2022 Employee heat stroke prevention program (collection of 6 articles)

Unconsciously, summer has come to us, the temperature is gradually rising, we should pay attention to prevent heatstroke ah! The following is a "2022 employees to prevent heatstroke program (collection of 6)", only for reference, welcome to read.

2022 staff summer cooling program (a)

Recently sustained high temperatures, the heat is intolerable, the Civil Affairs Office of the multi-pronged approach, seriously do a good job in the summer cooling work of the homes, and the organization of the inspection team daily on the various homes to prevent heat stroke work to carry out spot checks to ensure that the five old people safely through the summer heat.

First, keep the environment in the hospital clean. Requirements for the elderly homes in a timely manner to clean up the yard garbage and weeds, cleaning the elderly dormitory, eliminate flies and rats, eliminate the smell of debris, but also actively keep the elderly living room ventilation and quiet, clean and hygienic, and do a good job of indoor heat preservation and cooling, reasonable closure of the doors and windows, and often ventilated, appropriate to extend the opening time of the elderly activity room, the organization of the elderly suitable for the activities of the cooler and the elderly clothes change diligently wash to prevent skin diseases. The first thing you need to do is to make sure that you have a good understanding of what you are doing.

Second, equipped with cool equipment. In the dormitories, activity rooms and canteens for the elderly equipped with micro-fans, desktop fans, air conditioning and other cooling equipment, and the original electric fans, air conditioning and other facilities to check and repair to ensure normal operation, so that the elderly in a cool environment to spend the summer leisurely.

Third, to ensure health, scientific diet. Timely adjustment of dietary arrangements, specially prepared for the elderly soft and easy to digest, light and nutritious food and drinks, appropriate with fresh vegetables and fruits, lean meat and soy products, and always prepared heat medicines, while guiding the elderly to pay attention to the scientific regularity, regular and quantitative diet, to prevent overfeeding and overstarvation. In addition to the elderly homes are strictly prohibited from buying and using rotten and spoiled ingredients, while increasing the supply of green bean soup and other cooling herbal tea.

Fourth, good protective measures. Prepared to stop the itch water, cool oil, hundred elimination cream and other summer cooling medicines and timely distribution to the elderly hand use, found that the heat stroke patients, take measures to timely access to medical care to prevent the elderly from heat stroke accidents.

Fifth, to strengthen the knowledge of summer heat publicity. For the elderly home issued a heat stroke knowledge manual, requiring the elderly home to the elderly heat stroke knowledge publicity, hand in hand to teach the elderly how to self-help and mutual aid after heat stroke.

2022 Employee heat stroke program (Part II)

Company units:

To reflect the company's humanistic care, to do a good job of heat stroke prevention and cooling work, to protect the company's employees in the summer high-temperature working conditions of health and safety, to ensure that the company's normal conduct of business activities, the company special issue of high-temperature subsidy costs, now the relevant matters are notified as follows:

First, high-temperature The scope of the subsidy:

Some of the positions in the coking plant employees, electric power plant boiler workers, cooks and so on.

Second, high temperature subsidies issued standard: 8 yuan / day / person, 10 yuan / day / person, 12 yuan / day / person (according to the site of the working environment is divided into three grades)

Third, high temperature subsidies issued time: June to August.

Fourth, the form of high-temperature subsidies: in the form of subsidies in June, July and August wages to cash.

V. Other information:

1, the number of days of attendance per month is calculated on the basis of 28 days, when the number of days in the month is less than 28 days of high-temperature subsidies are given in accordance with the actual number of days of attendance;

2, enjoy the high-temperature subsidies for the position no longer enjoy the environmental subsidies.

Notice is hereby given!

xx Coal and Coking Company Limited

June 24, 20xx

2022 Employee Heat Stroke Prevention Program (Part III)

All units:

Recently, the city's weather continues to be hot and hot, in order to ensure the safety and health of employees during the summer period, is now the development of heatstroke prevention programs are as follows:

First, raise awareness and enhance the good work to prevent heatstroke and reduce temperature. The work of the sense of responsibility.

Do a good job of heat stroke prevention and cooling, not only is the "Labor Law", "Work Safety Law" and other national laws and regulations, but also trade union organizations to protect the legitimate rights and interests of employees is an important element of the trade union labor protection work is an important part of the trade union labor protection workers. Trade union organizations at all levels should actively cooperate with the relevant departments and business administration to do a good job of preventing heatstroke, play the role of "group prevention and control", and increase the supervision, inspection and management of hidden dangers, to prevent the occurrence of heatstroke injuries and deaths of workers.

