Road Maintenance Construction Contract 1
Construction unit: _______ (Party A)
Contractor: _______ (Party B)
In order to better build a new countryside, in order to continue to improve the village village project, according to the actual situation in the village of Party A, the branch of the Village two committees to study, proposed in the near future will be _______ road hardening.
The two sides negotiated to contract the project to _______ (Party B) for construction, and the establishment of the contract terms are as follows:
First, the project two sections of the road total plant about _______ meters, wide according to the actual topography, (about _______ meters), the thickness of the construction according to _______ meters.
Second, this project uses the roadbed above the bottom layer, by Party B according to Party A's design leveling compaction, cast-in-place concrete method of construction, concrete standard bit C20, cement using _______ standard has not expired and to the full month of the cement, stone size does not exceed _______mm, using body net slag sand, never allow cutting corners, or else caused by all the negative consequences! Party B is fully responsible for.
Third, the project is scheduled to _______ _______ month _______ day to _______ _______ month _______ day, after the construction period of _______ months.
Party B shall not postpone the completion date due to limited construction period, insufficient manpower, and incomplete equipment (except for special circumstances that are irresistible to manpower).
Fourth, the determination of the project payment according to each square meter payment _______ yuan (including labor, materials, water and electricity, freight, machinery and equipment, including the leveling of the roadbed, etc., but clearing and digging of the roadbed more than _______ thickness, the village committee is responsible for the responsibility to bear.) According to the completion of the actual acceptance of the total amount of square meters.
Fifth, quality supervision: during the project, Party A will send special _______ and other two people for quality supervision, Party B must be strictly in accordance with the specific design standards of the project method of construction, unconditional obedience to Party A supervisors of the correct guidance and supervision.
Six, the payment method: Party B advances all the costs of the work period, after the end of the work period, by Party A acceptance of six months after payment, but stay three thousand yuan quality deposit, warranty period after the return to the party.
If within one year, the pavement has quality problems, Party B self-financing raw material funds to repair, the cost is borne by Party B itself.
VII, safety responsibility: Party A must set up a safety first ` concept for construction, to ensure safety and no accidents, such as the occurrence of unsafe accidents, medical expenses in _______ yuan below (including _______ yuan) by Party B self-care, more than _______ yuan (excluding _______ yuan), Party A is responsible for the payment of Party B casualty medical payment of _______%, the rest of the medical expenses shall be at Party B's own expense.
VIII, this contract in triplicate, A, B and each side of the town of one by the management station.
IX. This contract is effective from the date of signing.
Establishment of the contract between the two parties: _______ construction unit: _______
Legal representative:
Contractor:
_______ year _______ month _______ day
Road Maintenance and Construction Contract 2
A: ---
B.
Party B:
Due to more rain this year, the town of South Ring Road Bao Min to **** Hop section 2.6 kilometers of road damage is serious, in order to facilitate the traffic, to maintain smooth traffic, Party A will be the maintenance of the road contracted to Party B, in order to clarify the rights and obligations of the two sides, the two sides have signed the following terms, abide by and implement.
I. Maintenance section: Bao Min to **** Hop section of the South Ring Road about 2.6 kilometers.
Second, the maintenance standards:
1, clean up all the roadside landslides;
2, pavement scraping on the soil compaction, and water-damaged sections of the road to be filled with sand and gravel padding;
3, the entire road paved with sand and gravel, the thickness of not less than 10CM, the road width of not less than 4 meters; 4, improve the roadside ditches to ensure that ditches smooth water flow.
Third, the maintenance time limit: the period from 20--year August 20 to September 20.
Fourth, the cost of the project: the project by Party B package materials, total project cost 206,000.00 yuan.
V. Acceptance: After the completion of the repair works, the A and B organizations to accept the repair works.
VI: Payment: maintenance works by Party B advance construction, engineering acceptance Party A one-time payment to Party B after the project.
Seven, rights and responsibilities
1, Party B must be required by the contract to use sand and gravel soil pavement and compacted compaction, such as not in accordance with the requirements of the construction, Party A has the right to refuse acceptance, refused to pay the project.
2, Party A has the responsibility to cooperate with Party B to coordinate the contradictions in the construction process.
3, after the acceptance of the maintenance works, Party A must pay a lump sum within the year,.
4, such as Party B in the maintenance process, any accidents, all by Party B itself, Party A does not bear any responsibility.
VIII, this contract in triplicate, A, B each party.
Party A: ----
Responsible for: Party B
Contractor:
Month of the year
Road Maintenance and Construction Contract 3
Contractor (hereinafter referred to as Party A):
Contractor (hereinafter referred to as Party B):
20--years. 8.5 flood, along the road surface damage is serious, side ditch blockage, slope side collapse, resulting in vehicles and people walking extremely inconvenient, by the village two committees decided to carry out maintenance of this section of the road. People's Republic of China *** and the State Contract Law and related laws and regulations, in order to clarify the rights, obligations and responsibilities of the two sides in the project contract to ensure the full completion of the project task, in the principle of voluntariness, equality and mutual benefit, by the A, B both sides agreed to sign this contract.
Article I: Project Overview
(a) Project name: road maintenance.
(ii) Project location: .
(C) scope of the project: the whole section of the road length of 1050 meters (including road maintenance, side ditch and landslide cleanup, slope repair)
(D) the total cost of the project: the two sides to determine the cost of the contract works tentatively set at RMB 10,000,000, capital ten thousand yuan whole.
