Logistics Performance of Mechanical and Electrical Engineering of Sichuan Dongfang Logistics Co., Ltd.

On April 20 10, the first domestic maglev train designed and manufactured by Chengdu Aircraft Company was safely delivered to Shanghai National Maglev Center.

20 10 year 10 month, 1 1, the transportation equipment is 52.35 meters long, the total freight is 62 meters long, and the company's super-long transportation record is 52.35 meters.

In April of 20 10, February of 65438, and April of 20 1 10, the lower ring equipment of hydraulic turbine was transported for a hydropower station three times, passing through the national highway 108, with a diameter of 7.87 meters.

2010 June 5438+00, transporting nuclear power low-pressure rotors for nuclear power plants, with a net weight of 230 tons, a length of 12.63 meters, a width of 6.07 meters, a clear height of 5.99 meters and a total loading height of 7.06 meters, which is the highest transportation height of the company's bulky items.

On September 20 10, the gasifier transported for a company arrived at the site safely, weighing 420 tons, with a length of 4 1. 1 m and a diameter of Φ 6.1m. After loading, the total cargo weight was 620 tons, and the maximum climbing rate was 8%.

In May 2009, a 600-ton portal crane installation project with a span of 36 meters, a main girder height of 30 meters, a total weight of more than 700 tons and a single piece weight of 109 tons was completed in only 38 days.

20 10 February, 10, it took 7 months to complete the production and installation project of 25,000 tons of carbon black production line in Pingxiang, Jiangxi.