Second, the implementation of measures to actively promote the prevention of heat stroke work to achieve results.

The townships, the system of trade unions, according to the townships, the actual system, the development of practical work programs to prevent heat stroke, clear summer work objectives, tasks, responsibilities, pay close attention to the implementation. Combined with the "Safety Production Month" and the Fuzhou Municipal Government to carry out special production safety actions, in-depth grass-roots factories and mines to carry out publicity, inspections, visits and condolence activities. Vigorously publicize national laws, regulations, rules and policies on heat stroke prevention and labor protection. Strengthen the supervision and inspection of key enterprises, key places and key areas such as key construction project units, open-air construction, high-altitude operation and high-temperature operation units, units with a relatively high concentration of rural migrant workers in hazardous goods storage and transportation enterprises, and units in which heatstroke accidents among employees have occurred in previous years; supervise and help them to improve the summer safety responsibility system, formulate contingency plans, and implement precautionary and heatstroke-prevention health care measures; and supervise them to take strong measures to Adjust operating hours, improve operating conditions, reduce labor intensity, and increase the investment of funds and distribution of items for heat stroke prevention and cooling to ensure the safety of employees during the summer. We should care about the lives of workers, urge and help enterprises to vigorously improve the living conditions of workers, and ensure that facilities such as workers' dormitories, canteens, toilets and showers meet the needs of heat stroke prevention and labor protection work. To actively organize sympathy activities, so that the production line workers feel from the party and the government as well as trade union organizations care, care.

Inspection visits should be serious and meticulous, and seek practical results. Focus on the following issues: First, the budget and implementation of funds for heat stroke prevention and cooling; second, the development and implementation of ventilation, insulation and cooling measures in open-air and high-temperature workplaces, as well as the arrangement of operating hours for staff in these places; third, the configuration and equipping of labor protection supplies during the summer months; fourth, the issuance of heatstroke medicines and the supply of cool supplies; fifth, the development of publicity and education on knowledge of heatstroke prevention and cooling; and sixth. The early warning mechanism of high temperature weather and the corresponding emergency plan establishment and first aid drills; seven is the summer susceptible to disease monitoring mechanism, the prevention of infectious diseases and food poisoning emergency plan establishment; eight is the organization of employees' physical examination; nine is the grass-roots units of trade unions labor protection inspection committees, trade unions group labor protection inspectors to carry out their duties and play a role in the work of preventing heatstroke and cooling.

Third, to keep the information free, timely report on the important situation of the work of heat stroke prevention and cooling.

The townships, systems and grass-roots trade unions, to strengthen the working contact with the grass-roots trade unions, to keep the information flowing. To summarize and promote enterprises in a timely manner on the prevention of heatstroke innovative initiatives. In the event of heatstroke, poisoning and other accidents, we must promptly report to the government at the same level and the higher-level trade union organizations, and take effective measures to solve the problem. It shall not be delayed, misreported or concealed.

2022 Employee heatstroke program (Part IV)

For enterprise factory workshops, factory workshop cooling is an important work, which is not only related to the efficiency of the factory workshop, but also related to the labor efficiency of the enterprise staff, so we must do a good job of this work, so as to safeguard the health of the operating personnel, improve the efficiency of the work, and constantly improve the labor conditions.

Specific program measures are:

(1) conscientiously implement the responsibility system to prevent heat stroke, to grasp the production site to prevent heat stroke work a series of requirements, effectively strengthen and improve the work of heat stroke, but also to develop emergency plans to prevent high temperature caused by heat stroke and various types of production safety accidents.

(2) pay close attention to the weather forecast of the hot weather, reasonable arrangement of work and rest time, appropriate adjustment of the summer high-temperature operation labor and rest system, reduce the labor intensity of the workers, strict control of the operator's outdoor work time, to avoid the high temperature section of the operation, in order to protect the health and safety of workers.

(3) work to strengthen the rotation of rest, you can take the way of hard shift, so as to shorten the time of a continuous operation, and strengthen the site inspection, increase the knowledge of heat stroke and heat stroke first aid knowledge of the publicity, so as to improve the safety awareness of the whole staff.

