Engineering insurance premium charges

New version of engineering survey and design fee standard

In order to implement the "General Office of the State Council forwarded the Ministry of Construction and other departments on the reform of the system of engineering survey and design units of a number of opinions of the notice", to adjust the standard of engineering survey and design fees, standardize the behavior of the engineering survey and design fees, the State Planning and Development Commission and the Ministry of Construction formulated the "Engineering Survey and Design Fee Standard," and issued on January 7, 2002, since March 1, 2002, shall come into force. On January 7, 2002, the State Planning and Development Commission and the Ministry of Construction formulated the "Engineering Survey and Design Charges", which was issued on January 7, 2002 and came into effect on March 1, 2002. In order to reasonably implement the new charges, China Survey and Design Association organized a teacher training seminar on "Regulations on Management of Engineering Survey and Design Charges" on June 11-12, 2002 in Beijing. Through training and study, we have improved our understanding of the engineering survey and design charges, now on the content of a little understanding.

11992 version of the "engineering survey and design charges" the main problems

(1) 1992 version of the "engineering survey and design charges" adopted by the government pricing method can neither reflect the market supply and demand, nor can reflect the quality of good price. Survey and design market is mainly manifested as a buyer's market, supply is seriously greater than demand, survey and design team has a large number of personnel, but the technical level is uneven. In order to support strong technical force, high management level of survey and design units, promote the survival of the fittest, with the socialist market economy, must rectify the survey and design market order, adjust the fee standard.

(2) charges are low. With the rise in wages, costs and new housing, insurance costs, the 1992 version of the fee has been obviously low, taking into account the survey and design enterprise costs, profits, taxes and social affordability, appropriate increase in fees, can take into account the interests of both buyers and sellers, and get a better market acceptance.

(3) the fee standard itself there are duplication, double track and other contradictions, fee rules are not sound. Domestic regions, geographical market unification and international and domestic market unification of the development trend, the requirement of fee standards must be unified. From the domestic situation, with the development of the socialist market economy, regional economic development imbalance improvement, the past man-made price system has been basically replaced by the market price system; from the international situation, with China's accession to the WTO, the domestic market and the international market tends to unify, and thus the fee standard must be unified.

(4) poor transparency of fees and charges, non-specialists to interpret the difficulties.

2 the main difference between the old and new "engineering survey and design charges"

(1) the new standard from the "government pricing" to "government guide price" as the main, "market price adjustment "supplemented by", reformed the pricing mechanism, increasing the strength of market regulation. Mainly reflected in: construction projects with total investment estimates of less than 5 million yuan of engineering survey and engineering design fees to implement market-adjusted prices; construction projects with total investment estimates of more than 5 million yuan of engineering survey and engineering design fees to implement the government-guided price, can be up and down by 40%.

(2) Increased fees. Compared with the 1992 version of the new standards, the design charges have been increased by an average of 56%, and the survey charges have been increased by an average of 120%.

(3) the unified charging method, the abolition of "physical quota" and "percentage of the proposed budget" dual-track charging method.

(4) Eliminating the "sectoral classification" and implementing the "classification of the nature of the project", consolidating and simplifying the fee schedule, improving the price rules, and formulating the fee management regulations.

3 The use of the new version of the "Engineering Survey and Design Charges"

3.1 The scope of application of the new version of the "Engineering Survey and Design Charges"

The new version of the "Engineering Survey and Design Charges" applies to the Chinese People's Republic of China*** and the construction projects within the territory of the engineering survey and engineering design charges. All construction projects built in the territory of the Chinese People's Republic of China, whether domestic or foreign investment, and whether domestic or foreign survey and design units, in principle, should implement this fee standard. But there are two exceptions: one is through international bidding, voluntarily invite foreign units survey and design; the other is the use of international standards and norms, in accordance with foreign design procedures and depth of design requirements.

3.2 Pricing method of the new version of "Engineering Survey and Design Charges"

According to the "Price Law of the People's Republic of China*** and the State", there are three types of pricing methods of China's charging standards: market-adjusted price, government-guided price, and government-priced price. Market-adjusted price is set independently by the operator, the price formed through market competition. Government-guided price is in accordance with the provisions of the Price Law, by the government price authorities or other relevant departments in accordance with the authority and scope of pricing, stipulating the benchmark price and its fluctuation range, to guide operators to set the price. Government pricing is in accordance with the provisions of the Price Law, by the government price authorities or other relevant departments in accordance with the pricing authority and scope of the price.

