Purpose:
In order to ensure the normal life of the tenants, the work order of the operation and the safety of life and property, to ensure that the normal operation of the equipment, so that the buildings and facilities and equipment in the summer safe flood control
Scope of Application:
Projects under the company's jurisdictionSupervision and implementation:
Project manager (duty manager during the second working hours)
Responsibilities:
The project's property department, engineering and technology department, and security department are responsible for the supervision and implementation of the project. strong> Flood emergency procedures:
I. Flood control organizational procedures
1, in the flood season before the arrival of the establishment of the flood control team, the project manager as team leader, the head of the Engineering Department as deputy team leader, the team members of the security department supervisor, the head of the Department of Property and the manager of the duty;
2, in the case of danger, the project manager is responsible for the material and manpower deployment, the head of the engineering department is responsible for the security department supervisor, the property department supervisor, and the duty manager;
2, in the case of dangerous situations, the project manager is responsible for the material and manpower In the event of a dangerous situation, the project manager is responsible for material and human resources deployment, the director of the Engineering Department is responsible for on-site command, customer service center manager, security manager is responsible for the deployment of the Department of personnel to cooperate with the rescue and relief. Danger occurs at night and on weekends, the duty manager is temporarily responsible for command, and timely notification of other members of the flood control team to the scene.
Second, the flood engineering department flood control measures
1, the establishment of a special storage library for flood control equipment, storage of flood control equipment, the main should be a number of submersible pumps, drainage hoses, waterproof switchboard, woven bags, sand, shovels, etc.;
2, the key to the flood control equipment library should be in the Department of Security, Engineering and Technology Department, the Ministry of the project each stored a;
3, flood season Before the arrival of the engineering department maintenance personnel and security patrol personnel should be carefully inspected
(1) whether the roof platform drains are unobstructed, and at the same time will be the roof of the garbage removal clean;
(2) check the underground puddles of sewage pumps are sensitive and effective, and will be placed in the control of the "automatic" position;
(3) check the underground puddles of sewage pumps are sensitive and effective, and will control the "automatic" position;
(4) check the power distribution room, central control room and other important rooms whether there is a leakage of rain, and if there is an occurrence of the case should be dealt with in a timely manner.
Third, the risk of handling procedures
1, if the rainwater into the underground equipment room, the Ministry of Engineering staff should start the sewage pump drainage in a timely manner, and sandbags to block the door of the room to protect a variety of important equipment. At night and on double holidays, the duty manager, on the one hand, to organize personnel to rescue, on the one hand, immediately notify the project manager and other members of the flood control team;
2, security personnel by the security department manager command, a part of the personnel to maintain order, a part of the personnel to assist the Ministry of Engineering to remove the danger, rescue equipment;
3, the Ministry of property personnel to remove the various parts of the standing water;
4, the danger of After the occurrence of a comprehensive inspection, statistics on the damage caused by the flood and material consumption, and timely replenishment of flood control materials, ready for the next flood control;
5, the incident handling process should be recorded in detail, by the project manager to the leadership of the company to make a report.
Rain Warning Emergency Plan 2
First, the purpose
In order to protect the life and safety of workers, to ensure that when the rainy season flood season comes, to ensure the safety of life and property of the project personnel, to protect the normal construction of the construction site, to control the damage to a minimum, according to the national, provincial, municipal and county documents on flood control, and for this purpose to develop the "Sichuan Hangjian Foxconn employees protective housing (a) the fourth section of the project project department rainy season flood emergency plan.
Second, the organization
Sichuan Hangjian Foxconn employees protective housing (a) the fourth section of the Ministry of the rainy season flood emergency leading group:
Leader:
Deputy Leader:
Members:
Sichuan Hangjian Foxconn employees protective housing (a) the fourth section of the Ministry of the Ministry of the rainy season flood emergency leading group. ) The leading group of rainy season flood control and emergency rescue of the project department of the fourth section of the project is located in the project office.
Third-party rescue contact: first aid telephone 120, alarm telephone 110, fire telephone 119.
Third, the basic principles
Flood control work adhere to the "safety first, unremitting, preventing the main, all-out rescue" principle. The policy, actively formulate and implement flood control planning, strengthen drainage measures, scaffolding reinforcement and electrical equipment management inspection, strengthen the collection of weather forecasts, so as to prevent accidents before they occur.
1, (Liu Zhi) is responsible for site guidance, and do a good job of coordination with various departments.
2, (Dong Lei), (Yu Heng), (Lin Xiaochun) is responsible for tracking and checking the construction and finished product protection of each work surface.
