The summary is a comprehensive review of the previous period of social practice activities, check the type of text, which determines the summary has a strong objective characteristics. It is based on their own practical activities, the examples and data cited must be completely reliable, conclusive, any exaggeration, minimize, arbitrarily fabricate, distort the facts of the practice will make the summary of the loss of due value. Let me take you to see the quality engineer work personal summary report sample 5, I hope to help you!
Quality Engineer Work Summary Report 1
In accordance with the company's unified deployment and requirements, closely around the "eternal" construction projects, low consumption, high efficiency, quality, on schedule to fully fulfill the management functions of the Ministry of Engineering, in the project management work. In the project management work, we are conscientious and responsible, innovative, coordinating and cooperating, and really doing our best.
The completion of the year's work
1, ___ the beginning of the year began to contact the ground source heat pump, for me this is an opportunity is more of a challenge, and I'm more important to meet such a challenge, for this reason, I use my spare time to collect and more in-depth study of the ground source heat pump related knowledge materials, in order to consolidate my professional knowledge to cope with the challenge.
2. From the middle of March, I assisted Mr. Ye in more than ten rounds of negotiation with the Coral Sand community on the site leveling, and finally both sides decided to implement the project in the following three steps:
1 Both sides clarified the amount of earthwork for blocks A30, A29, and A33, of which 120,000M3 was for block A30, and the same amount of 60,000M3 was for A29 and A33.
2. Both parties specify the construction content: drainage, dredging and earthwork construction.
3The two sides clarified that the unit price of earth leveling is 18RMB/M3.
Finally, the two sides to determine the total price of 3.5 million yuan (one-time lump sum). 3, in mid-March, for the piling construction unit and supervision unit of the bidding work began to do preparatory work.
4, measured by the "River Construction Bureau" to provide the municipal elevation and the actual municipal road elevation does not match, planning to provide four lines of maps and the actual mapping of the land of the data discrepancies, and then reflected to the design institute, the design institute to the actual measurement data to adjust the total evaluation.
5. Drawing up the supplementary agreement of the supervisory unit and the piling unit and the earth leveling contract.
6, with Xiaopan to apply for construction permits, in the pre-application, I apply for a comprehensive understanding of the work and study, familiar with the key aspects of the policy and regulations.
Do everything possible to ensure that the year's objectives set to achieve a better completion of the tasks assigned by the company, the Ministry of Engineering's overall construction has jumped out of a new level.
Quality Engineer Job Summary Report 2
My name is ______, this year ____ year ________ years old ________ after graduating from ________ College, came to ____, into ________ Limited work, mainly responsible for the quality management department of the system establishment, system modification, maintenance system operation. During the tenure of office, the tasks assigned by the leadership and the work within the scope of the post can be completed in a timely and smooth manner, and the work is active and positive, not afraid of hard work, not afraid of tiredness, hardworking, solid. Since the work, in the unit under the leadership of the careful cultivation and teaching, through their own continuous efforts, has achieved significant development and great harvest, now the work of personal summary as follows:
20____ ___ month after entering the ________ Limited company, the first task is to be sent to the company's new research and development of the core products of the Division of ________, as an inspector. Due to the school when the major does not match, so during this period, I redouble my efforts to learn, during this period first of all to familiarize with the production drawings, which also improves my ability to read and understand the drawings,. In addition to the inspection period must first understand the inspection work instructions, familiar with the workshop site process, but also for the future work has laid a solid foundation. In addition to timely record the measurement of real, complete data, for product traceability to provide greater help. In the daily inspection I found the problem, try to find their own corresponding departments to deal with reported to the departmental leadership, encountered their own handling of things can not be dealt with by the higher-ups to deal with, which also increased my experience, and exercise my independence. Through long-term exercise, I have become more and more clear about the process of the work site, more and more familiar with the testing equipment, and more and more close to my colleagues at work. In this period of time my personal ability to have a great improvement, which and the leadership of the care and the help of colleagues around inseparable.
20 ____ ___ month due to the work of conscientious and responsible, inspection ability to improve, serve as the inspection team leader and quality engineer, participate in the review of unqualified products, corrective and development of preventive measures for non-conformity, and rationalize the arrangement of inspector's shifts. In addition, he is responsible for the guidance of on-site inspection work and the preparation and modification of system documents. Since I started from the grass-roots level, I am more familiar with the on-site process and flow, which is helpful for the preparation of the system. Difficulties in the work through to colleagues to discuss with each other, the leaders of the advice, and find network information, so that my ability to a higher level, due to the work performance is better, was named 20____ year the company's outstanding employees.
