Engineering design fee charging standard?

The following is the Zhongda consulting to bring you about the engineering design fee charging standard content for reference.

I, engineering design fee standard is the engineering design unit and commissioned task unit to sign a contract, fulfill the contract to collect design fees based on.

The second, this fee standard by the state council department in charge of survey and design organization of the state council departments concerned to prepare, by the state price bureau in conjunction with the state council department in charge of survey and design approved the issuance. Engineering design unit to undertake the task of the nature of the project, respectively, the implementation of this standard in the relevant industry charges. Each construction unit, work design unit, design review department and construction bank and other units should be mastered accordingly and supervise the implementation.

Three, this fee standard *** divided into three volumes. The first volume includes: petroleum, iron and steel, gold, non-ferrous metallurgy, building materials, machinery, chemical and petrochemical, medicine, textiles, light industry, transportation, radio and television, commerce, food, forestry, civil construction, municipal, water conservancy and hydropower, human defense, railway and other twenty-one industries; the second volume includes: nuclear industry, aviation, electronics, weapons, ships, space and other six industries (84 years of the book); the third volume is the "engineering survey, Engineering Design Fee Work Day Quota" trial version, including coal, electric power, post and telecommunications three industries.

Four, this fee is in the former State Planning Commission in 84 years, 85 years issued on the basis of the fee standard, the fixed charges in the unreasonable part of the revised version of the adjustment, still reflects the principle of low fees. That is to say, this fee is based on the comprehensive design capacity of the engineering design units of various industries and based on the expenditure level of the utility fee system for calculation, while taking into account the necessary technology development, business construction, personnel training and other costs required, as well as the industrial and commercial taxes that must be paid.

Fifth, the tariffs to the physical fixed charges, supplemented by a single project estimates for the calculation of the basis of the charges, in addition to coal, electricity, post and telecommunications three industries on a trial basis for the fixed charges for the work day.

Six, the main content of the tariff:

1. engineering design fees: generally include preliminary design and budget estimates, construction drawings, according to the contract with the construction, design and technical submission, participate in the commissioning and acceptance of the completion of the project, and other work costs. This fee does not include the cost of doing construction budget.

2. Preliminary design before the work of fees: is the preparation of feasibility study reports, on behalf of the design task book, to participate in site selection and planning, environmental pre-evaluation and other work required fees.

3. Non-standard equipment design fees: refers to the design of non-stereotyped equipment. Some industry engineering design itself includes equipment design, not another non-standard equipment design fees. Because of the different characteristics of the industry, the scope of non-standard equipment design, by the industry to make separate provisions.

4. Software preparation costs: refers to the factory production process computer control programs and other preparation costs. Industry has a software preparation fees, the implementation of industry standards; industry does not have standards, according to the value of the use of software, the degree of sophistication, and take into account the preparation of the actual workload of the software agreed by the two sides. In addition to the above work other than work, such as separate technical information, drawings, translations, electrical calculations, etc., the charges by the competent department or engineering design unit to develop a separate standard.

Seven, if only commissioned to do process design or civil and public works design, according to the industry division of the design workload in proportion to the calculation of fees. Only commissioned to do preliminary design or construction drawings design, according to the industry division of the proportion of the design workload and multiplied by a factor of 1.1 to calculate the charges. If the preparation of the construction drawing budget is added, the fee is calculated by multiplying the engineering design fee by a factor of 1.1. The engineering design fee in this fee standard is considered according to the design of new projects, if it is an expansion project, except for the industry has clear regulations, it can be charged according to the same kind of new projects multiplied by a factor of 1.1; technical transformation projects, according to the complexity of the design technology, it can be multiplied by a factor of 1.2-1.4 to calculate the fee. Projects that require seismic defense, calculated by the quota, according to the increase in design workload, can be multiplied by a factor not exceeding 1.2.

VIII, engineering design units to provide design documents, must comply with the depth and quality standards set by the state and the competent authorities to provide the number of copies in accordance with the provisions of the implementation of the industry, the commissioning unit to request an increase in the number of copies of the sun printing labor costs.

Nine, engineering design using standard design (except for standard components map), reuse design, according to the same type of new design projects, 20% of the charges. Need to match the foundation or local conditions to make local modifications, according to the same type of new design projects, 30% of the charges. Non-standard equipment design reuse, since the completion of the design of the year after the beginning of the annual reduction of 20% charge, after the reduction of the charge is less than the cost of drawings, can be charged according to the standard drawings and information charges.