3, (Wang Lizhong) is responsible for the safety management of the construction site, and do a good job in the rain and summer construction safety education.
4, (Yan Bing) is responsible for the site of the reasonable stacking of materials, rain and moisture, all kinds of machinery and equipment maintenance, and do a good job in the preparation of flood control equipment.
5, (Zhang Chengyi) is responsible for the temporary electricity, equipment and machinery insulation checks to prevent the wire broken skin, leakage, etc..
Fourth, the preparation of materials:
According to the specific circumstances of the project, prepare the equipment and materials used in flood control. Prepare pumps, water pipes, tarpaulins, shovels, etc., the equipment required for rain prevention should be prepared sufficiently, the required equipment must be maintained in good condition.
No. Material name Unit Quantity Remarks
Rain warning emergency plan3I. General
Flood season is approaching, according to the requirements of the documents issued by the company's headquarters, adhere to the "safety first, prevention first; prevention is better than cure" principle, to ensure that the project during the rainy season safe construction. Ensure that the project during the rainy season safety construction, and according to the specific conditions of the local Wulagai, the preparation of the "rainy season three defense" emergency plan.
Second, the emergency plan leading group organization and division of labor
Strategy
Third, the emergency plan to prepare for the work and organization and management:
1, the organization of the construction unit for the construction site construction site comprehensive inspection, for the inspection of problems, to be implemented. Implemented to the person, and within 3 days to rectify the completion.
2, the organization of the construction unit to buy enough three prevention supplies.
3, the construction unit is required to set up three defense rescue team, the first time in place in case of emergencies, rescue and relief work.
4, after receiving the warning signals from the Meteorological Bureau, higher administrative authorities or government departments, timely organization of relevant personnel to implement appropriate preventive measures.
5, three defense team members in the three defense cell phone is on 24 hours a day during the state, to ensure smooth communication. And the strict implementation of the duty system, adhere to the 24-hour duty, and seriously do a good job handover and duty records. If there is an accident, "three defense" team members must be the first time to the scene, organizing rescue and relief work.
6, when the project encountered general flooding, first to ensure that production, life and normal operation. If encountered a major flood, immediately to the Division of "three defense" leading group report, by the group unified command rescue; leading group did not arrive, by the project emergency leading group unified command, all the commando received the order, 20 minutes must be rushed to the scene to gather, listen to the leadership of the command.
Fourth, three preventive accident emergency measures:
1, received the alarm, "three prevention" leading group should be timely notification of the construction site early warning information, the organization of the personnel in place, arrangements for protective measures, do a good job of water drainage, lightning, personnel to avoid danger, etc., to protect the good Personal life and property.
2, strengthen the office area, living area, operating area of the safety inspection and check, organize the evacuation of people and materials in dangerous areas and evacuation work, and do a good job in logistics and life support, emergency rescue preparations.
3, such as the emergence of personnel injuries, first rescue the injured, and notify the person in charge.
4, and the local government departments in close contact with communication, such as the encounter of special circumstances, and seek the assistance of the local government in order to reduce casualties and property losses.
Fifth, the preparation of equipment and materials during the three prevention:
Flood sandbags, raincoats, rubber boots, flashlights, shovels, submersible pumps, fire extinguishers, drainpipes, commonly used medicines, disinfectants, first-aid items (bandages, sterile dressings) and a variety of commonly used small splints, stretchers, ropes and other emergency supplies.
Sixth, the rainy season, "three defense" work, to be unremitting.
Responsibility for the implementation of people, do not spare a trace of the existence of hidden safety hazards in the parts, for the key parts, key work, to strengthen the management, never allow problems. Ensure the safety, quality and progress of the project during the rainy season construction period.
Rain Warning Emergency Plan 4Flood season rainy season is coming, in order to ensure the safety of the community and underground garage flooding, to ensure the safety of the owners of the vehicle parking, to ensure that the owners of the normal order of life, according to the spirit of the work at all levels of flood prevention and control and over the years on the work of the flood prevention and control of the requirements of the combination of the actual situation of the xx community, especially the development of flood control work emergency plan. We hope that the supervisors of our xx management office can perform their duties, give full play to the leadership of the supervisors, and lead the staff of all departments to do their best to do a good job in the flood control period.
First, the establishment of flood control work emergency leading group
Group leader:
Group members:
The rescue team: the management of the management of all departments in charge of the office, office staff, engineering and maintenance personnel, all the security personnel
Second, the flood control work responsibilities
1, conscientiously implement the implementation of the city, the district property on flood control and drainage of the spirit of the instructions, the overall command of the xx community flood control work. In accordance with the emergency leadership group of personnel arrangements, rapid, timely and effective disposal of xx community flood control work in all types of sudden disasters and accidents. Take effective measures, based on the neighborhood, adhere to the self-protection, self-help, to ensure the safety of the neighborhood flood season.