The pricing of the new version of "Engineering Survey and Design Charges" is based on the government's guiding price, supplemented by market-adjusted price. Construction projects with a total estimated investment of more than 5 million yuan are subject to government-guided pricing. Operators in accordance with the government's "benchmark price" in the provisions of the "fluctuation range" within the negotiation to determine the specific charges. The benchmark price of the new version of the fee standard is the "engineering survey fee" and "engineering design fee"; as for the floating range, the general project for ± 20%, where the use of new technologies, new techniques, new equipment, new materials, is conducive to improving the economic, environmental and social benefits of construction projects can be negotiated to determine the amount of the fee within the range of up to 25%. The total estimated investment amount of 5 million yuan or less of construction projects to implement the market price adjustment, that is, "buyers and sellers to negotiate pricing.

According to the pricing principle, as long as there is an oversupply of products or services should be market-adjusted prices. In fact, the survey and design fees mainly government guide price, only a very few projects to liberalize. This is because the survey and design is a kind of intellectual service, its service technology level and service quality is difficult to measure. The implementation of the government guide price can guarantee the level and quality of investigation and design, close to the market, to protect the rights and interests of the contractor and the investigation and design, but also in line with international practice. At the same time, taking into account the current situation of China's survey and design market and charges, the regional differences are too large, the project differences are also very large, so the liberalization of the total estimated investment in construction projects less than 5 million yuan of small projects, while more than 5 million yuan of the project, its market-adjusted fluctuation rate is as high as 40%.

3.3 Calculation of design charges for a construction project design project as an example

A certain construction project has a total estimated budget of 17,000,000 yuan, of which the sum of the construction and installation costs, the purchase cost of equipment and utensils, and the joint commissioning costs is 96,000,000 yuan, and the steps for calculating the design charges are as follows:

(1) The first step: calculating the " basic design charges".

Basic design fee refers to the preliminary design documents and construction drawing design documents prepared in the engineering design of the fees charged, and provide the corresponding design technology, solve the construction of the design technical problems, participate in the test run assessment and acceptance of the completion of services. Calculation formula is:

J=Y×t1×t2×t3

Where: J - basic design fees;

Y - engineering design fee base price;

t1 - professional adjustment factor;

t2 - complexity of the project adjustment factor;

t3 - additional adjustment factor.

The professional adjustment coefficient of the construction project t1=1.0, the complexity of the project is complex (level III), the complexity of the project adjustment coefficient t2=1.15, the additional adjustment coefficient t3=1.0.

Where:

Formula: Y - the base price of the engineering design fee;

Y2 - the upper limit of the interval where Y is located;

Y1 - the lower limit of the interval where Y is located;

X - engineering design fee billing amount;

X2 - the upper limit of the interval where X is located;

X1 - the upper limit of the interval where X is located.

Engineering design fee billing amount for the approved preliminary design of construction projects in the construction and installation costs, equipment and appliances purchase costs and joint commissioning costs and the sum.

The base price of the engineering design fee is the price for the completion of the basic services, which can be determined by looking up in the Table of Engineering Design Fee Base Price. Billing amount in the two value interval, the use of linear interpolation method to determine the engineering design fee base price.

Substituting specific values yields:

Y=(304.8-249.6)/(10,000-8,000)×(9,600-8,000)+249.6=293.76 (million)

J=293.76 ×1.0×1.15×1.0=337.824 (million)

(2) Step 2: Calculate the "other design charges".

Other design charges refers to the fees charged for the provision of related services according to the actual needs of engineering design or at the request of the contractor, including the overall design fee, the main design coordination fee, the use of standard design and reuse design fees, non-standard equipment design document preparation

production fees, construction budgeting fees, as-built drawing preparation fees, and so on.

The construction project has a main design unit and prepares the construction drawing budget. According to this fee schedule, the main design coordination fee is 5% of the basic design fee, and the construction drawing budgeting fee is 10% of the basic design fee, i.e.: main design coordination fee = 337.824 × 5% = 168,912 (million); construction drawing budgeting fee = 337.824 × 10% = 337,824 (million).

Then: other design charges Q = 16.8912 + 33.7824 = 50.6736 (million).

(3) the third step: calculate the "engineering design fee base price".

Engineering design fee benchmark price is calculated in accordance with this fee standard engineering design benchmark fee amount, the contractor and the designer according to the actual situation, within the specified floating range of negotiation to determine the contract amount of engineering design fee. Calculation formula is:

Z=J+Q

Where: Z - engineering design fee base price;

J - basic design fees;

Q - other design fees.

