Regulations on Safety Supervision of Large-scale Amusement Rides

(August 15, 2013 General Administration of Quality Supervision, Inspection and Quarantine Decree No. 154 published, according to April 2, 2021 "State Market Supervision and Administration on the abolition and revision of some of the regulations of the decision" to amend)

Chapter I General Provisions

Article 1 In order to strengthen the large-scale amusement rides safety supervision, prevention and reduction of accidents, to protect the safety of persons and property, according to the "Chinese People's *** and State Special Equipment Safety Law", "Special Equipment Safety Supervision Regulations", the formulation of these provisions. Chinese People's Republic of China *** and State Special Equipment Safety Law", "Special Equipment Safety Supervision Regulations", the formulation of the provisions.

Article II large-scale amusement facilities design, manufacture, installation, transformation, repair, use, inspection, testing and supervision and inspection, shall comply with these provisions.

Article 3 The State Administration of Market Supervision is responsible for the national large-scale amusement ride safety supervision work of integrated management, above the county level local market supervision and management departments are responsible for the administrative region within the large-scale amusement ride safety supervision.

Article IV engaged in large-scale amusement ride design documents identification, type test, supervision and inspection, periodic inspection of special equipment inspection agency shall be approved by law, before engaging in the corresponding activities, and its identification, inspection results are responsible for.

Article V large-scale amusement rides manufacturing, installation, alteration, repair units should be licensed according to law before engaging in the corresponding activities, and its manufacturing, installation, alteration, repair of large-scale amusement rides is responsible for the safety performance.

Large-scale amusement facilities operating units responsible for the use of large-scale amusement facilities safety.

Article 6 to encourage the implementation of large amusement rides related to liability insurance system to improve emergency response and payout capacity.

Chapter II large-scale amusement ride design, manufacturing, installation

Article VII of the manufacturing unit should be designed for large-scale amusement ride safety assessment, safety risk prevention and control measures.

For the first time the use of new technologies, manufacturing units should verify their safety performance.

Article VIII of the manufacturing unit should indicate the large-scale amusement rides machine, the main stressed parts of the design period.

In the whole machine design period of time for inspection, testing or replacement of parts, should be designed for the detachable structure; can not be designed for the detachable structure of the components, the design period shall not be less than the whole machine design period.

Article IX large-scale amusement facilities design is completed, the manufacturing unit shall apply to the special equipment inspection agency according to law to identify the design documents.

Special equipment inspection agency shall be in accordance with the requirements of the safety specifications for the identification of design documents.

Article 10 The manufacturing unit shall be in accordance with the design documents, standards, safety specifications and other requirements for manufacturing.

Manufacturing unit commissioned the processing of parts or outsourcing of parts, should be in accordance with the requirements of its quality system, to strengthen quality control and bear responsibility according to law.

Article 11 In accordance with the requirements of the safety specifications, should be carried out type test of large-scale amusement rides or trial production of large-scale amusement rides of new products, the manufacturing unit shall apply to the special equipment inspection agency for type test.

Before applying for type test, the manufacturing unit should be made on the trial of new large-scale amusement rides to develop test programs, safety performance tests and testing.

Article XII of large-scale amusement rides factory, should be accompanied by proof of the quality of the main stress components, design documents identification reports, installation and use of maintenance instructions and other documents. Mobile large amusement rides should also be accompanied by instructions for dismantling.

Article XIII of large-scale amusement rides should be clearly stipulated in the use of maintenance instructions, technical parameters, operating procedures, passenger instructions, test run inspection projects, personnel requirements, daily and periodic inspection of equipment and inspection projects, maintenance projects and requirements, common failures and troubleshooting methods, emergency disposal of accidents, the machine and the main stressed components designed to use the period, the main stressed parts of the detection and replacement of wearing parts and methods of periodicity. The cycle and method of replacement of wearing parts.

Article 14 The installation unit in the installation before construction, should confirm the site, equipment foundation, buried parts and other civil works in line with the quality of civil engineering supervision and management requirements.

Article 15 The installation unit shall be installed before construction of large-scale amusement rides to be carried out in writing to inform the municipality directly under the Central Government or the market supervision and management departments of the city, informed that the construction can be.

