First, the construction unit qualification inspection A4 form
①Submitted content:
1, the list of qualifications for inspection; 2, the unit's certificate of qualification (copy); 3, the business certificate (copy); 4, the organization code certificate (copy); 5, the tax registration certificate ( copy); 6, system certification documents (copy); 7, safety production license (copy). 8, the last three years, the industry construction performance (subcontracting units);
② review requirements:
1, all qualification documents must be the construction unit unit qualification; 2, all qualification copies must be clear and stamped with the project seal, stating the original repository; 3, all qualifications must be in the validity period; 4, the main body can not be subcontracted;
Second, the construction organization design program report A2 table
① Submitted: construction organization design, construction program
② Review requirements:
1, the program should be prepared in the corresponding professional before the start of work; 2, review the preparation of the basis for the completeness of whether there is an expired standards, norms. (For drawings, standards, norms, supervision planning, rules) cited norms and standards are in force; 3, review whether the quality control points are comprehensive, consistent with the owner's requirements, and shall not be in conflict with the Department of Supervision's quality control points. Review whether the quality control points are operable and reasonable. (Consultation with the owner and the construction unit); 4. Review whether the construction methods and measures are reasonable and feasible, and whether they are in accordance with the design and specification requirements. Whether combined with the actual situation on the site; 5, review the construction methods, measures are comprehensive, whether the content of the drawings include all; 6, the construction organization (program) to have a sound HSE management content; 7, review the program of the management personnel is complete, "five", the project manager, construction, the person in charge of technology should be in line with the report. To correspond to the person who signed the process information; 8, HSE program content should focus on reviewing the analysis of sources of danger and measures taken to determine whether it is feasible, whether it is in line with the actual situation of the project; 9, the approval of the construction organization design for the company's technical director, the approval of the construction program for the project manager of the project.
Third, the project management personnel qualification A4 form
①Submitted content:
1, SH / T 3543-G106 quality system personnel registration form; 2, management personnel qualification certificates (copy); 3, management personnel, including the project manager (and the contract is consistent with the letter of appointment), construction \technical person in charge; HSE
2
Manager, quality inspector, construction\technician, safety officer, surveyor and so on.
② Review Requirements:
1, all qualification documents must be the construction unit's own qualifications; 2, all qualification copies must be clear, and stamped with the project seal, write the original repository; 3, all qualifications must be in force; 4, the reported personnel and the construction organization design of the personnel correspondence. 5, the content of the registration form and copies of the same, in line with the logic of the relationship.
Fourth, special personnel qualification report A4 form
①Submitted content:
1, SH / T3543-G107 special equipment operator registration form, SH / T 3543-G108 registration form for special types of operators; 2, special personnel qualification certificates (photocopies); 3, the distinction between special equipment operators and special types of operators SH/T3543-2007 provisions of the explanation shall prevail.
② Review Requirements:
1, all copies of qualifications must be clear, and stamped with the project seal, write the original depository; 2, all qualifications must be valid, to the annual review period to have an annual review records; 3, engaged in special equipment, process piping and other welding operations welders need to review the original qualifications, and entrance examination; 4, special personnel are generally examined by the HSE engineer In addition, the special personnel involved in the need to conduct entrance examinations by the corresponding professional engineers review. 5, the content of the registration form and the copy of the same, in line with the logical relationship.
V. Project materials/components/equipment for review A9
①Submitted content:
1, the list of quantities; 2, SH / T 3543-G114 equipment/materials quality documents list; 3, quality documents, certificates of conformity, test reports, re-inspection reports (if necessary), the original 1 and 3 copies; 4, materials/components/equipment entry self-test records; 5, materials/components/equipment entry self-test records; 6, the original and 3 copies of the original. equipment into the self-test records; 5, equipment unpacking records (equipment into the field);
② review requirements:
1, materials / components / equipment into the field time to match the time of the report; 2, the quality of the documents and the inspection of the physical object to be corresponded to; 3, the quality of proof of the original and the copy of the same, and clear, the copy of the project stamped with a project seal, write the original depository; 4, the number of documents involving the quality of Quality proof documents can cover ...... >>
Question 2: What is the enterprise qualification audit 5 points The enterprise qualification actually refers to the enterprise in a certain field to engage in (or to carry out) a certain type (or item) of commercial activities with the business qualifications, different industries have different qualification requirements, according to the relevant laws and regulations of the state, the enterprise to be operated by the type of business, scale of operation, foreign-related or not, as well as the structure of the rights and interests, etc., need to be through the appropriate According to the relevant state laws and regulations, the proposed business category, business scale, foreign-related or not, and the equity structure, etc., all need to be confirmed and approved by the corresponding review, examination, approval and other line of hungry management departments one by one. Generally speaking, industry and commerce, taxation, environmental protection, fire and other state regulatory agencies are each enterprise must pass the examination department, involving different industries, there are different specialized departments for examination, such as construction, catering, entertainment, manufacturing, education, consulting and other major categories, there are more detailed classification management. Only after passing the examination of all relevant departments, obtaining the production and operation license and safety production license issued by the competent authorities; special operation obtaining the special production qualification certificate issued by the corresponding competent authorities, as well as the corresponding supporting qualification certificates, such as fire safety and environmental protection certificates, can they officially open for business. In addition, a variety of certificates have different review cycle, must be in accordance with the relevant requirements in advance to apply for review, to ensure that a variety of production containing supporting qualification certificates are always within the validity period, otherwise the relevant departments have the right to issue a suspension of business in accordance with the relevant regulations, including the audit of the top failed to complete the rectification of the situation in a timely manner, but also the corresponding financial penalties. The problem is too big to be outlined in general terms, and I hope you will find it helpful.
