Bridge construction internship content and process, not less than five thousand words

Internship summary report

Chengde City, Hebei Province, sewage treatment project is a national key construction project - Hailuan River Basin Water Pollution Control Project in the Chengde sewage treatment project, the project was built in the southeast of Chengde City District, Taipingzhuang, covers an area of about 6.79 hectares. The project is designed by the China Municipal Engineering North China Design and Research Institute and Hebei Chengde Municipal Engineering Design Institute, completed in two phases of construction; the first phase of the construction scale of 80,000 tons of sewage daily sewage treatment plant a sewage treatment plant and ancillary pipeline network of 36.5 kilometers, the second phase of the construction of the treatment capacity of 120,000 tons / day. A total investment of 234.4 million yuan, of which, 126.5 million yuan of foreign capital (included in the Asian Development Bank loan project), the national debt special funds and local supporting 107.9 million yuan. Project construction using advanced technology and equipment at home and abroad, is expected to be completed and put into use in 2007, the treated water quality will reach the national urban sewage treatment plant pollutant discharge standards level B standard. Chengde City District, all living, industrial sewage treatment, from the root control of urban sewage on groundwater sources and downstream Beijing, Tianjin and Tang water pollution, for the city of Chengde and Beijing, Tianjin and Tang areas of sustainable socio-economic development to provide a reliable guarantee for the governance of the Haihe River system to provide important support. At the same time, the protection of the environment and the development of resources combined with environmental management projects, is the city of Chengde City to implement the strategy of sustainable economic development of a specific work, with far-reaching ecological, social and economic significance.

First, the main content of the internship

The internship period according to the company's project department arrangements to complete the following tasks

1, engineering quality inspection

2. Project site management

Chengde City, as the company's sewage treatment project is the focus of the project, but also Chengde City's key projects. In the construction process, the quality requirements are very strict. As a quality inspector of the project department, I y feel the great responsibility to survive on quality and develop on quality, and every word makes me not dare to slacken off in my daily life. From the familiarization of drawings to the scene of the inspection, from the humble teachings to the actual work of communication, so that I fully understand the theoretical knowledge learned in the school only to the scene in order to play its German maximum utility. Theory and practice is an unbreakable truth. In the construction site, some of the situation changes quickly, often unexpected factors, these factors are small, affecting everyone's mood, large impact on the quality and progress of the project. This requires that in the actual work of the absolute can not be patterned, there are problems in a timely manner to consult the leadership. According to the reality of the situation to make appropriate adjustments and arrangements. As a key project, on-site acceptance not only requires familiarity with drawings, will use a variety of instruments. More importantly, it is to understand the relevant national norms and standards, because one of the most important is to complete each process in strict accordance with the relevant national regulations, norms and standards. Strictly prohibit jerry-building, strict implementation of the three inspections, each process only after layers of acceptance, before entering the next process. In this way, to ensure the quality of the entire project.

As a project, especially the decoration project, the construction process is complex, the material varieties, the construction of various types of work groups. This requires us as on-site construction management personnel must make technical preparations, first of all, must be familiar with the construction drawings, for specific construction contract requirements, to the maximum extent possible to optimize each process, each sub-item (part) of the project, taking into account their own resources (construction team, material supply, capital, equipment, etc.) the climate and other natural conditions, serious and reasonable construction organization plan, from large to small, from surface to point, to ensure that each sub-item of the project, and to ensure that each sub-item of the project, and to ensure that each sub-item of the project. and points, to ensure that each sub-project can be included in the scope of control. In the construction process, only with high-quality technical management personnel, insight into the specific construction process to ensure that the construction process of each step in the process of mastery, know by heart, do a good job in all aspects of the handling of emergencies in preparation for the program, in order to ensure that can be completed on time and quality. Through planned and purposeful training, technical briefing, can make the construction technology workers, foreman familiar with the new construction technology, new material characteristics, *** with the improvement of technical operation, construction level, and then ensure the quality of construction, and then, from a technical point of view, the construction quality issues whether to meet the relevant design requirements and the relevant norms and standards, only from the construction process of each process to make a strict requirements are Far from enough, there must be a corresponding quality inspection system, and the establishment of a sound quality control system, quality control means must be scientifically proven, so it is necessary to do a good job of technical reserves, for each process, each construction process of the specific circumstances of the different quality acceptance criteria to ensure the quality of the project.