Mobile large amusement rides reinstalled, the installation unit shall be in accordance with the provisions of the construction before the municipality directly under the Central Government or the city market supervision and management departments.

Article 16 The installation unit shall implement the quality management system and management system, in strict accordance with the design documents, standards, safety specifications, construction programs and other operations, to strengthen the site construction quality management.

Large amusement facilities installation construction site operators should meet the construction requirements.

Article XVII of the installation process of large-scale amusement rides should be in accordance with the scope of safety specifications, projects and requirements, by the special equipment inspection agency in the enterprise self-test on the basis of the installation supervision and inspection; supervision and inspection of non-installation shall not be delivered to the use of; the operation of the unit shall not be unauthorized use of large-scale amusement rides without the installation of supervision and inspection of qualified.

Article 18 The installation of large-scale amusement rides after the completion of the installation unit should be installed in the obvious parts of large-scale amusement rides installed in line with the requirements of the safety specifications of the nameplate.

The installation unit should be accepted within 30 days after the factory random documents, type test certificate, installation supervision and inspection and non-destructive testing reports, as well as by the manufacturing unit to confirm the quality of the installation certificate, product quality certification, commissioning and commissioning records, self-inspection reports and other technical information on the installation transferred to the operation and use of the unit for archiving.

Chapter III Large-scale amusement facilities use

Article 19 of the large-scale amusement facilities in the use or put into use within 30 days after the operation of the use of units should be directly under the Central Municipality or the market supervision and management of the city's municipal registration.

Mobile large amusement rides in each reinstallation before putting into use or put into use within 30 days after the operation of the unit should be directly under the Central Government or the city market supervision and management department registration; mobile large amusement rides dismantled, it should be in the original use of the registration department for the cancellation procedures.

Operation and use of the unit shall be placed in the registration sign of large amusement rides such as import and export locations.

Article 20 The operation and use of large amusement rides should be installed in the supervision and inspection is completed within 1 year, to the special equipment inspection agency for the first time to apply for periodic inspection; in the large amusement rides periodic inspection cycle expires 1 month before the operation and use of the unit should be to the special equipment inspection agency to put forward the requirements of the periodic inspection.

Special equipment inspection agency shall be in accordance with the requirements of the safety specifications for periodic inspection.

Article 21 The operation of the unit shall establish and improve the safety management system. Safety management system should include the following main elements:

(a) technical file management system;

(b) safety operating procedures;

(c) daily safety inspection system;

(d) maintenance system;

(e) regular inspection system;

(f) operations and service personnel code;

(g) operators and related operations and services personnel safety Training and assessment system;

(viii) emergency rescue drill system;

(ix) accident and incident handling system;

(x) other.

Article 22 The operation of the use of units should be on each (set) large-scale amusement rides to establish technical files, according to management and preservation. Technical files should include the following main content:

(a) the installation of technical information;

(b) supervision and inspection reports;

(c) the use of registration forms;

(d) transformation, repair of technical documents;

(e) annual self-checking records;

(f) periodic inspection reports;

(g) records of emergency rescue drills;

(h) operation, Maintenance, equipment failure and accident handling records;

(ix) operators training, assessment and certification management records;

(x) other content provided by laws and regulations.

Article 23 The operation and use of the unit should be in accordance with safety specifications and the use of maintenance instructions for the requirements of the equipment before the operation of the commissioning inspection, routine inspection and maintenance, regular safety inspections and factual records. Routine maintenance and test run inspection and other self-inspection of the abnormalities found in the inspection, should be dealt with in a timely manner. In the national legal holidays or held before large-scale mass activities, the operation and use of units should be a comprehensive inspection and maintenance of large-scale amusement rides, and strengthen the daily inspection and safety duty.

Operation and use of the unit to carry out the maintenance of the unit's equipment, should be in accordance with the safety specifications required to be equipped with the appropriate qualifications of the operators, the necessary tools and equipment.

Article 24 The operation of the use of large amusement rides should be posted at the entrance and other prominent passenger instructions, safety precautions and warning signs, indicating the characteristics of the movement of the equipment, the passenger range, contraindications.

