With the continuous improvement of laws and regulations, people pay more and more attention to the contract, the use of the contract is more and more extensive, the signing of the contract can make our legitimate rights and interests are protected by law. So what is the common contract book like? The following is what I have organized for you about the maintenance contract model (selected 5), I hope it can help you.
Maintenance contract model 1Party A: Party B:
In accordance with the "People's Republic of China **** and the State Economic Contract Law" and the State Ministry of Construction, the provincial and municipal construction committees of the relevant provisions of the decorative works, the two sides negotiated the contract is as follows:
First, the project
1, the project name:
2, the project location: Inner Mongolia Autonomous Region People's Hospital
3, the project contracting method: package construction
Second, the project decoration content
1, _______
2, _______
Third, the cost of the project
The cost of the project is based on Party A's requirements for use and design requirements;
The cost of the project is: ¥_______.
Fourth, the duration of the project
The date of commencement of the project: _______ year _______ month _______ day
The date of completion of the project: _______ year _______ month _______ day
Fifth, the quality of the requirement strong>
According to the Ministry of Construction industry standard JGJ73-91 "building decoration project construction acceptance specification" provisions, and the province, the municipal construction commission, the fire department standards, the quality of the project to reach the city excellent. After the completion of the project, such as quality problems (after the completion of the use of Party A, except for quality problems caused by man), belonging to Party B's responsibility, Party B gratuitous warranty, warranty period of one year, life-long maintenance.
Six, payment
1, after the signing of the contract.
2, half of the progress of the project, Party A will pay Party B the total cost of the project.
3, after the completion of the project acceptance, Party A will pay Party B all the money.
Seven, the responsibility of both sides
1, Party A: responsible for providing the use of the entire project, design requirements; to provide the site to use the location of the water, electricity; to provide material transportation channels, the necessary material stacking site and the original building design drawings; the renovation project involves the location of the power distribution system, piping system, water supply and drainage valve should be responsible for the indication of the location; construction site should be level. The construction site should be leveled.
2, Party B: to Party A to provide engineering decoration construction design drawings and engineering quotations.
VIII, other matters
A and B agreed to make the following agreement:
1, the project in the event of special circumstances or force majeure can not be caused by the construction of the construction, the construction period can be postponed; such as the occurrence of a breach of contract for all the losses caused by the defaulting party to bear.
2, the project quote outside the project or project materials, technology, put the changes, need to be recognized by the Party comprehensive unit price, in the form of "on-site visa" signed by the person in charge of the site of the Party shall prevail, and included in the completion of the settlement of the additional. (If the project has occurred outside the project quotation or project materials, technology changes, Party A has recognized, but Party A did not visa, the costs incurred are equally valid.)
3, such as Party A or Party B breach of contract, and did not perform according to the contract, can be appealed to the higher authorities or arbitration institutions.
4. Other outstanding issues will be resolved by mutual agreement.
5, two copies of the contract, the two sides signed into effect, each holding a copy, and has the same legal effect.
Name of Party A:
(stamped)
_______ year _______ month _______ day
Name of Party B:
(stamped)_______ year _______ month _______ day
Maintenance contract model 2Party A:
Party B:
I. Party A agrees to entrust Party B with the maintenance of the house with a floor area of 117 square meters to Room No. 4 on the fourth floor of the first unit of the second dormitory in the courtyard of the Shashi Township Organs.
Second, the maintenance time _______ October National Day holiday, (1 - 7)
Third, the maintenance requirements: indoor walls are fully painted are flat and bright. Installation of wooden flooring 1 square meters / 165 yuan. Installation of kitchenware. Installation of lamps. Roof comprehensive replacement of feet long Zhang tile. After the completion of the maintenance of various types of furniture relocation and placement and health by Party B is responsible for.
Fourth, the total maintenance fee of 65,000 yuan, paid in three installments. The first payment of 22,000 yuan. That is, after the completion of wall painting to meet the quality requirements put forward by Party A. The second payment of 21,000 yuan. The second payment of 21,000 yuan. Room flooring installation is completed to meet the quality requirements. The third payment of 22,000 yuan. Fully completed, including furniture fully relocated and installed health.
Fifth, three stages of quality acceptance, found that a place does not meet the quality requirements, Party A requires a good rework, if you can not rework the place, Party A has the right to deduct the corresponding costs in the maintenance fee.