(4) The operation site should ensure that there is an adequate supply of drinking water, the site should be supplied with drinking water, beverages, tea, and a variety of soups, etc., in accordance with health requirements, to effectively prevent heatstroke, to avoid heatstroke incidents.

(5) heat stroke prevention and cooling items should be put in place, to effectively care for the front-line staff in hot weather, requiring staff to carry heat stroke medicines, such as cool oil, anemarrhena and so on.

(6) actively improve the site production and living environment, seriously implement the management of the operating site, and actively take effective measures to ventilation and cooling. The rest rooms and canteens in the operation site must be installed with electric fans, and units with conditions should install air conditioners in the rest rooms.

(7) do a good job of summer fire prevention, strengthen fire prevention measures, the distribution room, warehouse, paint room and other flammable places should be regularly inspected, found that the problem should be dealt with in a timely manner, but also in accordance with the provisions of the fire extinguishing equipment.

2022 staff summer cooling program (Part V)

A, Overview

Heat stroke is a high temperature or sun exposure caused by body temperature mediation disorders caused by a group of clinical diseases group, characterized by resting heat, dry skin without sweating and central nervous system symptoms, generally divided into heat stroke resting heat, heat stroke exhaustion, heat stroke spasms and types of solar radiation disease. In daily life, labor production occasionally occurred in the heatstroke injury, the heavy can die on the spot, light if not timely rescue is also life-threatening, therefore, if the corresponding injury should be the first time in the first time to deal with, in order to minimize the harm to the human body, for the later rescue to win time.

Second, the leading group

The project set up the corresponding heat stroke emergency leading group, the leader of the project manager as the deputy leader of the deputy leader of the group by the project department management. And according to the project department's institutional setup and the establishment of each construction team, respectively, set up an emergency group, establish and improve the relevant systems, develop emergency contact methods, and carry out preventive publicity activities. The list of the project department's emergency leadership team is reported to the Production Management Department for the record (list attached). Duties are as follows:

1, team leader: after receiving the alarm, should quickly understand the accident, make instructions for decision-making, and issue emergency rescue orders.

2, deputy leader: according to the rescue order issued by the leader, organizing personnel to carry out rescue work, and do a good job of accident notification and accident handling.

3, the relevant departments

Production Management Department: duty phone set up in the office, responsible for accident reporting; with the competent leadership to do a good job in the evaluation of the accident and the transmission, reporting and other information processing; do a good job in the accident scene to take pictures, collect evidence; according to the leadership instructions, decision-making, uploading and coordinating the work of related matters.

Other functional departments: according to the instructions of the rescue agencies on the scene, timely organization of materials and technical personnel, into the rescue work.

Third, heat stroke performance

(a) high-temperature work thirst, sweat, fatigue, dizziness, chest tightness, nausea;

(b) body temperature in 38 ℃ or more, flushed, burning skin;

(c) heat stroke serious pale, nausea and vomiting, blood pressure drop;

(d) Severe heatstroke with fainting, coma, convulsions or high fever, body temperature of 40 ℃ or more.

Fourth, on-site treatment

(a) quickly get out of the hot environment;

(b) in a cool ventilated place quiet rest;

(c) timely supplementation of cool salty beverages;

(d) the severe cases of rapid physical cooling, the use of ice water or alcohol wipes, fan blowing air;

V. Prevention of heatstroke

(a) educate workers on the prevention of heatstroke awareness;

(b) keep the working environment ventilation, air and shade as far as possible;

(c) issued the necessary labor protection supplies, such as straw hats, umbrellas, etc.

(d) equipped with preventive drugs such as Iao Xiang Zheng Qi Water, Ten Drops of Water, Cool Oil, etc.

2022 Employee heat stroke program (Part VI)

In order to ensure the smooth construction of the new Xingtai modified asphalt base project in Hebei, to ensure that when an emergency situation arises in the construction, the emergency rescue work can be rapid and effective, and maximize the protection of the lives of enterprise workers and property safety, according to the characteristics of this project, this plan is formulated.

First, this plan is for the construction of a variety of different emergencies developed to ensure that a variety of emergency resources are in a good state of readiness; and can guide the emergency action according to the plan in an orderly manner, to prevent the delay of the accident due to the action is not effective or on-site rescue work of the chaos of the emergency, thereby reducing casualties and property losses. Emergency in construction refers to the emergence of a sudden, causing or likely to cause more casualties, larger economic losses of all types of construction accidents.

