The team is the most basic organization at the construction site, and construction safety accidents often occur in the scaffolding team. Therefore, what should you pay attention to when signing a shelf worker labor contract? The following is the shelf worker labor contract contract I compiled for you. Thank you for reading.
Scaffolding Labor Service Contract 1
Contractor: ____________________ (hereinafter referred to as Party A)
Contractor: ____________________ (hereinafter referred to as Party B)
p>
Based on production needs, Party A contracts the construction of the scaffolding sub-projects of this project to Party B. In order to clarify the responsibilities and obligations of both parties, after negotiation between the two parties, the following agreement is signed for execution by both parties.
1. Contracting method: cleaning work included
2. Price included:
Calculated based on building area above ±0.000: Yuan per square meter.
4. Work content:
Basement construction racks, foundation pit safety fences, facility site enclosures, main structure external scaffolding, unloading platform hoisting or landing platform installation, four-port protection , Scaffolding with wall steel bars tied, temporary facility protective sheds, scaffolding board laying, safety net enclosure hanging, overturning, dismantling, shelf connectors pre-embedded, scaffolding steel pipe painting, on-site transportation, tower crane and construction elevator lifting and dismantling cooperation, The dismantled scaffolding materials should be piled up neatly in designated locations, and clearing should be done well, and portable tools should be prepared. During the construction process, Party A's rules and regulations and quality and progress requirements should be followed, and work coordination should be done well.
5. Quality requirements:
1. The exterior scaffolding sub-project must meet the relevant standards of Beijing and the standardized acceptance standards of the Municipal Safety Supervision Station.
2. If the installation does not meet the standard requirements, it must be reworked and rebuilt at Party B's expense. If it cannot keep up with the construction needs or delays, Party A will impose a fine of RMB 100 per day on Party B and arrange for additional personnel to repair it.
3. Party B should do a good job in quality technical communication and quality management within the team, and obey the unified command, quality supervision and command of the on-site management personnel.
6. Safety production and civilized construction requirements:
1. Party A shall follow the construction plan and construction safety technical operating procedures of this project. Make safety briefings to Party B and be responsible for implementing and supervising the work. If Party B operates in violation of regulations and performs construction without authorization, Party B will be held responsible for any casualties. In the event of other accidents, if the medical expenses are within RMB, Party B shall be responsible for them; if the medical expenses are beyond RMB, Party A shall bear Party B, and Party B shall bear Party B's expenses and bear at least RMB.
2. Party A shall regularly supervise and inspect various protective measures for safe production to ensure safe production. Party B shall establish a safety assurance system and strictly abide by the rules and regulations of the state and relevant departments. Without education, Party B shall They are not allowed to work for construction. They must implement the rules and regulations of this project department and sign a safety responsibility letter. They must conduct quality and safety briefings before work and keep good records. Any violations of safe production and civilized construction will be punished financially. Party B is responsible for the costs of applying for a temporary residence permit, employment permit, etc.
3. The staffing procedures should be complete, and "three noes" personnel are not allowed to be recruited. Operators must hold valid employment certificates, wear safety belts when working at heights, and use personal protective equipment correctly. During the construction process Party B must implement the "three inspections" system. Party A's quality officer and safety officer are responsible for quality and safety inspection, acceptance, and strict acceptance procedures within the contract scope.
4. Party B should do a good job in civilized construction at the construction site, keep the materials pile neatly, and clean up the site after the work is completed. And do a good job in cleaning and sanitation of the living area.
5. Party B will not arrange accommodation for the family members and children of Party B’s construction personnel. In case of special circumstances, the project department must obtain permission and provide safety education to the family members. Children should be closely supervised by family members. Party B will be responsible for any accidents. Party B will be responsible for accommodation issues during the construction period.
