Chengdu Locomotive & Rolling Stock Factory of China CSR Group is the main maintenance base of diesel locomotives and electric locomotives in China, and the only motor manufacturing base of China CSR Group. Facing the national railway bureaus (group companies), local railway companies, locomotive factories and other large industrial and mining enterprises, it is mainly engaged in the repair and installation of various diesel locomotives, electric locomotives, railway buses and urban rail transit vehicles. Manufacturing of various traction motors, units and linear motors for maglev trains; Repair of railway postal service, traveling crane, hard sleeper bus and air-conditioned bus. Manufacture, repair and installation of large parts, fittings and test stations of various locomotives and rolling stock; Design and manufacture of track shoes and construction machinery; Design, manufacture and installation of environmental protection equipment such as dust, atmosphere and sewage treatment; Warehousing and freight forwarding.
The factory covers an area of 788,000 square meters and employs more than 5,000 people, including 787 professional technicians and managers, with assets of 629 million yuan, including 480 million yuan in fixed assets (original value). With 1700 sets of sophisticated production equipment and more than 550 middle and senior professional and technical personnel, it has strong production means and technological innovation ability.
At present, the factory has more than 50 design and R&D teams composed of technicians with senior, middle and junior technical titles. The ladder diagram is reasonable in structure, and most designers and R&D personnel can use computers to complete drawing design and document preparation. The factory has a CAD workstation, equipped with domestic advanced computers and software programs for design, calculation and analysis. This factory can design and manufacture various motors for diesel locomotives, electric locomotives and urban rail transit vehicles, among which SS7 series fully laminated pulse traction motors for electric locomotives represent the domestic advanced level.
Treatment:
Installation fee: 2000 yuan for graduate students and 2000 yuan for undergraduate students 1500 yuan.
Probation period: 2000 yuan for graduate students and 2000 yuan for undergraduate students 1200 yuan/month.
Accommodation conditions: 2 persons/room
To be honest, it's not so good. Many people who are laid off from bankruptcy are slightly better. . . Basically, people in their 40 s are laid off, their wages are in arrears, and the living environment of more than N locomotive factories at home is ok. .