Second, the establishment of construction emergencies emergency leading group, responsible for the command and coordination of emergency rescue work. Leading group commander-in-chief by the branch manager Sun Qi is responsible for the implementation, if the commander-in-chief out of the assistant manager Lu Zhili as deputy commander-in-chief to give implementation, when the deputy commander-in-chief is not in the case, by the team leader to implement. The implementation of rescue work to start, the specific personnel arrangements see the emergency plan organization.

Third, when a variety of emergency symptoms of high temperature in engineering and building construction occurs, after receiving the emergency report, should immediately start this plan. In the first time, respectively, to the company emergency rescue command center, "120" ambulance center for help, and to the municipal work safety supervision bureau, trade unions and other relevant departments to inform the situation. After the emergency, should also be uninterrupted to the relevant leaders, departmental feedback follow-up.

Fourth, in the construction of emergencies, the branch that is, as appropriate, set up a rescue site command, by the manager of the Sun Qi as the chief commander of the scene of the accident, and set up the following leading groups:

1, heat stroke protection group

summer work process, due to the more open-air working environment; personnel work in the distribution of the region is complex, variable; labor intensity, etc., to the work of many inconveniences, to the work of a lot of people. In order to protect the legitimate rights and interests of workers and life, property safety, for the staff to create a guaranteed, comfortable environment, in the staff of the occurrence of high-temperature adverse reactions, by the team leader to immediately organize the members of the group, the accident personnel transfer and control, to prevent the increase of accident personnel around the scene. Make the emergency action has a stronger target, improve the efficiency of the action. So as not to cause huge accident losses.

2, information liaison group

by the head of the group is responsible for understanding the casualties and economic losses and the scope of the impact of emergencies, the daily organization of the collection of weather and temperature conditions, and then take the necessary precautions, and on the measures taken and the development of the situation, and timely reports to the superiors and the liaison of relevant departments.

3, safety and security (vigilance) group

The evacuation zone and resettlement area of the security work, the team leader is responsible for organizing team members to monitor the development of dangerous conditions, to prevent the impact of the construction period, and to strengthen the safety education of the personnel of the various shifts in order to further enhance the awareness of safety and the organization of the site management personnel to carry out a safety inspection of the construction site, to eliminate potential safety hazards, in order to prevent the occurrence of accidents and how to prevent accidents when they occur. The occurrence of accidents and how to minimize the impact of accidents once they occur.

4, on-site medical rescue team

When the accident occurs, the team leader organizes the team members on-site classification and first aid treatment of the injured, is responsible for the first time to the injured to implement effective rescue; and timely transfer to the hospital. The main responsibilities of the ambulance staff are: to enter the accident area to rescue the injured; to guide the people in the hazardous area to carry out self-rescue and mutual rescue activities; to concentrate, count, convey and admit the injured. According to the specific circumstances, the rapid development of emergency treatment programs and organization and implementation.

5, logistical support team

by the head of the organization is responsible for mobilizing rescue personnel, materials and equipment, supervise and check the implementation of rescue and relief measures in place.

5, in the construction of the emergency occurred, the rescue site command according to the specific circumstances, can be nearby from Xingtai Road and Bridge asphalt library mobilization rescue teams, personnel, materials and equipment. At the same time professional rescue team, materials and equipment from the emergency reserve rescue team mobilization.

Six, after the occurrence of various types of emergencies, the need to mobilize the main professional rescue teams, emergency rescue materials. The main materials and personnel duties are arranged as follows:

1, personnel, materials preparation:

The acquisition of branch materials by the manager is responsible for the main medicines and medical rescue appliances are as follows:

(1), medicines: cold medicines, fever medicines, diarrhea medicines, anti-inflammatory medicines such as therapeutic medicines and Rentan, ten drops of water, orthosiphon water, chrysanthemum tea, fire-reducing herbal teas, green health food, green bean The company's products are also available in a wide range of colors and sizes.

(2), ambulance apparatus: single frame, ambulance cars, small oxygen cylinders, earpiece, beds, towels, medicines, medicine boxes, freezers (ice) and so on.