20____ year due to the rise of work ability, the quality management system is more and more familiar with the idea is more and more clear. Then began to participate in the internal audit, meet the external audit, provide customers with the information they need, the analysis of the quality of the accident situation, providing useful advice. Due to the lack of management personnel, our department staffs have more than one person for more than one job. I added the management and calibration of measuring instruments. The company trained me to train in specialized institutions for measurement management and measurement calibration. After the training, I prepared the monitoring and measurement control procedures and measuring instruments (three major) internal calibration procedures, also through the measuring instruments in order to make a small contribution to the quality of the company.
20____ year has just begun, I will be in the new year, work harder, and in the work to improve their professional ability and experience.
Through the long-term exercise, I have become more and more clear about the process of the work site, more and more familiar with the testing equipment, and more and more close to my colleagues at work. In this period of time my personal ability has improved greatly, which is inseparable from the leadership of the concern and the help of colleagues around me, I have all the ability is the company will train me out, I assessed the title, will work harder to return the company.
The above is the main work experience since I engaged in the work. As a quality management personnel, I am learning while working, step by step forward, in the work of the accumulation of some very useful work experience, but in the future work, I will further strengthen the learning, hard work, and actively participate in the professional theory of learning, and then with the actual operation, and constantly improve their professional skills for the survival of the enterprise, the reform and development of make positive contributions.
Quality Engineer Work Summary Report 3
Time flies, time passes, in this day of resignation and welcome to the new year, looking back on this year's work, I am in the company's leadership and the support and help of my colleagues, with their own professional foundation and work experience, in accordance with the company's unified deployment and requirements, closely around the "Eternal". "Eternal" construction projects, low consumption, high efficiency, quality, on schedule to fully perform the management functions of the Ministry of Engineering, engineering management work in a conscientious and responsible, innovative, coordinated with the real work, do everything possible to ensure that the year's goals set to achieve a better completion of the tasks issued by the company, the Ministry of Engineering's overall construction has also jumped out of the A new level, now 20 ____ a year's work is briefly summarized as follows:
First, the completion of the year's work
1, the beginning of the year began to contact the ground source heat pump, for me this is an opportunity is more of a challenge, and I'm more important is to meet the challenge, for this reason, I use my spare time to collect and more in-depth study of ground source heat pump related knowledge materials to consolidate my professional knowledge, so as to strengthen my professional knowledge. Knowledge material to consolidate my professional knowledge to meet the challenge.
2. From the middle of ___ month, I assisted Mr. Ye to conduct more than ten rounds of negotiation with ______ community on site leveling, and finally both parties decided to implement in the following three steps:
(1) Both parties clarified the amount of earthwork for blocks a30, a29, and a33, of which the amount for block a30 is ________m3, and the amount for blocks a29 and a33 is the same as ________ m3.
(2) Both parties clarify the construction content: drainage, dredging and earthwork construction.
(3) Both parties clarify the unit price of earth formation as ____ yuan/m3.
Finally, the two sides determined that the total price is ______ million yuan whole (one-time lump sum).
3, ___ months in the middle of the month, for pile foundation construction unit and supervision unit bidding work began to do preparatory work.
4, measured "____ Construction Bureau" provided by the municipal elevation and the actual municipal road elevation does not match, planning to provide four lines of maps and the actual mapping of the land of the data discrepancies, and then reflected to the Design Institute, the Design Institute to the actual measurement data to adjust the total assessment.
5. Drawing up the supplementary agreement of the supervisory unit and the piling unit and the earth leveling contract.
6, with ____ apply for construction permits, in the pre-application, I apply for a comprehensive understanding of the work and study, familiar with the key aspects of the policy and regulations.
7, to solve the construction site of the water, power problems.
8, ___ mid-month, due to the a30 block site leveling work time constraints, workload, so I grasp the arrangements for the site of the earth leveling of the work, to take the stubble work, interlocking, the overall approach to promote the work of the upper and lower segments of the work at the right time to ensure that piling construction is carried out normally.