Article 25 The operation of the unit should develop emergency plans, the establishment of emergency rescue command organization, equipped with appropriate rescue personnel, rescue equipment and first aid items. For each (set) of large amusement facilities should also develop a special emergency plan.

Operation and use of the unit should strengthen the rescue equipment, first aid items stored and managed, the rescue personnel for regular professional training, at least one emergency rescue drill per year for each (set) of large-scale amusement facilities organization.

Operation and use of the unit can be based on local conditions, and other operations and use of the unit or fire rescue and other professional emergency rescue forces to establish emergency response mechanism, develop joint emergency plans, and regular joint exercises.

Article 26 The operation of the legal representative or person in charge of the use of large-scale amusement facilities is responsible for the safe use of management.

Article 27 The operation of the use of units should be set up to specialize in safety management bodies and safety management personnel, or equipped with full-time safety management personnel, and to ensure that during the operation of the equipment, at least one safety management personnel on duty.

Operation and use of units, safety management organizations and safety management personnel, should perform the following duties:

(a) responsible for checking the implementation of the unit's safety management system;

(b) responsible for the development and implementation of equipment maintenance and safety inspection program;

(c) responsible for the use of equipment for daily inspection, investigation of potential accidents, found that the problem should be stopped to use the equipment, and promptly report to the person in charge of the unit. And timely report to the unit responsible;

(d) is responsible for the organization of equipment self-inspection, reporting the use of registration and periodic inspection;

(e) is responsible for the organization of emergency rescue drills;

(f) is responsible for the organization of the unit's personnel safety education and training;

(g) is responsible for the management of the technical file.

Article 28 The operation and use of the unit should be in accordance with safety and technical specifications and the use of maintenance instructions, equipped to meet the safety requirements of the operation of licensed operators, and strengthen the pre-service training and education of service personnel to enable them to master the basic emergency response skills, to assist the operator to carry out emergency response.

Operators should fulfill the following duties:

(a) strict implementation of the operating procedures and operator code.

(2) Each time before the operation should be informed of the safety precautions to passengers, the protection of passengers to check the safety devices to confirm.

(C) operation should pay close attention to the passenger dynamics and equipment operating status, found abnormalities, should immediately take effective measures to eliminate potential safety hazards.

(d) Familiarize yourself with the emergency rescue process. Failure or emergency, should immediately stop running or take emergency measures to protect passengers, and immediately report to the site safety management.

(E) truthfully record the operation of the equipment.

Article 29 of the transformation of large-scale amusement facilities, the transformation unit should be redesigned, in accordance with the provisions of the identification of design documents, type testing and supervision and inspection, and the transformation of the quality of equipment and safety performance is responsible for.

Large-scale amusement facilities should be transformed before the construction of large-scale amusement facilities to be carried out before the transformation of the municipality directly under the Central Government or the city market supervision and management departments, informed that the construction can be.

After the completion of the transformation of large-scale amusement facilities, the construction unit should be installed in line with the requirements of the safety specifications of the nameplate, and in the acceptance of the technical information in line with the requirements of Article XVIII transferred to the operation of the unit archives.

Article 30 of the repair of large-scale amusement facilities, major repairs should be carried out in accordance with safety specifications and maintenance instructions. Large amusement ride repair unit should be carried out before the construction of large amusement rides to be repaired in writing to inform the municipality directly under the Central Government or the city market supervision and management departments, informed that the construction can be.

Major repair process, must be special equipment inspection agency in accordance with the requirements of the safety specifications for major repairs supervision and inspection; without major repairs supervision and inspection shall not be delivered for use; operation and use of the unit shall not be used without major repairs supervision and inspection of qualified large-scale amusement facilities.

After the completion of the repair of large-scale amusement facilities, the construction unit should be related to large-scale amusement facilities, such as self-inspection reports and other repair-related information transferred to the operation of the use of the unit archives; large-scale amusement facilities after the completion of the major repairs, the construction unit should be related to large-scale amusement facilities, self-inspection reports, supervision and inspection reports, and non-destructive testing reports, such as transfer to the operation of the use of the unit archives.

Article 31 large-scale amusement facilities transformation, major repairs to the construction site operators should meet the construction requirements, the number of operators with the appropriate special equipment qualifications should be in line with the requirements of the safety specifications.