Substitute the specific value: Z = 337.824 + 50.6736 = 388.4976 (million)

(4) the fourth step: the negotiation to determine the construction project "engineering design fees".

Engineering design fee refers to the designer according to the contractor's commission, to provide the preparation of the construction project preliminary design documents, construction drawings design documents, non-standard equipment design documents, construction budget documents, as-built documents and other services charged. Calculation formula is:

S=Z×(1±float value)

Where: S──engineering design fee;

Z──engineering design fee base price.

Substitute the specific value: S = 388.4976 × [1 ± (-20% ~ +25%)] (million)

3.4 Problems needing attention

The new version of the engineering survey and design charges after the implementation of the standard, if the contractor or survey and design do not comply with the unified charges and fees, beyond the Government guide price stipulated ± 20% fluctuation range pricing, whether it is raised or lowered, the price authorities will be investigated and dealt with according to law after verification.

Civil construction engineering design fee standard [1992] price fee word 375

State Price Bureau of the Ministry of Construction documents

General description of engineering design fee standards

I. Engineering design fee is the engineering design unit and commissioned the task of the unit to sign a contract to fulfill the contract to collect the design fee basis.

Second, the charges by the state council department in charge of survey and design organization of the state council departments concerned to prepare, by the state price bureau in conjunction with the state council department in charge of survey and design approval issued. Engineering design unit to undertake the task of the nature of the project, respectively, the implementation of this standard in the relevant industry charges. Each construction unit, work design unit, design review department and construction bank and other units should be mastered accordingly and supervise the implementation.

Three, this fee standard *** divided into three volumes. The first volume includes: petroleum, iron and steel, gold, non-ferrous metallurgy, building materials, machinery, chemical and petrochemical, medicine, textiles, light industry, transportation, radio and television, commerce, food, forestry, civil construction, municipal, water conservancy and hydropower, human defense, railway and other twenty-one industries; the second volume includes: nuclear industry, aviation, electronics, weapons, ships, space and other six industries (84 years of the book); the third volume is the "engineering survey, Engineering Design Fee Work Day Quota" trial version, including coal, electric power, post and telecommunications three industries.

Four, this fee is in the former State Planning Commission in 84 years, 85 years issued on the basis of the fee standard, the fixed charges in the unreasonable part of the revised version of the adjustment, still reflects the principle of low fees. That is to say, this fee is based on the comprehensive design capacity of the engineering design units of various industries and based on the expenditure level of the utility fee system for calculation, while taking into account the necessary technology development, business construction, personnel training and other costs required, as well as the industrial and commercial taxes that must be paid.

Fifth, the tariffs to the physical fixed charges, supplemented by a single project estimates for the calculation of the basis of the charges, in addition to coal, electricity, post and telecommunications three industries on a trial basis for the fixed charges for the work day.

Six, the main content of the tariff:

1. engineering design fees: generally include preliminary design and budget estimates, construction drawings, according to the contract with the construction, design and technical submission, participate in the commissioning and acceptance of the completion of the project, and other work costs. This fee does not include the cost of doing construction budget.

2. Preliminary design before the work of fees: is the preparation of feasibility study reports, on behalf of the design task book, to participate in site selection and planning, environmental pre-evaluation and other work required fees.

3. Non-standard equipment design fees: refers to the design of non-stereotyped equipment. Some industry engineering design itself includes equipment design, not another non-standard equipment design fees. Because of the different characteristics of the industry, the scope of non-standard equipment design, by the industry to make separate provisions.

4. Software preparation costs: refers to the factory production process computer control programs and other preparation costs. Industry has a software preparation fees, the implementation of industry standards; industry standards do not exist, according to the value of the software, the degree of sophistication, and take into account the preparation of the actual workload of the software agreed by the two sides.

In addition to the above work other than work, such as separate technical information, drawings, translations, electrical calculations, etc., and its charges by the competent department or engineering design unit to develop a separate standard.

Seven, if only commissioned to do process design or civil and utility engineering design, according to the industry division of the design workload of each proportion of the calculation of fees.

When only preliminary design or construction drawings are commissioned, the charges are calculated according to the proportion of design workload by industry and multiplied by a coefficient of 1.1. If you add the preparation of the construction drawing budget, the fee is calculated by multiplying the engineering design fee by a factor of 1.1.

The engineering design charges in this tariff are considered according to the design of the new project, if the expansion project, in addition to the industry has clearly defined, can be calculated by multiplying the charges of similar new projects by a factor of 1.1; technological transformation projects, according to the complexity of the design technology, can be multiplied by a factor of 1.2-1.4 to calculate the charges.