9, in the piling implementation process because of the complex geological conditions, the length of the pile design does not meet the actual geological requirements, I organize personnel to re-examine the geology, overcoming the lack of water, electricity, no construction of temporary setups and other difficulties, to assist the survey unit on time to complete the task of geological survey at the same time, but also to ensure that the piling work is carried out smoothly.
10, ___ the beginning of the month, into the ____ support and earthworks, due to the ____ support and earthworks tight schedule, heavy task, in addition to daytime, the construction unit to carry out a large number of night construction, in order to ensure the progress of the construction, I am often in the ____ winter at night, rainy days and other unfavorable natural factors, such as the conditions of the construction of the site follow up, tracking around the clock for the construction unit to coordinate the solution of the problems encountered at any time. Problems encountered at any time, but also for the earthwork schedule of the main project to start early to create the conditions.
Due to the construction of things involved in the complicated, I have not rested a day since the start of the project, every day have to leave the scene after 9:00 p.m., giving up the opportunity to rest on holidays, and always adhere to the scene in a timely manner to coordinate and solve the construction of a variety of problems encountered.
Second, next year's work plan
1, to strengthen their own learning, improve the level of business
After many years of work experience, I feel that their own burden is very heavy, but also a deep sense of the importance of learning, only to continue to maintain and improve the ability to work and learn personally, in order to have a sustained fighting force and the ability to work and innovation. This year, I strive to broaden my personal knowledge, strengthen the real estate profession and related legal knowledge, strengthen the real estate development pulse and direction of understanding, as well as understanding of the surrounding environment, the development of the same industry, a deep understanding of the company's overall planning, the company's various situations to do a good understanding. In the coming year, I will continue to study as an important program of the work, to improve personal practical work ability and professionalism, in order to adapt to the times and the development of the company, for the development of the company to contribute to the power they should have.
2, grasp "____" business center project quality
"Eternal" business center project is the city's key projects, so grasp the quality of the project is particularly important. I always implement in the management adhere to the "excavation that is carving" the concept of high-quality engineering, the full implementation of refinement, scientific management, seriously implement the quality of the measures to create excellence, carefully do a good job in every process, grasp every link, strict supervision, strict control. While assisting the work of the project supervision company, we gradually form our own project quality supervision system. Supervision-based, self-subsidized, and strive to "eternal" business center project built for the province's best projects.
3, complete the "____" business center project foundation project
In the next year, in order to successfully complete the "____" business center project of the main project, especially the main construction stage of the basement and waterproofing layer of the construction. Taking into account the rainy weather in Hangzhou, as well as to improve the utilization of the company's funds, saving the company's resources, such as the use of small wells in the construction process of the project, such as precipitation to overcome the high water table, the rainy season construction and other difficult problems to the successful completion of the foundation project.
Looking back on the work of this year, although we have achieved certain results, the company's leadership has been recognized, but these achievements can not be separated from the leadership of the company's support and help, can not be separated from the encouragement and assistance of the brother departments, can not be separated from the engineering team's hard work, to summarize the results, I still see a lot of shortcomings, such as enhancing the field management experience, better improve the company's Resource utilization rate and so on. Achievements of the summary just let me more objectively face the actual work situation, but also more encouraging me as well as the team members to continue to work hard, in the next year to achieve better results, and the company *** with progress, *** with the growth of the leadership and colleagues look forward to criticizing the proof.
Quality Engineer Summary Report 4
Time flies, years like a shuttle, blink of an eye more than a year after graduation. During this period, I was engaged in the work of engineering quality management in the sand and gravel bureau of the Water and Power Bureau. In the work practice, I not only deepen the understanding of the theoretical knowledge learned in school, but also on the previous books did not touch or contact not deep knowledge has a further understanding.
As an engineering quality management personnel, I first received quality management training. Through the training, I learned the key points of engineering quality management, engineering quality management specifications and other related professional knowledge. Quality control is the core of engineering construction. Engineering quality is formed by the design quality, construction quality and acceptance quality of a systematic process, is a step-by-step impact on the formation of a comprehensive quality. Construction unit according to the design documents for construction, through our acceptance after the formation of quality. Therefore, in the quality control, on my personal work experience for more than a year, engineering quality management should adhere to the following aspects, in order to be able to realize the quality control objectives of civil construction management.
1, design quality, first of all, we should start from the source, pay attention to the design quality control.
