20 10 year 10 month, 1 1, the transportation equipment is 52.35 meters long, the total freight is 62 meters long, and the company's super-long transportation record is 52.35 meters.
In April of 20 10, February of 65438, and April of 20 1 10, the lower ring equipment of hydraulic turbine was transported for a hydropower station three times, passing through the national highway 108, with a diameter of 7.87 meters.
2010 June 5438+00, transporting nuclear power low-pressure rotors for nuclear power plants, with a net weight of 230 tons, a length of 12.63 meters, a width of 6.07 meters, a clear height of 5.99 meters and a total loading height of 7.06 meters, which is the highest transportation height of the company's bulky items.
On September 20 10, the gasifier transported for a company arrived at the site safely, weighing 420 tons, with a length of 4 1. 1 m and a diameter of Φ 6.1m. After loading, the total cargo weight was 620 tons, and the maximum climbing rate was 8%.
In May 2009, a 600-ton portal crane installation project with a span of 36 meters, a main girder height of 30 meters, a total weight of more than 700 tons and a single piece weight of 109 tons was completed in only 38 days.
20 10 February, 10, it took 7 months to complete the production and installation project of 25,000 tons of carbon black production line in Pingxiang, Jiangxi.