Six, after the contract is signed, if Party A repents and chooses another person to repair, is a breach of contract. Party A to pay the gold 1000 yuan to Party B. After the signing of the contract, if Party B repents not to repair on schedule or not undertake maintenance (due to the contracting of other engineering works), affecting the normal work and life of Party A, is a breach of contract, Party B to pay liquidated damages of 1,000 yuan to the Party.
VII, this contract by the A and B signed by both parties to take effect after consultation, the contract in triplicate, A and B each sign a copy of the guarantor Wang Fusheng to execute a copy.
Signature of Party A: __________
Signature of Lord B: __________
__________ year _____ month _____ day
Maintenance Contract Model 3Contractor: __________________ (hereinafter referred to as Party A)
Contractor: __________________ (hereinafter referred to as Party B)
In accordance with the provisions of the Contract Law of the People's Republic of China*** and the State of China, the Regulations on Quality Management of Construction Projects and other relevant laws and regulations, following the principles of equality, voluntariness, fairness and honesty and trustworthiness, with regard to the combination of the specific circumstances of the project, Party A and Party B sign this contract through **** the same consultation. Specific content is as follows:
I. Project location and content
1, project location:
2, project content:
(1) a workshop of the destruction (burned) part of the demolition, rust, corrosion and roofing panels of the system security. Note: a workshop area of 11000 square meters.
(2) Demolition of bad and rotten parts of the wall, antiseptic and wall panel making and installation.
(3) Installation of nylon screens.
Second, the cost of the project
(1) a workshop damaged part and wall burnt part
① rotten color steel tiles demolition _____ / M2.
② maintenance of the steel structure part of the descaling (according to the color steel tiles of the area of the 'calculation) _____ / M2 (including scaffolding, if the part of the replacement) (anti-corrosion, in accordance with this unit price)
③Anti-corrosion (calculated according to the area of the tile) _____ yuan / M2 (including scaffolding) if not replaced part of the anti-corrosion, in accordance with this unit price.
④ Newly made an purlin (C120 or 140)_____RMB or _____RMB/M.
⑤ Roof upper color steel tile (90 type, thickness is 0.65MM, using Baosteel or honest board)_____RMB/M2 (single layer price).
⑦ Inner layer UV. PVC anti-corrosion board (thickness of MM) _____ yuan/M2 (single layer price).
⑦ Hardware accessories used for roofing and wall panels (according to the tile area)_____RMB/M2.
(2) Nylon screen (40 mesh)_____RMB/M2 (including labor cost).
The above works are settled according to the actual party.
Third, the payment method:
1, the total cost of the project is RMB _____ whole (capitals:). The above example of the completion of the project and acceptance, Party A within 3 days before the day of payment to Party B of the total amount of the contract %, counting the RMB _____ yuan (capitals:), by the A and B negotiation, the rest of the money in _______ year _______ month _______ day before the full payment.
2. Party B is responsible for submitting the completion information to Party A. If Party A requests for a construction and safety invoice, it will be calculated at 5% of the total cost, and Party A is responsible for organizing acceptance.
Fourth, the duration of the project:
According to Party A's request to enter the site construction, but Party A must have construction conditions. The construction period is one working day, if rain or force majeure factors, the construction period will be postponed.
Fifth, quality standards
The project is accepted according to Party A's requirements.
Six, quality warranty period
one year. If there is a quality problem during the warranty period, it will be dealt with within 24 hours after receiving Party A's notice.
VII, A and B rights and obligations
1, Party A is responsible for the protection of the construction site leveling equipment to achieve the maintenance of construction conditions, and send professionals on-site supervision, free of charge, to provide Party B project water and electricity.
2, Party B site administrator and construction personnel to take care of their own food and lodging.
3, Party B is responsible for maintenance in accordance with the amount of work confirmed by the two sides, to ensure a one-time acceptance.
VIII, security responsibilities
1, Party B organizes its own staff on-site construction, Party B must be responsible for the staff's safety on and off duty and on-site work safety.
2, Party B must ensure safety and quality; if a safety accident occurs, Party B must bear the full amount, Party A is not responsible.
Nine, the responsibility for breach of contract
After the contract comes into force, Party A and Party B should follow the contract content to implement their respective rights and responsibilities. If there is a breach of contract, the defaulting party is fully responsible.
X. Other agreements
1, if there are other outstanding matters or agreements, A and B can be supplemented in writing, supplemental contracts or agreements and this contract has the same legal effect. In case of dispute, either party can sue to the local people's court.