2, prepare enough flood control materials, according to the emergence of dangerous situations, proposed drainage, rescue programs. Responsible for checking and supervising the implementation of flood control measures; responsible for checking and supervising the preparation of flood control items; to ensure the normal order of life and property safety of owners, to put an end to the poor drainage of the sunken areas of the district and the basement water storage and other issues.
Third, flood control requirements and measures
1, the establishment of the leading group of flood control and rescue team. Specifically responsible for flood control in the area, to ensure the safety of floods and owners of property without loss; timely collection of rain, floods and other information; do a good job of flood control publicity to raise the awareness of all owners of flood control; to ensure that no accidents occur. During the flood control period to ensure smooth communication, flood control members and duty personnel to do 24-hour phone. Duty personnel should stick to their posts, and are strictly prohibited from leaving their posts and taking off work. In case of heavy rain, the manager and all levels of supervisors, security team leader must be on duty, the office staff to do cell phone is not turned off.
2, the establishment of security responsibility system. Management office leaders will be specific work distribution in place, so that each area has a direct responsibility. Can not be on time to the post personnel and not seriously responsible for losses caused by the implementation of accountability, resulting in significant losses to be held accountable.
3, contact work. Security department should have car owners to carry out regular security tips, and do a good job in the basement vehicle parking order. Customer service personnel should know, all underground garage owners communication contact, notify the owners when necessary, with good security evacuation work. In the event of a particularly heavy rainstorm, should pay close attention to the rain situation and the smoothness of the relevant roads in the district, and do a good job of contacting all owners of the preparatory work.
4, material preparation and the specific duties of each department. According to the actual situation of the xx district, the key parts to strengthen the patrol; clear division of labor in all departments; to do before the rain, rain, rain, there are people responsible for monitoring; and make the appropriate measures to eliminate risks; the following is a clear division of labor and responsibilities of the various departments:
Ministry of Finance: make every effort to protect the Ministry of Finance of the life, property safety. If there are special circumstances need to immediately report to the higher authorities. Self-protection at the same time, to assist other departments to do a good job of disaster relief.
Public **** Division: When the flood comes, the customer service center should do a good job and all the owners of the warm tips between the work of the disaster is relatively serious several floors, to focus on recording the flood information, if necessary, notify the owners by phone to inform the details. If there is a call for help from the owner, a detailed record of the owner's address (floor number, unit number, room number, contact information) should be made, and immediately reported to the higher authorities to apply for reinforcements.
Greening and Cleaning Department: Fully do the protection of green vegetation during the flood season and district cleaning work. In bad weather, take relevant measures to protect the growth of plants and trees. After the rain, do a good job of community health cleaning work, so that every corner of the community to maintain hygiene and cleanliness at all times. Let live in the owners feel the environment of fresh nature, through our efforts to make the neighborhood owners live in a better environment. If there are owners of the house or warehouse water phenomenon, should cooperate with the Engineering Department to go immediately to help owners to do a good job of cleaning and drainage work.
Engineering Department: Engineering staff should regularly check the water and electrical equipment in the district, flood season to appropriately increase the frequency of inspection to ensure the normal use of equipment and safety. Check the smoothness of each drainage pipe and emergency use. Rescue materials in case of danger include:
1) Emergency lamps and lanterns should be sufficiently charged for nighttime use.
2) a number of sandbags, sandbags placed in the lower terrain of the entrance place, can play a role in intercepting the flow, to avoid the upstream rainwater pooling to the lower ground area, causing danger. Several floors in the area that are prone to waterlogging are A1, A3, A5, C1 and several other places to pay close attention to the waterlogging situation. Immediately after the end of the disaster, the sandbags should be moved away to a hidden area, and do a good job of protection, so as not to affect the next use.
3) Prepare 5 shovels and 5 steel bars with hooks to unblock the sewers if necessary, or directly open the sewer manhole cover, which can speed up the flow of rainwater into the sewers, and avoid the rainwater from rushing into the garage or warehouse with low ground. Immediately after the end of the disaster to place the well cover to the original place to avoid danger.
4) Drainage equipment, drainage pumps and drainpipes should be placed in a place that is easy to reach and easy to put, and regularly check the work of the equipment. In case of poor drainage of some pipes, the drainage pump should be used to drain the water from this area to other smooth areas. Clean it after use and store it.