6. If Party B encounters conflicts during construction, he should report them to the person in charge of the site in a timely manner. Seek solutions through discussion, and it is strictly prohibited to gather people to fight. If a fight occurs at the construction site, a fine of RMB 100,000 will be imposed each time regardless of whether it is justified or not. Any violation of the law will be sent to the public security organs for handling. The project department will not bear any costs.
7. All personnel entering the construction site should go to the project department to get their badges, which must be worn while working. The team leader appointed by Party B’s contractor must be on site every day and should take leave if necessary.
7. Payment method:
Party B shall pay a deposit of RMB yuan when entering the site as a deposit for project quality, progress, safety, public security and civilized construction. After Party B enters the site, Party A will pay living expenses of RMB 1 per person per month, including RMB 1 per person per month in cash. After the workload completed by Party B is verified and signed by the warehouse, safety officer, quality inspector, foreman, and project manager, the main structure will be capped and exited. % will be paid in advance, and the balance will be paid in full the month after the structure caps (at the end of ______ year).
8. Others:
1. If Party B encounters any of the following circumstances, Party A has the right to order Party B to leave the site, terminate the contract, confiscate the deposit, and settle the bill based on 80% of the completed project quantity. The remaining 20% ??will be used as a start-up fee for subsequent teams.
A. Automatically exit midway.
B. Do not obey the management of the project department and have poor coordination among types of work.
C. The quality of each acceptance cannot meet the required standards.
D. Serious violation of public security management regulations.
2. The construction workers participating in Party B are strictly prohibited from using electricity or open fire to cook in the dormitory, or pulling and connecting wires without permission. The equipment will be confiscated upon investigation.
3. Party B must perform regular maintenance on the tools and mechanical equipment provided by Party A. Party A will be responsible for repairing natural damage, and Party B will be responsible for compensation and repair for man-made damage or loss.
9. This contract is made in two copies, with each party holding one copy. It will take effect after being signed by both parties. It will expire after the payment is cleared.
Party A: Party B:
Year, month, day, year, month, day
Shelves labor service contract 2
Party A:
p>Party B:
According to the construction needs, Party A will subcontract the project to Party B for construction. In order to facilitate the cross-management of construction operations between teams, clarify the rights, responsibilities, and obligations of both parties during the performance of the contract, ensure the construction quality of sub-projects, strengthen the control of construction progress, and ensure the safe and smooth progress of the project, this agreement was entered into after mutual negotiation by both parties. The following contract shall be abided by by both parties.
1. Project name:
2. Project location:
3. Contract scope:
All construction within the scope of the construction drawings Content, that is, all shelf projects in this project. All drawing changes and technical changes during the construction process (including before construction) are included in the contract scope.
4. Project content:
1. Indoor protective frame, outdoor operating frame, protective frame;
2. Installation of safety signs for frame materials;
3. The erection, maintenance, repair, dismantling, cleaning, transfer, and stacking of all rack materials;
4. Corridors, passages, and construction road protective frames;
5. Party B is responsible for the safety helmets, safety belts and other labor protection supplies used by the erectors;
6. The main body of the exterior wall protection and the decorative double-row outer frame;
7. Building The "Four Ports" and "Five Borders" erection and dismantling;
8. Erection, dismantling, maintenance, on-site transportation, cleaning, and stacking of rack materials;
9. Party B Responsible for the safe operation certificate of the special operations personnel;
10. Erection and disassembly of the shear wall vertical reinforcement support frame and external scaffolding around the pit, and the erection and disassembly of the pit edge protection;
11. Set up and dismantle the main body of the lifting and unloading platform once and decorate it once, with no less than 3 pieces per layer each time;
12. Hang safety dense mesh on the outer frame and hard protection on the first floor , hanging safety pocket nets and layer-by-layer hard protection;
13. Installation and disassembly of indoor stair protection frames, and repeated installation and disassembly of protection;
5. Project contracting method:
1. The construction of this project adopts the form of contracting labor but not materials (that is, including labor, quality, schedule, safety, civilized construction, and material saving.) The hand tools used by Party B and Party B is responsible for labor protection supplies such as safety helmets and safety belts.