VII. Rescue methods:

1, mild patients

When the site staff dizziness, fatigue, dazzle phenomenon, the staff should immediately stop the operation, to prevent secondary accidents, other peripheral staff should be symptomatic personnel arranged to the cool, well-ventilated area to rest, the supply of cool water, wet towels and so on. And notify the leadership of the branch.

2, serious patients (fainting, shock, severe body dehydration, etc.)

When the work site appears heatstroke personnel, the operation of the peripheral staff should immediately notify the leadership of the branch plant, and promptly transfer the accident personnel to a cool, well-ventilated area to observe their symptoms, so as to facilitate the arrival of medical personnel to grasp the first-hand information on medical treatment. The branch plant should be based on the specific circumstances, the emergency commander decides whether to start the emergency plan for heat stroke prevention and cooling. And immediately organize ambulance personnel in person to the scene of the accident personnel treatment. In the case of serious symptoms, if the medical equipment of the branch plant cannot save the person, the person should be transferred to the nearest hospital for observation and treatment at the first time. And reported to the company.

VII, the aftermath of the work:

1, according to the accident "four do not spare" principle, do a good job of investigating and handling accidents, to take targeted precautions, strengthen the publicity of the team, education, so that each person has mastered the precautions of the summer construction process, so that each person knows to protect know how to protect themselves; know how to rescue others. Summarize the lessons learned, to prevent the occurrence of similar events, specific precautionary measures are as follows:

(1), set up by the information team in the construction site thermometer, and the daily collection of weather conditions, processing, and then reported to the plant to prevent heat stroke protection team, according to the specific circumstances of the corresponding safety precautions taken.

(2), when the outdoor temperature is higher than 39 ℃, the plant should be the construction of each team cooling special safety instructions, so that the team to stop the site construction work.

(3), the logistics support team should be able to ensure that the staff site at any time drinking water, emergency drugs.

(4), by the heat stroke emergency rescue organizations in accordance with the temperature of the year to develop a set of reasonable and effective "staff schedule" to avoid the highest daily temperature (11:00 ~ 15:00) section of the construction work. Discussed by the branch, the development of the company's summer (based on the city's calendar year high temperature months for July to September) construction schedule, specifically as follows:

Morning: 8:00 ~ 12:00

Afternoon: 15:00 ~ 19:00

In the event of a rush or other special circumstances require overtime work, and then do another notice.

(5), the branch of the safety education of the team to enhance the staff of the various situations should be dealt with tightly. Strengthen the summer construction safety publicity work, so that each person understands and masters the safety of heat stroke prevention and cooling common sense, improve the staff's ability to cope with the strain of practice and processing capacity.

Eight, emergency recovery, re-entry

When the emergency recovery, re-entry must be evaluated before the hazardous area, and should be analyzed for accidents, to be determined by the hazardous area has been safe before entering the scene, continue to operate.

IX, emergency drills

Emergency plans and emergency plans established, after effective training, branch or company before the arrival of the summer each year to carry out large-scale rescue drills. At the end of each exercise, a timely summary, there are certain gaps in the future work to improve.

1, the purpose of the exercise

1), test the effectiveness of the emergency plan and implementation procedures and the degree of adequacy

2), test the emergency equipment

3), to ensure that the emergency response organization is familiar with their tasks and responsibilities

4), test the coordination of emergency response personnel

5), to identify and correct deficiencies in the plan. /p>

6), test the adequacy and effectiveness of emergency equipment

2. Emergency plan drills

In order to improve the technical level of the rescue personnel and the overall ability of the rescue team, so as to achieve a rapid, orderly and effective effect in the rescue operations of the accident. The branch will regularly carry out a rescue drill, emergency rescue training has become an important work of the rescue team, so in the emergency rescue process, the branch also emphasizes the following four points:

(1), the drill personnel must be on time in place, and equipped with their respective protective equipment.

(2), in the rescue process should be "self-protection, rescue others" and active and effective rescue.

(3), must strictly abide by the leadership of the command, to do "false to the truth", the effective implementation of rescue measures.

(4), the basic task of emergency training and exercises is: to exercise or improve the team's unexpected accidents, rapid rescue and blocking the source of timely rescue of the injured, correctly guiding and helping the masses to protect or evacuate, effectively eliminating the consequences of hazards, to carry out on-site emergency first aid and casualty evacuation and other emergency rescue skills and emergency response to comprehensive quality, and effectively reduce the hazards of the accident, reduce the accident losses.