Article 32 of the large-scale amusement facilities in the event of an accident, the operation of the unit should immediately stop using, and in accordance with relevant regulations in a timely manner to the local market supervision and management departments at or above the county level report.

For the design, manufacture, installation causes failure, accident, there are quality and safety issues hidden, manufacturing, installation units should be the same type of equipment to investigate and eliminate hidden problems.

Article 33 of the design of the machine over the use of the period of time still have repair, transformation value can continue to use large amusement rides, operation and use of units should be in accordance with the requirements of the safety specifications through the inspection or safety assessment, and for the use of the certificate of registration change. Operation and use of units should be allowed to continue to use the use of large-scale amusement facilities management, to take measures to strengthen inspection, testing and maintenance, increase the frequency of comprehensive self-test to ensure the use of safety.

Large-scale amusement facilities, the main stress components over the design period required, and inspection or safety assessment does not meet the conditions of safe use, should be replaced in a timely manner.

Article 34 The operation of the use of rental sites to carry out large amusement rides business, should be provided with the site to sign a safety management agreement, the implementation of safety management system.

The site should be provided to verify that the operation of large amusement rides using units to meet the relevant laws and regulations, as well as the requirements of this provision of the operation of the conditions of use.

Chapter IV Supervision and Inspection

Article 35 The market supervision and management departments in accordance with the "Chinese People's *** and the State Special Equipment Safety Law", "Special Equipment Safety Supervision Regulations" and the provisions of the relevant requirements of large-scale amusement rides, production, use of units and inspection, testing organizations to implement supervision and inspection.

Article 36 of the special equipment inspection agency to carry out tests, should be informed of the use of the market supervision and management departments responsible for registration. After the completion of the test, the supervision and inspection, periodic inspection reports to the market supervision and management departments responsible for the use of registration for the record.

The inspector shall be in accordance with the requirements of the safety specifications to the inspected unit issued a written test and reported to the market supervision and management departments responsible for the use of registration, the scene does not have the conditions of the test, it should be in writing to the inspection unit issued by the relevant information.

Article 37 of the large-scale amusement ride accident investigation and handling, in accordance with the provisions of laws and regulations.

Chapter V Legal Liability

Article 38 of large-scale amusement rides manufacturing, installation units in violation of the provisions of one of the following circumstances, be warned, impose a fine of 10,000 yuan or more than 30,000 yuan:

(a) the design of the design is not a safety assessment, the proposed safety risk prevention and control measures;

(b) the design of the first time the use of new technologies to verify the safety performance;

(C) does not specify the machine, the main stress components of the design of the use of the period;

(D) not in the obvious parts of large-scale amusement facilities installed in line with the requirements of the relevant safety specifications of the nameplate;

(E) the use of maintenance manuals and other factory documents do not meet the requirements of the provisions of the content;

(F) due to the design, manufacturing, installation reasons, there are quality and safety issues of hidden problems, in accordance with the requirements of the provisions of the investigation and treatment. Requirements for investigation and processing.

Article 39 of the large-scale amusement facilities in violation of the provisions of the transformation unit, without identification of design documents, be warned, at 10,000 yuan more than 30,000 yuan fine.

Article 40 The operation of large-scale amusement facilities in violation of the provisions of the unit, one of the following circumstances, be warned, at 10,000 yuan more than 30,000 yuan fine:

(a) equipment operation, no safety management personnel on duty;

(b) equipped with licensed operators failed to meet the requirements of safe operation;

(c) failure to replace more than the design of the period of time required and the safety assessment does not meet the safety requirements. Inspection or safety assessment does not meet the conditions of safe use of the main stressed parts;

(4) rent space to carry out large-scale amusement rides business, not with the venue to provide units to sign a safety management agreement, the implementation of safety management system;

(5) not in accordance with the safety and technical specifications and instructions for the use of maintenance, such as the requirements of the major repairs.

Article 41 violation of the provisions of the installation, transformation and major repairs to the construction site of the number of operators can not meet the construction requirements or the number of operators with the corresponding special equipment does not meet the number of qualifications required by the safety specifications, to be warned, and impose more than 5,000 yuan