. At the same time, the Supervision Department immediately organized an inspection of the site conditions, to understand the site of the various losses, the existence of problems immediately require rectification.

? Third, the main problems and suggestions for improvement

?1, the construction units in the process of Taiwan flood control, there are insufficient emergency supplies, site information boards and other facilities recycling is not in place, after the release of the level Ⅱ emergency response there are still people stranded on the island and other issues, indicating that the construction units of the Taiwan flood control considerations are not deep enough, carefully, and not enough attention. In the follow-up emergency management work need to focus on and improve, require each construction unit to strengthen the knowledge of anti-terrace propaganda, combing anti-terrace emergency plan, the implementation of emergency supplies maintenance work.

?2, Supervision Department in the emergency response after the start of the emergency office to count the personnel, some personnel response is not timely, resulting in the Supervision Department of the emergency response action lag. In the follow-up work, the need to strengthen personnel training and publicity, before the typhoon must always pay attention to the microblogging group of the typhoon dynamics and specific action requirements.