Question 3: What does the qualification of the construction unit include? (Hefei Mingjing Zhiyuan) remind the construction qualification agency needs to be into the following:
1, business license, enterprise qualification level certificate.
2, safety production license documents.
3, similar project performance.
4, full-time managers and special operators qualifications.
The conditions are as follows:
(a) have the assets to meet the requirements of this standard;
(b) have to meet the requirements of this standard for registered builders and other registered personnel, engineers and technicians, construction site management personnel and skilled workers;
(c) have to meet the requirements of this standard for the project performance;
(d) have the necessary Technical equipment.
Question 4: What is generally included in the content of the qualification examination on the qualification requirements of the bidding enterprise:
The qualification requirements in the tender according to the nature of the tender and the category of different requirements, there will be different requirements, the general qualification requirements include:
1, enterprise business license (with annual inspection) and tax registration certificate and organization code certificate
2, enterprise Registered capital (in accordance with the requirements of the bidding project)
3, if the goods bidding: the requirements of the relevant industrial product production license, safety production license, quality management system certification, occupational health and safety management system certification, environmental management system certification, etc.;
If the construction bidding: the enterprise is required to have the relevant construction contracting qualifications (such as general contracting for construction, professional contracting, labor contracting, etc., professional contracting qualification according to the industry there are different categories and levels).
4, financial status;
5, similar project performance (successful cases);
6, corporate reputation (litigation and arbitration in recent years);
7, if the project bidding, but also requires the qualifications of the project manager and technical personnel, as well as the ability to invest in equipment
8, other requirements (such as consortiums) < /p>
Qualification examination main steps:
1, determine the qualification examination method, that is, qualified system or limited number system. Generally, the qualified system is adopted, and when there are too many potential bidders, the limited number system can be adopted.
2, the development of review criteria (including preliminary and detailed review criteria);
3, into the specific review procedures: the qualification committee shall carry out a preliminary review, detailed review and clarification, and determine the qualified bidding applicants through the scoring order.
4, arrive at the results of the review (qualification committee review to determine the list of applicants through the pre-qualification, submit a review report to the bidder, the bidder to validate the qualified bidders)
Qualification review of the general procedures:
1, the formation of qualification committee;
2, the preliminary examination:
Preliminary examination of the factors are mainly: Bid qualification applicant's name, application letter signature and seal, application document format, consortium applicants and other elements.
3, detailed review:
The following elements, selected in accordance with the tender categories and requirements, respectively:
1) business license; (tax registration certificate, organization code certificate, etc.)
2) enterprise qualification level and safety production license (engineering);
3) enterprise production license (goods) or safety production license or "3C" certification (goods);
4) quality management system and occupational health and safety management system certification (non-mandatory);
5) environmental management system certification (non-mandatory);
6) financial status; financial indicators and creditworthiness
7) performance of similar projects Experience;
8) Reputation; performance reputation record
9) Qualification of project manager and technical person in charge (engineering construction);
10) Qualification and agreement of the applicant of the consortium (possible);
11) Other.
4. Clarification
The Qualification Committee requests clarification from the applicant and does not accept clarifications or explanations on the applicant's own initiative;
Clarifications are in written form and are limited in scope to what is not clear in the application documents; the applicant's clarifications or explanations are limited to details and completeness, and shall not change the substance of the application documents;
According to the "Standard Documents , requests for clarification may be made in multiple rounds.
5. Evaluation
1) Qualification system. Evaluation in accordance with the criteria of the pre-qualification documents.
2) Limited quantity system. In accordance with the pre-qualification documents of the standards, methods and number of evaluation and ranking.