2, the contract by the A and B parties signed and sealed immediately after the entry into force, the fulfillment of the automatic termination.
3, this contract in duplicate, Party A will execute a, Party B will execute one.
Party A:
Party B:
Date:
Maintenance Contract 4Party A:
Party B:
Based on the principle of friendly consultation between Party A and Party B on the principle of equality and mutual benefit, the two sides agreed to sign the contract and **** with compliance.
The first motor repair amount: eleven thousand one hundred and ten thousand six hundred and twenty rounds (11620 yuan) (see list)
The second quality
1. Motor repair quality standards
1.1 motor each effective number of turns is equal to the three-phase error is not greater than 2% with a double-arm bridge test.
1.2 Winding insulation should be good, according to the original insulation level of the motor winding.
1.3 Manufacturing process and materials in accordance with industry standards.
1.4 The repaired motor must have the specified winding markings.
1.5 The repaired motor must be issued with an experimental report and motor no-load report, marked with a detailed test run record and signed for confirmation.
1.6 The repaired motor is guaranteed to be undamaged for at least one year (except for non-quality reasons)
2. Rights and obligations of both parties
2.1 Strictly abide by the implementation of Party A's maintenance and assessment of the motor in Party A's construction or overhaul, and accept Party A's safety management.
2.2 Strictly implement the agreement and the relevant standards for motor maintenance, accept Party A on the repair before and after the quality inspection.
2.3 Party B guarantees to accept Party A's repair task at any time within 12 hours, and complete it according to Party A's stipulated time, without any reason for excuses.
2.4 Party B is responsible for free repair of damage caused by the quality of Party B's motor repair.
Article III contract price and settlement
1. Motor repair includes: winding line and related materials, labor costs, and motor matching motor leads, terminals, wire nose, internal rust.
2.4kw motor below 100 yuan per unit. 4kw motor above 28 yuan / KW. 6 pole motor above the total amount increased by 1.2 times. After the repair project is determined, Party B will collect the motor to be repaired from Party A's company and complete it within the specified time. Party B is responsible for sending it to Party A's company after repair. Party A pays Party B 90% of the repair amount in each quarter, and the remaining 10% is paid in one month without quality problems.
Article IV breach of contract:
Party B must comply with Party A's relevant discipline and safety management in the construction. If there are other matters the two sides should be resolved through consultation, consultation can not be litigated to the People's Court.
Article V of this contract a try four copies of Party A three copies of Party B a signed and sealed by both parties to take effect.
Party A: Division B:
Legal representative: Legal representative:
Entrusted agent: Entrusted agent:
_______ _______ _______ _______ _______ _______ _______ _______ _______ _______
Maintenance contract model 5Party A: Party B:
By the A and B parties in the spirit of mutual benefit and reciprocity, the principle of responsibility *** share, after careful consultation reached the following agreement *** with the observance of:
I. Party A entrusted Party B to repair the project:
Second, the total amount of the project: the calculation shall prevail).
Third, the payment process:
A kind - after the contract came into effect, Party A prepaid to Party B after the progress of the project over half, the second prepayment, the balance of the project after completion and acceptance of the settlement (5% of the total price of the project reserved as a guarantee of quality of the project, half a year after the payment).
B kind - general engineering first construction after payment, this project by way of payment.
Fourth, A and B negotiated construction time: _______.
V. For the safe and smooth conduct of the maintenance works, Party A shall assist Party B:
1. Provide the necessary water, electricity and other facilities and other conveniences.
2, to provide a safe place to store tools and construction materials.
Six, Party B for the operation and interests of Party A, construction to do:
1, according to Party A security system in and out of the construction area.
2, the operation schedule does not affect the normal business of the party.
VII. Acceptance criteria and methods: refer to the acceptance specification for building construction to be determined.
VIII, after the acceptance of the project, Party A shall unconditionally pay all the price of maintenance works.
IX, liability for breach of contract:
1, in the validity of the contract, either party shall not arbitrarily terminate the contract without the consent of the other party.
2, penalties: any party because of breach of contract caused by the other party's economic losses, must be compensated.
X. The contract is not exhaustive, the two sides will be supplemented after consultation.
XI, the contract in duplicate, A, B, each party to take one, signed and sealed after the entry into force, filed for inspection.
Party A unit: Party B unit:
Party A's representative: Party B's representative:
_______ year _______ month _______ day