The key to construction is progress and quality. For progress, in principle, according to the original construction organization plan. But as a project, the site situation is ever-changing, such as material supply, design changes and so on inevitably, absolutely can not be patterned, must be adjusted according to the actual situation, the arrangement. Construction quality can be guaranteed, the main thing is to be strictly in accordance with the relevant national norms and relevant standards to complete each process, is strictly prohibited to cut corners. Must implement the "three check" system, that is, self-inspection, special inspection, joint inspection, through layers of inspection, acceptance before being allowed to enter the next process, so as to ensure the quality of the entire project.

In a certain sense, people are the key to the success or failure of the project. All engineering projects are created through the people will be material organization. Only with a creative, disciplined construction team to complete a good quality project. How can the construction team of technical management personnel and skilled workers organically kneaded into a close guard? First of all, must create an atmosphere of honor and disgrace and ****, clear responsibilities but without losing affinity, so that all employees feel that they are a member of the family of this project. Some of this, we need to give full play to our construction site management personnel to give full play to their talents, the workers should be rewarded and punished clearly, and more encouragement, more organized all kinds of production and life competitions, from the spirit of the material two-pronged, cultivate cohesion. Secondly, we must clarify the management system of the construction team, the duties of each position, the rights are clear, so that the order must be carried out. A disciplined construction team, in the face of tight deadlines, technically complex projects, only resolutely obey the command, in order to complete the construction tasks on time and quality. Furthermore, the appropriate use of economic leverage for specific situations, the management of personnel must play an unexpected role.

The management of a project, in addition to materials, construction, technology, personnel management recognition, there is a problem that can not be ignored is the management of information. Acceptance of any project, there must be a completion of this information. Completion data contained in the certificate of conformity of materials, inspection reports, as-built drawings, acceptance reports, design changes, measurement records, hidden engineering acceptance sheet, the technical parameters of the determination of acceptance sheet, work contact letters, engineering visas, etc., are required throughout the construction of the project we should pay attention to one by one to collect the classified archives. If omitted, the completion of acceptance and project settlement will bring unnecessary losses, some of the impact is immeasurable. For the protection of finished products, we must take the active and passive combination of practices to protect. The so-called active, that is, to take the relevant precautionary mandatory system, such as not allowed to use the iron ladder on the ground in the finished product and other provisions of the so-called passive, that is, to take the relevant means of collision and other means of protection of the finished product, such as in the glass and other fragile products on the cover of plywood and other measures. In short, the finished product protection issues must be spoken every day, every day to grasp, heavy governance, to strengthen the inculcation of finished product protection awareness, improve workers' understanding. Management of the construction site is a more complex work, must be prepared at any time, all aspects need to be prepared to work together in order to complete the construction tasks on time and quality.

Second, the internship experience

Practice is the second classroom of university life, is the source of knowledge and development of the source is always new, is the litmus test of the truth, is also an effective way for college students to exercise growth. A person's knowledge and ability can only play a role in practice, can be enriched, perfected and developed. College students to grow, we must be diligent in practice, will learn the theoretical knowledge and practice together, in practice, continue to learn, constantly summarize, gradually improve, and innovation, and in practice to improve their knowledge, ability, wisdom and other factors into the comprehensive quality and ability, for the success of their own career to lay a good foundation.

In the blink of an eye, in Chengde sewage treatment works has been nine months. In these nine months, life is full of novelty and challenge. Every day for me, I am constantly learning and progressing. At the same time, I y realize that life is a continuous learning process. The internship in a good company and a good project department should have a far-reaching impact on the interns. There are technicians with rich field management experience and professional skills in the project department, which is a great help to the growth of our interns. At the same time, during the internship period, I realized that only through hard work and diligence can I grow up continuously. I firmly believe that through this period of internship, the practical experience gained for my lifelong benefit, in my practical work after graduation will continue to be verified, I will continue to understand and appreciate the knowledge learned in the internship, in the future work I will be the theoretical knowledge and practical experience I have learned to continue to apply to the actual work, in order to realize the ideal of self-realization and the bright future efforts.

Third, a few suggestions

1, it is recommended that the school practice classes more open to the field of theoretical knowledge, but often encounter some problems can not be solved, of course, this practice class is very broad, mainly including the exchange of ideas, skillful use of equipment, as well as self-expression ability and so on.

2, more quality, safety education. Into the internship site, the general internship safety awareness is not very good, often in the construction process by the injury or hurt, so no matter on the company or on their own, is a loss.

3, more activities to develop a strong sense of ownership of college students. In the construction site, as the construction management personnel themselves should have a strong sense of ownership, the project as their own, regardless of the size of the job always be diligent, in doing their jobs while also caring about other aspects of the project. Because as employees and the company's relationship is unified, a glory, a loss.

4, I hope the school is doing better and better. In the coming days for the community to continue to cultivate a large number of construction talent.