6. Review Report
After the Qualification Review Committee completes the evaluation, the qualified applicant through the pre-qualification, the qualification evaluation report to the bidder.
7, to determine the pre-qualification applicants
The bidder to review the qualification assessment report, to determine the pre-qualification applicants
Question 5: What is the content of the construction qualification review, the "construction organization design" of the preparation and review of the basic procedures 1. construction organization of the general design should be approved by the general contracting unit of the technical responsible person. Unit project construction organization design should be approved by the construction contractor's technical director or technical director authorized by the technical staff. Key, difficult, branch (sub) project and special construction program should be constructed by the construction unit technical department
Question 6: how to qualify for the review of construction drawings for what information is needed ]@]@]
@ The review body according to the scope of the undertaking business is divided into two categories, one type of organization to undertake construction of housing construction, municipal infrastructure projects construction plan review business scope is not restricted; two types of institutions can undertake The second level and the following housing construction, municipal infrastructure projects construction plan review.
A review organization should have the following conditions:
(a) registered capital of not less than 1 million yuan.
(B) has a sound technical management and quality assurance system.
(C) the reviewer should have good professional ethics, with more than 15 years of professional survey, design experience; presided over no less than five items of construction projects or large municipal public works or Class A engineering survey projects of the corresponding professional survey and design; has been the implementation of the practice of the registration system of professions, the reviewer should have a first-class registered architects, first-class registered structural engineers Or survey and design registered engineer qualification, not practicing registration system, the reviewer should have a senior engineer or above.
(d) engaged in the review of construction drawings of building construction projects, structural professional reviewers not less than six people, building, electrical, HVAC, water supply and drainage, survey and other professional reviewers of not less than two people; engaged in the review of construction drawings of municipal infrastructure projects, the required professional reviewers of not less than six people, the other must be supported by the professional reviewers of not less than two people; specializing in the review of the survey documents, the survey professional reviewers of not less than two people; specializing in the review of the survey documents The specialized survey document review, survey professional reviewers not less than 6 people.
(E) reviewers in principle shall not exceed 65 years of age, 60 years of age or more reviewers not more than 1/2 of the number of professional reviewers.
Undertake the review of construction drawings of ultra-high-rise building projects, in addition to the above conditions, it should also have a presided over the ultra-high-rise building projects or more than 100 meters above the structural design of the building project reviewers not less than three people.
The second type of review organization should have the following conditions:
(a) registered capital of not less than 500,000 yuan;
(b) have a sound technical management and quality assurance system.
(C) reviewers should have good professional ethics, with more than 10 years of professional survey, design experience; presided over no fewer than five items above the second level of construction or medium-sized municipal utility projects or engineering survey projects above the B level of the corresponding professional survey and design; has been the implementation of the practice of the registration system of specialties, the reviewers should have a first level of registered architects, registered structural engineers or registered survey and design engineers. Structural Engineer or Registered Engineer in Survey and Design qualification, without the implementation of the practice of registration system, the reviewer shall have the title of engineer or above. (D) engaged in the review of construction drawings of building construction projects, each professional reviewers not less than 2 people; engaged in the review of construction drawings of municipal infrastructure projects, the required professional reviewers not less than 4 people, other professional reviewers who must be supported by not less than 2 people; specializing in the review of the survey documents, survey professional reviewers not less than 4 people.
(E) reviewers in principle shall not exceed 65 years of age, 60 years of age or older reviewers not more than 1/2 of the number of professional reviewers required.
Question 7: May I ask the review of construction drawings need to prepare those materials? 1, approved project documents or preliminary design approval documents; planning general assessment; the main preliminary design documents (construction drawings preparation basis); geological survey report (detailed survey) 4 sets; structural calculations and other necessary calculations; 4 sets of complete construction drawings, (the main drawings are required to be stamped with construction drawings, the person in charge of the chapter, the main architectural, structural drawings stamped with the appropriate qualifications of registered architects, registered structural engineer chapter) ; planning red line map, site coverage map; preliminary design (expansion) approval letter; the relevant authorities review comments and preliminary design approvals, including planning, fire, health, transportation, environmental protection, greening, human defense, sanitation, seismic, etc.; building engineering program or expansion of the preliminary stage of fire audit approval documents.
Question 8: What materials do you need to do to qualify The materials needed to qualify?