Security Department: do a good job of flood safety and security, if there is a call for help or reinforcement, should be the first time to the scene, do a good job of rescue and defense, in case of special circumstances should be immediately reported to the higher authorities, in the critical moment to help the owners to solve the problem.
Fourth, according to different circumstances to start the corresponding plan
(a) the first plan:
When the weather station issued a rainstorm warning, the leading group of flood control work all in place. Summarize flood control information in a timely manner, inform the wind, water and rain. Office staff according to their respective duties, strengthen the duty, further check the implementation of various flood control emergency measures, the formation of flood control rescue teams, the implementation of emergency supplies.
(B) the second plan:
When the rainstorm hit or the relevant departments issued an emergency alert, the flood control leading group immediately convened an emergency flood control meeting or emergency deployment. Property Office to flood control as the top priority over all work.
(C) the third plan:
In case of torrential rains and sudden disaster weather, the rescue team quickly organize personnel to check and unblock the drainage pipes in a timely manner, so that the drainage is smooth; monitoring of the water inside the community and the basement, and timely report on the situation, and timely organization of sufficient temporary drainage equipment for strong drainage, if necessary. Ensure that owners of normal . Life order and property safety.
The above groups and departments should be conscientious, safe flood, to ensure that the owners of life and property and public **** the safety of property, the more critical the moment the more organized and disciplined we should be; the critical moment of righteousness and courage to be the first, not afraid of danger. Always put the interests of the owners in the first place. Let the leadership of the head office to rest assured that the owners are satisfied is our duty-bound responsibility.
rain warning contingency plan 5First, the rainy season construction general requirements
1, to ensure the smooth flow of information. Due to the uncertainty and suddenness of the rainy season construction storms and other inclement weather, it is difficult to predict the degree of damage, the need to strengthen the control and management of meteorological information, timely and effective security measures to strengthen prevention.
2, the comprehensiveness of the protection. Construction site involves a wide range, including all parts of the site and temporary facilities for the safety and security of all personnel, so in the development of security measures must be comprehensive, meticulous and considerate, not because of the small things and not to leave hidden dangers, bring losses.
3, scientific organization of construction. Preparation of the construction organization design to take full account of the characteristics of the construction of the rainy season, will not be suitable for the construction of the rainy season in advance or delayed arrangements for the project, to improve the process of interspersed, improve efficiency and construction speed, encountered a large stormy weather should be stopped construction.
4, rapid response to make emergency preparations for flood rescue and relief, construction in the rainy season, a variety of protective measures to be further strengthened. Ensure that rescue and relief materials and personnel in place, the occurrence of dangerous situations immediately start the emergency plan.
Second, the rainy season construction safety preparatory measures
1, reasonable arrangement of work and rest time. In case of large stormy weather should stop all the operators to withdraw to a safe place.
2, good site drainage.
(1) The construction site should be handled during the rainy season to prevent landslides, landslides and other disasters.
(2) to ensure that the road is smooth, the road surface according to the actual situation, respectively, hardened or paved gravel, slag or other materials, and according to the requirements of the height of the arch.
(3) raw materials, finished products, semi-finished products protection. Comprehensive regular inspection of the material warehouse, timely maintenance, good drainage around the wall base, solid, no leakage of rain seepage, steel and other materials stored in the corresponding rain measures to ensure the quality and safety of materials.
(4) Strictly according to the flood control requirements to set up continuous, smooth drainage facilities and emergency supplies, such as water pumps and related equipment, plastic sheeting, linoleum and other materials.
Third, the key sub-items of rainy season construction safety measures.
1, foundation works.
The foundation project is greatly affected by the rain, if you do not take relevant precautions, it may have a serious impact on the construction safety and quality of the building. Therefore, in the rainy season construction, pay attention to the following points:
(1) rainy season excavation trench (pit) or pipe trench, should pay attention to the slope stability. If necessary, the slope can be appropriately slowed down or set up support. Construction should be strengthened to check the slope and support control; for the excavated trench (pit) or pipe trench to set up support; being excavated to slow down the side of the main break supplemented by support; rain affects the larger stop construction.
(2) rainy construction work surface should not be too large, should be completed section by section, piece by piece of staging, rainfall, should stop the large area of earthwork; foundation dug to elevation, timely acceptance and pouring of concrete bedding; such as rain soaked foundation, should do the necessary excavation backfill and other restoration of the base load-bearing capacity of the work; important or special projects should be completed before the rainy season task.