Our design management department is the competent authority for design quality control, they have done a lot of work for this, but because of their workload is relatively large, it is impossible to review in detail, therefore, as the construction management department, before the start of construction, we still need to spend a considerable amount of time to carefully review the design documents, at least to ensure that the start of construction for half a month to the blunders on the drawings as far as possible to deal with the place. If the quality of upstream design documents is very good, in the building, structure, with the other professional stay in the hole buried parts, etc. without error, in the construction process will reduce a lot of changes.
2, construction quality, construction quality is the center of the site quality control, how to ensure that the construction quality management, is the top priority of construction management.
The factors affecting construction quality include personnel, machinery and equipment, construction programs, materials, and the environment. Therefore, construction quality control should also start from the following aspects.
As the site construction workers are not professional quality control personnel, in the initial understanding of construction and quality awareness, there are some deficiencies in the situation, we will require the construction workers to participate in the weekly meeting, directly or indirectly point out the importance of the quality issue, to instill the quality of the project awareness, so that the quality of construction and quality of construction requirements and quality objectives have a basic understanding of the basic and a clear understanding of the situation. In addition, in the weekly meeting every week, for the construction of representative problems such as concrete defects, buried parts positioning offset, etc., together with the subcontractor to analyze, clearly point out the deficiencies, and corrected by a deadline, thus prompting the subcontractor in the management of the continuous improvement of the awareness of quality and nuclear power.
In addition, but also adhere to the "prevention-oriented" approach to strengthen the construction quality of the prior, in the control, the construction of the completion of the quality of the inspection, to the construction process, the quality of the inspection process, and attach importance to the construction quality of the aftermath of the control of the relevant experience to the next step of the work, and continue to improve the level of quality. In the aspect of ex-ante control. In the ex-ante control, the important parts of the construction, are to develop practical, detailed construction program, especially for the construction of the difficulties and possible quality problems, to clarify the specific methods of treatment; in the manpower, machinery and equipment, the arrangement of the construction program, need to put forward a clear request for the subcontractor's pre-construction preparations. Subcontractors in the construction program development, timely technical briefing to the specific implementation of personnel, clear requirements and responsibilities, and to check the preparation process of construction.
In the event of control, through the setting of witness points, the site of the main construction process for quality control. At the same time, often visit the site, inspect the site of the construction situation, not in line with the technical requirements of the construction of timely correction. In addition, in the process of concrete pouring, adhere to the side station, pay attention to the observation of concrete pouring time, concrete supply, weather changes, reinforcing steel protective layer tread and other issues, and effectively achieve the whole process of construction inspection.
In order to improve the quality control, aftermath control is also an indispensable part. In the civil construction process, subcontractors often pay insufficient attention to this aspect. Post-construction control requirements on the one hand, the quality of construction after the timely inspection; more importantly, to the construction or construction after the emergence of always summarize, and into the feedback to the relevant departments, the subsequent construction of the relevant improvements, which is conducive to the further improvement of the quality of the project.
3, acceptance of quality, before construction, the construction process of the key processes set up to witness the point, when the construction of these steps to reach the contractor to notify the constructor in advance.
For the witness point, first through the construction team self-check, in order to obtain the constructor, quality inspector and supervising engineer quality plan signed on the release before, can not carry out subsequent work. As long as these four levels of quality control can effectively fulfill their responsibilities, the quality of the project can be guaranteed. However, because the team and team level quality control personnel are subcontractor technicians and team leaders, so that there is the builder itself, both the construction of the specific implementer, but also its construction results of the verifier, the lack of quality verification of the required independence. Therefore, quality acceptance mainly rely on quality inspectors and supervision engineers.
In the acceptance process, we must adhere to the quality standards, and strictly implement the standards set out in the design documents and contracts. The standard is to test the construction quality of the 'scale, the database is the basis of the construction quality of whether or not the event requirements, must be strictly checked, based on data. In the construction inspection, often encountered contractors put forward this or that reason, request to relax the standard requirements, in this case, each quality inspection personnel should be clear attitude to support the quality standard requirements, strict quality control. For the design does have a problem site can not be implemented, it must be through the normal for change or clarification, and then implemented.