2. Carry out construction according to the construction progress and Party A’s requirements.
6. Quality requirements:
1. Based on the current relevant national specifications or industry quality inspection and assessment standards, and be subject to inspection by Party A’s technical personnel and quality inspection personnel at any time.
2. During construction, Party B shall absolutely obey the supervision of Party A's supervisor. If the quality does not meet the specification requirements, the supervisor will require Party A to stop work for rectification, and Party B's demolition will affect Party A's construction, resulting in losses. shall be borne by Party B.
7. Construction Period:
Party B’s construction must meet the needs of flow operations, complete Party A’s progress plan on time, and shall not delay the construction progress of other teams due to its own reasons.
8. Payment method:
9. Responsibilities of both parties in project management:
A. Responsibilities of Party A
1. Provide projects in a timely manner All kinds of materials needed to ensure that construction requirements are met;
2. Responsible for coordinating and handling conflicts between various work teams at the construction site and other situations, and try to avoid rework and rework due to insufficient cooperation. For repairs, Party B must obey Party A's handling opinions;
3. Responsible for project quality follow-up inspection and quality supervision, and responsible for sub-project quality assessment and acceptance;
4. Provide construction water , electricity and night construction lighting;
5. Pay the project payment according to the progress agreed in the contract.
B. Party B’s Responsibilities
1. Before construction, you must be familiar with the drawings and make safety technical briefings to workers. All workers must be skilled workers, and special work operations must be carried out with certificates. Abide by laws and regulations and management regulations of Party A, obey the instructions of Party A’s construction management personnel, and shall not embarrass Party A’s personnel for any reason;
2. Workers must provide the required documents when entering the site (ID card, special operation certificate, etc.), the expenses incurred shall be borne by Party B;
3. Make a material plan in advance according to the process requirements and submit it to the supervisor for approval;
4. On-site workers must abide by various on-site management rules and regulations, safe operating procedures and current laws and regulations;
5. Use materials rationally and are not allowed to cut at will without the consent of the foreman in charge. Violators will be deemed as Depending on the severity of the circumstances, a fine of more than 200 yuan will be imposed each time;
6. Coordinate the working procedures of the relevant teams in the flow operation, and shall not deliberately create difficulties;
7. Party B must abide by the regulations on safe production at the construction site Relevant regulations, organize construction in strict accordance with safety standards, and accept the supervision and inspection of Party A's management personnel and safety inspectors at any time. If Party B does not obey the instructions of Party A's personnel or violates the safe operation regulations, Party B will be responsible for all consequences; < /p>
8. Construction shall be carried out in strict accordance with national regulations. Party B’s workers must wear safety helmets, and safety belts must be hung up when working on external structures and at high altitudes, and when working at high altitudes. Safety belts must be hung high and low when working. It is strictly prohibited to hang low when working high. Safety fences and safety fences must be installed when working near the edges. Construction can only be carried out by 2 or more people.