Projects that require seismic defenses can be multiplied by a coefficient not exceeding 1.2 according to the increase in design workload when calculating the flat-rate.

Eight, engineering design units to provide design documents, must comply with the depth and quality standards set by the state and the competent authorities to provide the number of copies in accordance with the provisions of the implementation of the industry, the commissioning unit to request an increase in the number of copies, another charge for printing labor costs.

Nine, engineering design using standard design (except for standard components map), reuse design, according to the same type of new design projects, 20% of the charges. Need to match the foundation or local conditions to make local modifications, according to the same type of new design projects, 30% of the charges. Non-standard equipment design reuse, since the completion of the design of the year after the beginning of the annual reduction of 20% charge, after the reduction of the charge is less than the cost of drawings, can be charged according to the standard drawings and information charges.

Ten, engineering and technical consulting services, to participate in planning surveys, inquiries, quotations, external negotiations and other technical services, as well as the work of not formulating a specific fee, can be used to calculate the fee according to the direct production of manpower staff days, the fee is 85 yuan per workday. Calculation of man-days can be carried out on the basis of man-days quota or negotiated between the designer and the commissioner at the time of signing the contract according to the task. Need to travel to the outskirts of the task, the duration of sixty days or less, the travel costs borne by the commissioning unit.

Eleven, according to undertake the design task of a single project estimates for the basis of fees, the calculation of the base should be deducted from the cost of temporary works, construction technology and equipment costs and construction machinery purchase costs, to join the joint commissioning costs. The estimate for a single project shall be based on the preliminary design estimate approved by the competent authority.

Twelve, with the introduction of equipment for the project, according to the estimated cost of a single project as the basis for fees, engineering design is borne entirely by us, the design fee, the price of the equipment should be calculated according to the price of similar equipment. If there is no reference price in China, the original price of the equipment shall be calculated by converting it into RMB according to the national license price.

There is the introduction of equipment, according to the estimated cost of a single project based on the project, if the process design undertaken by foreign countries, the calculation base should not include the price of technology and equipment; in-kind quota fee, should be divided into the design workload according to the industry as a proportion of the design, deduct the corresponding design fee. Domestic corresponding process design with the work of the charges, can be designed and commissioned by the actual workload negotiation to determine.

Thirteen, such as the need for international design procedures and depth of the design of domestic projects, because of more than the current domestic design depth, may be appropriate to increase the design fees, specifically according to the actual increase in workload, determined by the designer and the commissioning party negotiations.

Fourteenth, when undertaking design tasks in remote areas such as Xinjiang, if the charge is calculated according to the fixed amount, the original fixed amount can be multiplied by a factor of 1.1, and the task of undertaking tasks in Tibet can be multiplied by a factor of 1.2 according to the original fixed amount.

Fifteen, engineering design units due to the needs of the task undertaken by the need to go abroad, in addition to the cost of production and installation by the design unit to pay, other costs abroad (including foreign exchange amount) should be paid by the commissioning unit, such as the design unit itself in order to improve the level of reasons such as studying abroad, study, the cost of its overseas by the design unit to take care of their own.

After the engineering design unit undertakes the task, if scientific tests are required for the project, the equipment, materials and labor costs shall be the responsibility of the commissioning unit.

Sixteen, this fee takes into account a variety of factors affecting the design workload adjustment factor, if more than two factors in the same project at the same time, by the total adjustment factor for the project shall be the sum of the individual adjustment factor after the decimal point of the number of figures and then add 1, but the total adjustment factor shall not be greater than the maximum value of 1.5.

By the physical or working day quota for the design of the fee, where the projects with an investment of more than 300 million yuan, the maximum fee shall not be greater than 1.5% of the proportion of the proposed budget.

Seventeen, engineering design units in the design of advanced technology, and have better economic benefits, confirmed by the design review, can be higher competent review department decided to increase the design fee appropriately, generally controlled within 10% of the design fee. If the design quality and technical level fail to meet the contract requirements, the design fee shall be deducted according to the contract.

Eighteen, the design fee according to the design progress in installments. After the design contract comes into effect, the commissioning party shall pay twenty percent of the design fee to the design unit in advance as a deposit; thirty percent after the completion of the preliminary design; fifty percent after the completion of the construction drawings. According to the "construction engineering survey and design contract regulations", design contract fulfillment, deposit against the design fee. After the design fee is paid, the design unit of the design task of the construction project should be coordinated with the construction, to participate in the test test and acceptance of the completion of the project, etc., should not be charged for technical services and travel expenses.