Ten, engineering and technical consulting services, to participate in planning surveys, inquiries, quotations, external negotiations and other technical services, as well as the work of not formulating a specific fee, can be used to calculate the fee according to the direct production of man-days, the fee standard is 85 yuan per workday. Calculation of man-days can be carried out on the basis of man-days quota or negotiated between the designer and the commissioner at the time of signing the contract according to the task. Need to travel to the outskirts of the task, the duration of sixty days or less, the travel costs borne by the commissioning unit.

Eleven, according to undertake the design task of a single project estimates for the basis of fees, the calculation of the base should be deducted from the cost of temporary works, construction technology and equipment costs and construction machinery purchase costs, to join the joint commissioning costs. The estimate of the single project shall be based on the preliminary design estimate approved by the competent department.

Twelve, with the introduction of equipment for the project, according to the estimated cost of a single project as the basis for fees, engineering design is borne entirely by us, the design fee, the price of the equipment should be calculated according to the price of similar equipment. If there is no reference price in China, the original price of the equipment shall be calculated by converting it into RMB according to the national license price. There is the introduction of equipment, according to the estimated cost of a single project based on the project, if the process design undertaken by foreign countries, the calculation base should not include the price of process equipment; according to the physical fixed fee, should be divided into the design workload according to the industry as a proportion of the corresponding design fees deducted. Domestic corresponding process design with the work of the charges, can be designed and commissioned by the actual workload negotiation to determine.

Thirteen, such as the need for international design procedures and depth of the design of domestic projects, because of more than the current domestic design depth, may be appropriate to increase the design fees, specifically according to the actual increase in the workload, determined by the designer and the commissioning party negotiations.

Fourteenth, when undertaking design tasks in remote areas such as Xinjiang, if the charge is calculated according to the fixed amount, the original fixed amount can be multiplied by a factor of 1.1, and the task of undertaking tasks in Tibet can be multiplied by a factor of 1.2 according to the original fixed amount.

Fifteen, engineering design units due to the needs of the task undertaken by the need to go abroad, in addition to the cost of production and installation by the design unit to pay, other costs abroad (including foreign exchange amount) should be paid by the commissioning unit, such as the design unit itself in order to improve the level of reasons such as studying abroad, study, the cost of its overseas by the design unit to take care of their own.

After the engineering design unit undertakes the task, if scientific tests are required for the project, the equipment, materials and labor costs shall be the responsibility of the commissioning unit.

Sixteen, this fee takes into account a variety of factors affecting the design of the workload adjustment factor, if more than two factors in the same project at the same time, the project by the total adjustment factor should be the single adjustment factor after the decimal point of the number of digits of the sum and then add 1, but the total adjustment factor shall not be greater than the maximum value of 1.5. In-kind or working day fixed design fee, where the investment of more than 300 million yuan of projects, the fee shall not be the maximum value of 1.5. For projects with an investment of more than 300 million yuan, the maximum fee shall not be greater than 1.5% of the proportion of the proposed budget.

Seventeen, engineering design units in the design of advanced technology, and have better economic efficiency, confirmed by the design review, can be higher competent review department decided to increase the design fee, generally controlled within 10% of the design fee. If the design quality and technical level fail to meet the contract requirements, the design fee shall be deducted according to the contract.

Eighteen, the design fee according to the design progress in installments. After the design contract comes into effect, the commissioning party shall pay twenty percent of the design fee to the design unit in advance as a deposit; thirty percent after the completion of the preliminary design; fifty percent after the completion of the construction drawings. According to the "construction engineering survey and design contract regulations", the design contract fulfillment, deposit against the design fee. After the design fee is paid, the design unit of the design task of the construction project should be coordinated with the construction, to participate in the test test and acceptance of the completion of the project, etc., should not be charged for technical services and travel expenses.

Nineteen, this fee applies to the design unit above the municipal design unit to undertake domestic investment in construction projects design fees, counties and counties below the design unit, to undertake the design task, according to this fee multiplied by the coefficient of 0.85-0.9 billing. Engineering design charges for special economic zones (except for national key construction projects and investment projects within the state budget) may be market-adjusted and negotiated between the design unit and the commissioning unit. Design charges for foreign-funded and Sino-foreign joint venture construction projects, can refer to the relevant design charges abroad, by the designer and the commissioning party **** with the negotiation to determine.

Twentieth, the charges are not included in the project, the design charges by the design unit and the commissioning unit with reference to the negotiation to determine the charges.