It is strictly prohibited to operate the protective fence without doing a good job, and the safety responsibility of the construction shall be borne by Party B. Any safety accidents caused by Party B during the construction process shall be held by Party B;
9. Party B must send a dedicated person to track the entire process of the external scaffolding construction contracted by Party B. During the inspection, if it is found that the steel pipes and fasteners are not firm or the safety net is rotten and fallen off, it must be rectified immediately;
10. Party B contracts the final disassembly process of the scaffold. It is strictly prohibited to dismantle and throw it at high altitude, and it must be carried out according to the The construction method of removing one layer after each layer and then dismantling the second layer;
11. Party B’s workers are not allowed to wear slippers and hard-soled shoes during construction work, such as slippers and hard-soled shoes. For those who wear shoes, the company will impose a fine of 50 yuan per person;
12. The use of construction machinery must be strictly in accordance with the construction machinery usage specifications and operation accumulation, and a dedicated person must start the machine and hold a certificate to work. When temporarily replacing the start-up personnel, safety handover work must be done;
13. Party B must pay attention to maintenance of the large construction tools, machinery, etc. provided by Party A during use, and avoid improper operation and man-made damage. Party B shall be responsible for compensation, and Party B shall be responsible for any safety accidents that occur;
14. Party B’s construction personnel shall not take materials from the construction site at will. If found, Party B will be fined five times the amount of the materials used;
15. During the construction process, the instructions of Party A’s construction management personnel must be followed, and no illegal operations or forced construction are allowed; Party B must have sufficient safety measures for high-altitude operations, edge operations, and construction in dangerous areas, otherwise safety hazards may occur. Party B shall be solely responsible for the accident;
16. It is strictly prohibited to come to work after drinking, fights, drunkenness and theft are strictly prohibited. Serious cases will be transferred to the public security organs;
17. Children under 18 years old and senior citizens over 55 years old are not allowed to be used. People with heart disease, high blood pressure, disabled people, etc. are not allowed to enter the construction site;
18. Any agreement or contract signed between Party B and a third party in this project is Party B’s own responsibility and has nothing to do with Party A, and Party A will not recognize it;
19. If Party B leaves the site midway due to reasons (Including voluntarily withdrawing from the site, being named by the construction party’s supervisor, and being fired from the project department) Party A will only pay Party B 70% of the qualified project quantity completed by Party B;
20. During the construction process, the workers in this shift will Party B shall be solely responsible for all safety accidents (including third parties) caused by itself or in violation of regulations;
21. Party A strictly prohibits Party B from dismantling, modifying, or moving power distribution facilities without authorization, or from losing power distribution facilities. Party B shall be responsible for all consequences of acts and violations of safe electricity use;
22. Party A strictly prohibits Party B from dismantling, modifying, moving, and damaging safety protection facilities without authorization. Party B shall be responsible for all consequences of safe operation;
23. The person in charge of Party B must stick to the construction site, arrange work, command and manage, and lead his employees to ensure quality in accordance with Party A's requirements and relevant construction operation safety regulations. , Guaranteed quantity and carried out construction according to schedule requirements. All losses and adverse social impacts caused by poor management or dereliction of duty will be borne by the person in charge of Party B. If there is no improvement after three times of pointing out the problem, Party A has the right to terminate the agreement and the remaining project payment will not be settled.
10. Project changes:
If the construction items are added or the construction content changes significantly due to changes in drawings, the cost increases significantly, and the original contract terms cannot be expressed, a supplementary agreement should be negotiated and signed.
11. Warranty responsibility:
During the warranty period, if Party A notifies Party B that no rectification will be made within a limited time, Party A will send another person to perform warranty work, and the cost will be included in the warranty deposit. deduct.
This Agreement is made in two copies, with each party holding one copy, and shall come into effect on the date of signing.
Party A: Party B (Construction Responsible Party):
Signing Place:
Signing Date:
Scaffolding Labor Contract 3
Party A:
Party B:
In order to complete the project construction faster and better to ensure the quality, safety and progress of the project, in the spirit of equal consultation In principle, the relevant specific matters have been agreed upon by Party A and Party B as follows:
1. Contract Scope
Party A will contract the main project of Building C05 of Bangsheng Phoenix City , design drawings, drawing review and small design changes (scope), all shelf engineering construction work, and supporting subcontracting tasks such as water and electricity, weak current, fire protection, elevator construction and other types of work are contracted to Party B. The specific contents are as follows: p>
1. Contracting method: Contracting work but not materials, all tools of Party B (including safety helmet, safety belt, raincoat, rain boots, gloves, mask, work badge, hoist, etc.)
