Square-cabin hospitals are one type of hospitals built in Wuhan to treat patients with mild pneumonia infections. It is reported that as of February 4, Wuhan cumulative planning and construction of 13 square cabin hospitals, providing nearly 10,000 beds, and strive to make all the sick infected people can get good treatment.
Wuhan new 11 square cabin hospitalAs of 22:00 on the 4th, Wuhan has requisitioned 11 venues transformed into "square cabin hospital". 3 February night, Wuhan City overnight built Hongshan Stadium, Wuhan living room, Wuhan International Convention and Exhibition Center, three "square cabin hospital ". Today (February 4), Wuhan and then build 8 "square cabin hospital":
Hanyang, Wuhan International Expo Center, "square cabin hospital" is completed tonight, the number of beds 1000;
Jiangan, Tazihu Sports Center is built tonight, the number of beds 1000;
Jiangan, Tazihu Sports Center is built tonight, the number of beds 1000;
Jiangan, Tazihu Sports Center is built tonight. The number of beds 1000;
_Kou, Wuhan Gymnasium beds 300;
Hongshan, Shipaling Vocational High School beds 800;
Wuhan Development Zone, Wuhan Sports Center was built on the 5th, the number of beds 1,100;
Guanggu Hi-tech Zone, Wuhan Optics Valley Science and Technology Conference and Exhibition Center beds 1,000;
Jiangsha District. Dahuashan Outdoor Sports Center beds 1,000;
Huangpi District, Huangpi a stadium beds 500 after the completion of the renovation, the total *** will be able to provide more than 10,000 beds.
Square Cabin Hospital patient admission and reassignmentIt is reported that the "Square Cabin Hospital" will be fully admitted to the new coronavirus infection of pneumonia patients with mild disease - if the patient's condition turns serious, will be transferred to the hospital for diagnosis and treatment.
The National Health Commission said on the 4th, "We have mobilized 20 square cabin hospitals, will arrive in Wuhan from today; we have mobilized 1400 nurses from the country to Wuhan to look after the patients; at the same time from the Chinese CDC, the Chinese Academy of Medical Sciences, Guangdong Province CDC mobilized the 3 mobile P3 laboratory."
Wuhan National Fitness Center "square cabin hospital"1000 beds paved in place on the evening of the 4th
February 4 afternoon, the reporter learned from the Jiangan District Prevention and Control Command, the district plans to build the Wuhan National Fitness Center can accommodate 1,000 beds in the "Square Cabin Hospital ".
The place is located in Jiangan District, Houhu Avenue, 1,000 beds set up in the Wuhan National Fitness Center on the first floor, for the admission and treatment of patients with mild fever. Jiangan District is currently with the design and construction unit urgent communication layout construction, it is reported that the beds and beds will be partitioned, the installation of mobile toilets, power, switches and other infrastructure equipment, equipped with mobile CT and other medical equipment.
3 p.m., the purchase of beds are being transported to the arena, the site staff has been put into intense site cleanup and bed laying. It is reported that the "square cabin hospital" 1,000 beds on the night of the 4th to all paved in place.
Wuhan Stadium "square cabin hospital"with 20 mobile toilets to accommodate nearly 300 beds
February 4 afternoon, is located in Jiefang Avenue, No. 612, outside the Wuhan Stadium, extermination vehicles, delivery vehicles came one after another. Reporters learned from the _ mouth district prevention and control headquarters, is expected to 5 at 2 a.m., the 60-year-old stadium will be built to accommodate nearly 300 beds "square cabin hospital".
Wuhan stadium main hall is divided into two floors, the hospital will be set up outpatient clinic, equipped with mobile CT and other medical equipment, observation and treatment of patients into the treatment. In addition the District Urban Management Bureau will build 20 mobile toilets for the convenience of patients.
At 4:30 p.m., the reporter saw at the scene, the venue has been cleaned up, and the staff of various units are entering the field one after another. more than 60 sanitation workers are carrying folding beds and laying down quilts in a nervous and orderly manner.
Shipaling Senior Vocational High School "square cabin hospital"Built in less than a day to accommodate 800 beds
February 4, Hongshan District, Hongshan District Prevention and Control Command disclosed that before 12 noon on the 5th, Hongshan District, Wuhan City, Shipaling Senior Vocational High School will be added a new "square cabin hospital", by the Hongshan District, the Wuhan City, Shipaling Senior Vocational High School will be added a "square cabin hospital". Hospital", constructed by the Hongshan District Education Bureau, accommodating 800 beds.
4 p.m., the Yangtze River Network reporter saw at the scene, the Hongshan District education system of nearly 100 party members and cadres are composed of "human chain", the classroom tables and chairs to the outdoor transfer. As of 6 p.m., Shipaling Vocational High School teaching building up and down 4 layers ****50 classrooms have been vacated.
According to the main person in charge of the Hongshan District Education Bureau, each classroom can hold 8 to 12 beds, plus an indoor sports hall, which is expected to accommodate 800 beds. Taking into account the large number of personnel, the relevant departments are actively cooperating with the construction of a number of mobile toilets again, in addition to bedding, masks, hot water bottles and other equipment delivery work is also being synchronized, it is expected that all can be put in place before 12:00 noon on the 5th. In the future, food will be unified distribution.