Nineteen, this fee applies to the design unit above the municipal design unit to undertake domestic investment in construction projects design fees, counties and counties below the design unit, to undertake the design task, according to this fee multiplied by the coefficient of 0.85-0.9 billing. Special economic zone engineering design charges (except for national key construction projects and investment projects within the state budget), may be market-adjusted, by the design unit and the commissioning unit to determine the negotiation.

Foreign investment and Sino-foreign joint venture construction project design charges, may refer to the relevant foreign design charges, by the designer and the commissioning party **** with the negotiation to determine.

Twentieth, the charges are not included in the project, the design charges by the design unit and the commissioning unit with reference to the negotiation to determine the charges.

Contents of survey and design work

Survey:

Quick-growing and productive timber forest base: small class zoning mapping, land type and professional survey, socio-economic survey, roads and other ancillary works survey.

Nursery seed garden: site selection, transfer (survey) mapping, professional survey, determination of the location of structures.

Fly-seeding afforestation: sowing area treadmill, land type and professional survey, sowing area route and navigation point location survey.

Design:

Fast-growing and productive timber forest base: management area planning, determination of afforestation type, tree species planning and design, afforestation technology design, planning and design of auxiliary works such as road fire line, preparation of design manual and planning map, and design estimate.

Nursery Seed Garden: general layout design, technical design, road drainage and irrigation works and auxiliary works design, manuals and budget estimates.

Flying sowing afforestation: sowing area afforestation tree species, sowing amount calculation, design, route, navigation point design instructions and budget estimates.

Civil building design fee schedule

I. This fee schedule includes the design fee fixing and rate charging standard for various types of civil building projects.

Second, civil construction according to its complexity *** divided into six levels, the main features of each level and the scope of application are as follows:

The main features of the engineering level engineering scope of the project examples

Specialized as a national key projects or international activities based on the special high-level large-scale public **** building.

Small and medium-sized public **** buildings of national historical significance or with particularly complex technical requirements.

Buildings of 30 floors or more.

Buildings with sound, light and other special requirements for tall spaces.

State Guesthouse, State Assembly Hall, International Convention Center, International Sports Center, International Trade Center, International Large Airports, International Comprehensive Clubs, Important Historical Memorial Buildings, National Libraries, Museums and Art Galleries, Theaters, Concert Halls, and Human Defense of Level 3 or above.

1 high-level large-scale public **** building.

Medium and small public **** buildings with regional historical significance or complex technical requirements.

Public **** buildings with more than 16 floors and less than 29 floors or more than 50 meters high.

Superior hotels, tourist hotels, senior guest houses, villas, provincial exhibition halls, museums, libraries, scientific experiments and research buildings (including institutions of higher learning), senior halls, senior clubs, ≥ 300 beds hospitals, sanatoriums, medical and technical buildings, large outpatient clinic buildings, large and medium-sized gymnasiums, indoor swimming pools, indoor ice skating rinks, railway stations in large cities, shipping station, terminal buildings, photo studios, Post and telecommunications building, comprehensive commercial buildings, high-grade restaurants, four levels of human defense, five levels of leveling and combining human defense.

2 middle and senior, large and medium-sized public **** building.

Small and medium-sized buildings with high technical requirements.

Residential buildings with more than 16 floors and less than 29 floors.

Teaching buildings of universities and colleges, archive buildings, auditoriums, movie theaters, office buildings of ministries and provincial-level organs, hospitals with less than 300 beds (excluding 300 beds), sanatoriums, prefectural and municipal libraries, cultural centers, children's palaces, clubs, rehearsal halls, lecture halls, wind and rain playgrounds, bus terminals of large and medium-sized cities, railway stations of medium-sized cities, post and telegraph bureaus, multistory comprehensive shopping malls, restaurants with flavors and high-level small Residence and so on.

3 Intermediate, intermediate public **** building.

Buildings of more than 7 floors (including 7 floors) and less than 15 floors with elevator residences or frame structures.

Key secondary schools, secondary specialized schools, teaching, experimental buildings, tele-education buildings, social hotels, restaurants, guesthouses, baths, post and telegraph offices, door clinics, department store buildings, nurseries, kindergartens, comprehensive service buildings, one- and two-story shopping malls, multi-storey canteens, small stations, and so on.

4 general small and medium-sized public **** building.

Residential houses, dormitories and brick buildings without elevators below 7 floors.