Article II: the project period
According to the two sides of the project period from the date of the year to the end of the month, in the event of special circumstances, the work period is postponed.
Article 3: Quality of the project
Party B will carry out the construction according to Party A's requirements to ensure the quality of the project.
Article 4: Settlement of the project and payment:
The amount of work in this contract is a tentative amount, to be approved by Party A and Party B **** the same as the basis for the final settlement. The completion of the project Party A before the end of the year to pay off Party B works.
Article 5: Party B shall be responsible for the construction of personal safety and civil liability.
Article 6: other agreements
(a) This contract is not exhaustive, by the A, B and the two sides signed a supplementary agreement after consultation, the supplementary agreement and the contract has the same legal effect.
(b) This contract shall enter into force after the signatures and seals of A and B, and shall expire after A and B have fulfilled their obligations under the contract and settled the project payment.
(3) This contract is in duplicate, A and B each party to save a copy.
Contractor (signature): Contractor (signature):
Legal representative: Legal representative:
Year Monthly
Road Maintenance and Construction Contract 4
Party A: __________
Legal representative: _________
Party B: __________
Legal representative: _________
Pu Pian to Zhongmen Cane Road is 22 kilometers long, since June this year, rainy, everywhere collapse interrupted, especially the two landslides of Phu Long and Da Di Aung is more than 130 meters long, the road collapsed seriously, even bicycles can not pass. In order to repair as soon as possible Pu piece to the middle door of the highway, to ensure that the normal pull of sugar cane, by the A, B two sides of the consultation, reached the following agreement.
I. Quantity and content of the project
1. Party B is responsible for removing the earth and rocks of the landslide in two places, namely, Pulong and Dadi Ang.
2. Party B is responsible for filling up 22 kilometers of highway from Phu Piece to Zhongmen Sugar Cane Area, removing landslides along the roadside, and improving the side ditch.
Second, the quality of the project and requirements
1. Party B will remove all the earth and rocks from the landslides in Phu Long and Da Di Aung to ensure that the highway is 5 meters wide, and leave the slope protection.
2. Party B is responsible for repairing the 22-kilometer sugarcane highway from Phu Trong to Nak Mun, removing landslides along the roadside, improving the side ditches and filling in the road surface.
Third, the cost of the project
Party B in the construction of machinery, labor, materials and other costs incurred in the implementation of all costs, *** counted RMB 40,000 yuan (¥ 40,000. 00 yuan).
Fourth, the mode of payment
Party B construction is completed, by the A and B organizations acceptance, the project is qualified to pay a one-time payment of four million yuan (¥ 40000. 00 yuan).
Fifth, the safety responsibility
Party B construction should pay attention to safety, in the construction of all casualties occurring Party A does not bear any responsibility.
VI. Project duration
____ month to month, *** days, every day ahead of the award of 50 yuan, every extension of the day a fine of 50 yuan.
VII, legal responsibility
This agreement in duplicate, A, B, each side of a copy, with the same legal effect, the two sides must *** with compliance. The agreement must be negotiated by both parties to resolve any outstanding issues.
Party A: __________ (signature)
Party B: ___________ (signature)
Legal representative: __________
Legal representative: _____________
____ ___Month____
Road Maintenance Construction Contract 5 Road Maintenance Construction Contract 5 This agreement is the first of its kind in the world. strong> Road Maintenance Construction Contract 5 Contractor: (hereinafter referred to as Party A) Contractor: (hereinafter referred to as Party B) After consultation between Party A and Party B, the two parties agree on the construction matters of the project, and enter into this contract, *** with the compliance with the implementation. I. Project 1, Project Name: ___ Road Maintenance 2, Project Location: ___ 3, Scope of Contract: Road Maintenance 4, Contracting Mode: package materials, package quality, package duration, package safety, package civilization and acceptance of the construction. 5, the contract price: the total contract price of ___ million. Second, construction and quality requirements On the basis of the original roadbed, the uneven section, using bulldozers or excavators to level, and remove the road collapse. Third, the rights and obligations of the two sides 1, the rights and obligations of the contractor the construction phase of the quality, progress, and site quality of supervision and control, participation in the completion of the project acceptance and warranty phase of the relevant work. 2, the contractor's main work: Responsible for the construction safety within the scope of construction of the project. The contractor should strictly implement safety measures in accordance with the relevant provisions, bear the responsibility for accidents caused by improper safety measures and the costs incurred as a result; do a good job on-site equipment, materials care. Do a good job on-site construction records, with the contractor to carry out quality checks: Fourth, the price of the project payment The completion of the project after acceptance of a one-time payment for all the work. V. Safe and civilized construction The contractor shall carefully organize, civilized and safe construction in accordance with the provisions of the relevant engineering construction site management regulations and the provisions of the unified management system of the contractor; the contractor and the general contractor shall have the right to stop any violation of the site management system of the contractor, up to the fine and the termination of the contract. The contractor in the construction process of all safety accidents, quality accidents are the contractor is responsible for their own and bear the corresponding economic responsibility, legal responsibility and all the corresponding economic compensation. Six, the contract is not exhaustive, need to be the A and B **** with the consultation decision. VII, this contract in triplicate, A and B each party, and another copy to the people's government of Tianma Township for the record archives. ★ Rural road construction contract model 4 articles ★ Road maintenance construction contract model