2. Concrete works:
(1) The template isolation layer should keep abreast of the weather forecast before painting, in order to prevent the isolation layer from being washed away by the rain;
(2) Pouring of concrete should be stopped in the event of heavy rain, and the poured parts should be covered. Cast-in-place concrete should be based on the structural conditions and the possibility of more consideration of the retention of several construction joints;
(3) During the rainy period of construction, the determination of the water content of coarse and fine aggregates of concrete should be strengthened, and the amount of water used should be adjusted in a timely manner;
(4) Before pouring concrete on a large area, it is necessary to know the weather forecast for 2-3 days. Try to avoid heavy rain. Concrete pouring site to prepare a large number of rainproof materials, in case of pouring suddenly rain cover;
(5) template support under the backfill should be tamped, and add a good mat board, after the rain in a timely manner to check whether there is no subsidence;
(6) when it rains shall not be reinforcing welding, docking, etc., when urgently needed to do a good job of rainproof work or move the construction work indoors; just welded reinforcing steel joints Parts should be protected from rain watering, so as not to affect the quality of the building joints suddenly cooled brittle cracks.
3, hoisting project:
(1) components stacking place should be flat and solid, around the good drainage work, is strictly prohibited components stacking area of water, soaking, to prevent soil sticking to the pre-buried parts;
(2) tower crane roadbed, must be higher than the natural ground 15cm, is strictly prohibited from rain soaked roadbed;
(3) after the rain when hoisting, should be the first to check the stability of the crane itself, should be the first to check the stability of the crane itself, to avoid the sudden cooling of brittle cracks affect the quality of the building. Check the stability of the crane itself, confirm the safety of the crane itself is not damaged by the rain and then do a test hoisting, will be lifted to about 1m, back and forth up and down a few times to stabilize the hoisting work;
(4) rain may affect the crane driver's line of sight, if the driver does not have the experience of hoisting in rainy days, stop the hoisting work; or please have an experienced driver to carry out;
(5) When stopping the work, the hook of the tower crane should be withdrawn and close to the tower body, and no objects such as slings and building components should be left on the hook, in order to prevent these heavy objects from being blown by the wind and causing the tower crane to sway, which may lead to serious accidents such as the collapse of the tower crane;
(6) As the surfaces of the components and the hoisting ropes are wetted, resulting in the decrease of the coefficient of friction between the ropes and the components, which may lead to the slipping of components and other serious quality and safety accidents; at this time, the hoisting work is carried out; or ask the experienced driver to carry out the work; or ask the experienced driver to carry out the work. Safety accidents; at this time for lifting work should be doubled attention, if necessary, can be taken to increase the rope and component surface roughness and other measures to protect the safety of lifting work;
(7) rainy day lifting should be expanded to ground the scope of the forbidden, if necessary, additional manpower for guarding.
(8) six or more wind or rainstorm weather to stop all lifting operations.
4, construction machinery rain and lightning protection and construction site electricity:
(1) rain. All machinery sheds should be built firmly to prevent the collapse of the rain. Mechanical and electrical equipment to take rain, flood prevention measures, can be set up rain shed or sealed with rainproof cloth, machinery installation site requirements slightly higher, surrounded by better drainage. Installation of grounding devices. Mobile electric box leakage protection device to be reliable and sensitive;
(2) lightning. Rainy season is the lightning season, in order to prevent accidents caused by lightning strikes at the construction site, must be in the steel pipe scaffolding, tower cranes, material hoists, people and goods elevators, etc. to install effective lightning protection devices, lightning grounding resistance shall not be greater than 10 Ω.
(3) anti-electrocution. Construction site electricity must comply with the three-level power distribution and two-level protection, three-level power box for repeated grounding, resistance less than 10Ω; wires and cables are reasonably buried, there shall be no aging or broken cables; staff dormitory placement of safe voltage, in case of stormy weather, to arrange for a professional electrician on-site duty to check, and if necessary, immediately pull the switch to disconnect the electricity, all workers must be off before the end of the various equipment and tools power disconnect.
Four, rainy construction safety precautions
1, strengthen the safety inspection, timely detection of problems. The main body of the building, scaffolding, construction of electricity, the small machinery of the rain shelter and temporary facilities, safety signage for regular inspection, timely detection of problems in a timely manner, timely exclusion, repair of the damage in a timely manner.
2, pay attention to the use of rain-washed materials, to take treatment measures before use.
3, the storm should immediately stop outdoor construction work, personnel quickly withdrawn to a safe place, while the whole site should be decisive pull off the power supply.
4, to strengthen the training and education of construction personnel, to strengthen the rainy season safety construction knowledge, improve self-prevention ability and emergency response capability.