(Beijing, for example, the rest of the country is basically the same, you can refer to)
Enterprises applying for qualification, often faced with a lot of preparation materials are y complex, can not make sense of the qualification materials in the end what are they? Construction enterprises for the first time to apply for qualification materials:
1. "Construction enterprise qualification application form" in duplicate;
Login to the Beijing Municipal Construction Commission website (bjjs.gov) - Office Hall - fill in the reported data, and then print the "construction enterprise qualification application form"
Qualifications approved by the Ministry of Housing and Construction: Log on to the website of the Ministry of Housing and Construction (mohurd.gov) to download and install the "Enterprise Qualification Application Acceptance Information Filling Software", and then fill in the "Application Acceptance Information Gathering Form for the Qualification of Construction Engineering Enterprises".
Note: The content of the qualification application form should be filled in with the submission of the relevant content of the attached materials reflected in the same, acceptance of the notice and the process of single signature, seal complete.
2. A copy of the enterprise organization code certificate; Remarks: The copy of the declared information is consistent with the original, and stamped with the applicant's official seal.
3. Qualifications approved by the Ministry of Housing and Construction, provide a copy of the "business license" copy (no need to check the original); Remarks: with an independent legal personality, with the business license of the enterprise in the limited period.
4. A copy of the Articles of Association; State (Beijing) Bureau of Industry and Commerce, and stamped with a special seal for archival inquiries; Remarks: The Articles of Association and amendments to the Articles of Association are complete.
5. A copy of the title certificate of the office space or a copy of the title certificate of the leasing (borrowing) party and the two sides of the lease contract or borrowing agreement; Remarks: belonging to the own property rights to issue a copy of the title certificate; belonging to the rental or borrowing, issued by the leasing (borrowing) party's title certificate and the two sides of the lease contract or borrowing agreement
60. Construction qualification standards require the purchase of the main equipment invoices A copy of the invoice; invoice date, equipment content, sales unit, invoice stamp and other content should be clearly visible; the same equipment sales unit issued invoices, the invoice date and invoice code number should be consistent with the actual situation; leasing equipment will not be recognized; standards are not explicitly required in the equipment, may not provide invoices.
7. Registration management department approved by the initial registration of registered construction or change of registration materials (new enterprises without qualifications) Remarks: the first application for qualification enterprises need to be registered by the county housing and construction commission to submit the initial (change) registration of the second level constructor related information; non-first-time applicants for qualification of the enterprise's registered construction unit name and the name of the declared enterprise unit.
8. Intermediate and above title personnel identification, title certificate (proof of education) copies. Note: The number of site management personnel filled in the application form for enterprise qualifications should meet the standard requirements, the standard has a clear professional requirements of the personnel, their job certificates, the assessment of their number and specialty should meet the requirements; the age of the enterprise site management personnel should not be more than 60 years of age, the time node to accept the acceptance of the department acceptance of the time shall prevail.
9. Site management personnel identification, post certificate copies; Remarks: construction enterprise qualification application form to fill in the number of site management personnel should be in line with the requirements of the standard, the new standard of construction qualification has a clear professional requirements of the personnel, their post certificates, assessment of the number of its professional should meet the requirements; enterprise site management personnel should not be more than 60 years of age, the node in order to accept the department of acceptance time shall prevail. Acceptance time shall prevail.
10. Technical person in charge of identification, practicing qualifications (title certificate or skills certificate) copies; Remarks: the technical person in charge of the ID card, title certificate, pension insurance, there is a requirement for registered practice certificate should be complete and valid; its relevant experience, title should meet the requirements of the standard; the technical person in charge of the age should not be more than 60 years old; the standard of the technical person in charge of the professional requirements. Professional according to the title certificate of the job specialty or graduation certificate of the specialty studied in the assessment.
11. Technical worker's identity, vocational training certificate or a copy of the certificate of vocational skills; Remarks: If there is a requirement for the type of personnel, the number of certificates of the corresponding type of work and profession should meet the requirements; the age of the enterprise's technical workers should not be more than 60 years of age, the node of time to the acceptance of the acceptance of the department time shall prevail.
12. The main personnel of the enterprise to declare the previous 1 month of social insurance certificate (issued by the housing ...... >>
Question 9: What are the contents of the construction unit qualification review 1, business license
2, corporate code certificate
3, qualification certificates
Question 10: Who is the qualification review party? What are the contents? The association you belong to or an independent third party is responsible for the qualification review. These reviewers are called validators (see question 12 above). Given the private nature of the data you submit, .travel uses a secure server to receive this data. The verifying parties review the qualification information to determine whether it corresponds to the information they hold about the registered member. In addition, if you enter a name other than your legal name, you will be required to submit supporting documentation to the verifier. The reviewer will rely on these documents to check that the name you entered on the validation form is consistent with it.
An independent third-party validator is responsible for reviewing all registrants who are not members of the Tourism Society or who do not wish to be reviewed by their respective societies.