General office buildings, primary and secondary school buildings, single-story canteens, single-story car garages, fire garages, fire stations, vegetable stores, grain stations, grocery stores, reading rooms, barber's offices, flush public **** toilets and so on.

5 one or two-story single-function, generally small-span structure building. The same characteristics

3, need to put forward a separate architectural design program, special, first-class engineering architectural design program plus 10% of the project design fee; second-class engineering architectural design program plus 6% of the design fee of the project; third-class engineering architectural design program plus 3% of the project design fee; four level (including four) projects do not charge a separate fee for the architectural design program.

Fourth, the charges have included the corresponding general fire system and building decoration design charges, if any special requirements to be negotiated. Specialized decorative design of existing buildings, according to the complexity of the decorative design, according to the decorative cost of 3-5% of the charges.

Fifth, the charges are based on a single project as the basic unit, excluding gas, water, purification, sewage treatment, roads and bridges, boiler houses, gas stations, power substations, pump houses, cooling towers, chimneys and other single buildings and structures, the charges should be in accordance with the standards of municipal and other industries, respectively.

Sixth, undertake the planning and layout of the district, in more than 3 hectares of 700 yuan per hectare charges, 3 hectares of the following charges, but the district's pipeline, greening, earthwork and other design regardless of the size of the proposed budget of 1.5% of the charges.

Seven, undertake multi-functional buildings, according to the main building function of the calculation of fees, which is more complex than the main function of the part of the calculation of the appropriate level.

VIII, civil engineering grade table "large" generally refers to more than 10,000 square meters of buildings; "medium" refers to 3,000 to 10,000 square meters of buildings; "small" Refers to the building of less than three thousand square meters. This classification is limited to the use of this table.

nine, only the preliminary design of civil buildings or construction drawings phased design, the proportion of its workload is 40% and 60%.

X. The number of copies of documents to be provided in accordance with this tariff is 6 copies of preliminary design drawings and 8 copies of construction drawings.

Table I civil building design fee fixed unit: yuan/square meter

Engineering grade ambiguity requirements conditions building area (square meters)

Centralized ambiguous centralized air conditioning 500 below 500~10001001~20002001~30003001~50005001~1000010001~3000030000 above

Centralized ambiguous centralized air conditioning 500~10001001~20002001~30003001~50005001~1000010001~ 3000030000 above

The special no have 25.2023.8022.4021.00

Yes have 26.7425.3423.9422.54

1 no have 18.2016.8015.5414.8414.14

Yes have 19.1817. 7816.3815.6814.98

2NoneNone11.2010.369.529.248.96

NoneNone11.9011.0610.229.949.66

NoneNone13.3012.4611.6211.3411.06

3NoneNone6.306 .166.096.02

Yes No 6.796.586.516.44

Yes Yes Yes 7.847.567.497.42

4 No No 3.923.503.223.153.08

Yes No 4.203.783.503.433.36

5 No No 2.101.681.611.54

Yes No 2.381.961.891.82

Note: 1. Any charge less than 700 yuan is calculated as 700 yuan.

2. Whenever a sub-item is calculated within the area of the previous grade and the charge is less than that of the next grade, the charge shall be calculated according to the highest area and charge of the next grade.

Civil building design fee adjustment coefficient engineering requirements content adjustment coefficient 6 degrees of seismic defense 10 floors below 6 degrees of 10 floors above and 7, 8 degrees of 10 floors below 7, 8 degrees of 10 more than 80 meters above 1.051.101.151.202.9 degrees of seismic defense to be discussed separately. 3. Wet trapping loess, expansive soils, soft soils, quicksand and so on the special treatment of the foundation 1.054.1.054.1.054.1.054.1.054.1. Alpine region (refers to the average temperature of the average temperature of the area) Area (refers to the average temperature below 8 degrees, the coldest average daily temperature below -10 ℃, the annual average daily temperature less than or equal to 5 ℃ for more than 150 days in the region).1.055. Ground floor with stores residential 1.10

Civil building engineering design fee rate charges

Table 2 unit: %

Project level project estimate investment (million yuan)

The following 300 degrees of earthquake-resistance is also discussed.

300 below 301-10001001-30003001 above

Grade 1 2.01.91.81.7

Grade 2 1.81.71.61.5

Grade 3 1.61.51.41.3

Grade 4 1.41.31.2

Grade 5 1.21.1

Note: Extraordinary works are multiplied by a factor of 1.1 on top of the rates for Class I works in the above table.