The longer the work, the more I feel the lack of knowledge, ability, such as the use of contractual understanding, the construction progress of the estimated control and as a pivot on the site of the construction of various units of coordination, etc., I feel that I did not do very well. But fortunately, after consulting colleagues, understand the direction of efforts; for progress control, to be carried out as early as possible, as long as the design documents to ensure that no problems, on-site personnel, machinery and equipment, materials in place, the installation of pre-programmed construction schedule for construction, progress control can be basically guaranteed; for the development of on-site coordination capacity, on the one hand, pay more attention to other engineers to deal with how to deal with the problem of attention to learning, and to think more, try more.
In addition, we should think more, try more, consult more, and establish our own way of dealing with problems.
According to the contract and program work is only the most basic requirements of a project quality management personnel, how to flexibly use the contract and program, reasonable solution to many of the contract is not clear or outside the contract of the affairs, is the real consideration of the ability to work. By observing and studying the way other engineers and leaders solve such problems in their work, my working ability has been improved to a certain extent. I know that only through continuous efforts to learn and accumulate, constantly reflecting on progress, quit arrogance, down-to-earth work, improve their ability to deal with problems, in order to grow as soon as possible as a qualified construction quality management engineer.
Quality Engineer Work Summary Report 5
First of all, I am very grateful to the leadership of the company's trust in me, giving me the opportunity to reflect my own self, to improve myself. Thanks to the unit leadership and colleagues around the work of my guidance and help. The relaxed and cordial working atmosphere of the unit, unity and pragmatic cultural heritage, so that I integrate into the company's family, into the work role played a great role in helping. It is my great honor to join this team which is responsible for the long-term development of the enterprise. Now my probationary work situation, responsible for the work of the current stage of deficiencies and my work plan is summarized below.
First: in the work of my main gains, the initial mastery of skills:
1 basic understanding of the product production process; process scheduling, the current situation of personnel, grouping, division of labor methods, job responsibilities.
2 preliminary understanding of the product technical standards; national and industry standards, the company's industry some basic information.
3 Combined with the market, the customer side of the positioning of product taste, according to the implementation of the company's requirements for a clear distinction.
4 mastered the product quality requirements and other related work knowledge; and have to take charge of product quality audit quality control positions required skills. Can be based on product performance customer requirements, reasonable process quality control. And can make the quality control process problems, make the correct cause analysis, judgment, timely treatment of process quality incidents; thus guiding the completion of the inspection, test the implementation of the work.
Second: through this period of time, I found that the work responsible for the current stage of the deficiencies and worthy of improvement are as follows:
1 inspection work using the document; there is no documented inspection instructions, the current production line inspectors are only based on the inspection form of the project to carry out the inspection. Most of the ways and means from past experience and information transfer between each other. Such an operation will lead to inspection of their own, not conducive to the management of inspection personnel.
I plan to create an inspection guideline for production in my department once I have more detailed information.
2 production process quality of the actual situation is not detailed data and records; no data and records of statistics is not conducive to analysis, guidance and control of production.
I will work in the future to plan for the process of first, inspection, final inspection to establish a complete record control; 〈such as the current stage of the implementation of the appearance of the inspection records, records of the number of process failures, defective rework records, the first inspection does not meet the requirements of the record.〉. Efforts to carry out, implement this work, strengthen supervision, inspection, to ensure that the quality control work in practice.
3 At this stage, our inspector's understanding of the quality of the work is not very well understood, some of the new employees do not have the appropriate education and training. So that part of the inspection staff can not complete the product inspection and product performance test work alone.
I plan to suggest that the department to organize the relevant education, training (such as: aql use, mechanical knowledge, hardware knowledge, process equipment awareness, tool use, instrumentation, mechanical literacy, quality concepts, etc.), and combined with the state of the skills of the assessment, evaluation.
4 The management of nonconforming products; at this stage of the management of nonconforming products without detailed records and no ledger system, which is not conducive to the development of quality control work, often make the same problem recurring, can not be a fundamental solution to the generation of nonconforming products.
Quality Engineer Job Summary Report Related articles :
★ Latest quality personal summary of the work of the sample
★ Quality Engineer Job Summary
★ Quality management personal summary of the end of the year work of the excellent model
★ Quality training summary of the sample 3
★ ★ Quality Engineer Duty Report Sample
★ Quality Management Individual Work Summary
★ Construction Quality Individual Year-End Work Summary Sample
★ 2020 Quality Management Year-End Work Summary Latest Sample 5
★ Quality Management Work Summary 5 Summary
★ Annual Quality Work Summary Outstanding Sample