2 , Type of work content
(1) According to the main building in the construction drawings, all the double-row steel pipe scaffolding on the exterior walls of the annex building and the cantilevered double-row steel pipe scaffolding in the basement at the landing point of the outer frame (including the elevator shaft full hall scaffolding (for building walls, safety passages, protective sheds, etc.), single-row lighting shafts and "four-port, five-side" steel pipe safety enclosure erection and disassembly construction, public-beam steel fixing, tower crane lifting sections, operating platform erection and disassembly, etc.
(2) , elevator shaft door, construction elevator and material hoist discharge port and aisle platform protective door (installation included), construction elevator and material hoist under-base reinforcement;
(3) Set up safety nets on the outer frame, pocket nets, internal and external horizontal protection, floor reserved hole coverage, construction safety passages (stairs), front protection, safety protection ramps, and protection in accordance with the requirements of the specifications. Sheds, steel processing sheds, loading and unloading platforms, etc.;
(4) On-site transportation of turnover materials (horizontal transportation, vertical transportation), on-site organization, cleaning of scattered materials, etc.;
(5), Modification of exterior decoration, erection and dismantling of overhead floors and outer frames of turrets
(6), Installation of cantilever steel and rigid connection points of outer frames, I-beam welding and dismantling, reservation and dismantling of embedded parts;
(7) Party B is responsible for the protective outer frame and scissor braces;
(8) , pipe racks, fasteners, Bamboo frame boards and other materials are brought into the site and are responsible for setting steel wires and hooks;
2. Contracting method and unit price:
1. According to the principle of contracting, Building C05 and the annex building are constructed according to the company’s blueprint. The standard area is calculated, and the comprehensive price is RMB/m; the price of the secondary erection of the outer frame and edge protection is RMB/m? (the area is calculated based on the standard area on the company's blueprint × how many layers).
3. On-site horizontal transportation and vertical transportation of turnover materials (there is a tower crane on site) (no matter how high the vertical transportation is or how far the horizontal transportation is). All work contents include on-site cleaning after each construction work, sorting and recycling of excess materials (excluding carpentry), safety reporting for erection work, quality acceptance (i.e. team self-inspection, inspection by professional inspectors), on-site civilized construction, etc. No matter how far the pump truck is transported, how the on-site construction conditions change, or whether the construction is difficult or not
1. Party B voluntarily pays a performance bond to Party A. If Party A notifies Party B to enter the site, Party B will be required to enter the site within 7 days. No entry deposit is required as liquidated damages.
2. If Party A does not stand up for Party B, the security deposit will be refunded plus double the compensation;
3. Return of the performance security deposit: it will be refunded when the subject reaches the maximum limit.
3. Liability for breach of contract
1. If Party B subcontracts the project or stops work midway or withdraws from the site without Party A’s consent, it will be deemed that Party B has breached the contract and Party A will pay Party B the amount already paid. Meal expenses and the remaining amounts will be regarded as liquidated damages and no settlement will be made.
2. If Party B does not have enough construction personnel and the project cannot be constructed according to the planned schedule, Party A has the right to unconditionally withdraw from Party B, or Party A will hire other personnel for construction, and Party B will be responsible for the costs.
3. If Party B breaches the contract, the deposit will not be refunded and will be used as progress compensation for the construction site.
4. Others
Matters not covered in this contract shall be negotiated by both parties. This contract is made in two copies, with Party A and Party B each holding one copy. Both parties shall sign and take effect, and the payment for the completion of the project shall be paid. Invalid after clearing.
Party A: Party B:
Telephone: Telephone:
Year, Month, Day
3 related articles on Shelf Worker Labor Contract:
★ Samples of scaffolding labor subcontracts (2)
★ 3 latest construction labor contract templates
★ 3 project labor contract templates< /p>
★ 3 latest scaffolding construction contract contracts
★ Small high-rise scaffolding contract contract template (3)
★ 3 construction project labor general contracting contracts
p>
★ 5 contracts about labor construction
★ Shelf work team contract contract
★ Shelf work team contract format
★ Labor 5 project contract templates