Generally 6kw, if the value of high-grade neighborhoods can take a little larger, and then multiplied by the utilization rate, generally take 0.3-0.6, the load size of the general design institute or the power supply bureau has the requirements, specifically as follows:
Residential load configuration is generally in accordance with the following principles:
One, the building area of 120 square meters and the following, the basic configuration of the capacity of each household 8kW
Second, the building area of 120 square meters and above, 150 square meters and below, the basic configuration capacity per household 12kW;
Third, the building area of 150 square meters and above, the basic configuration capacity per household 16kW.
New community residential load design standards: residential building area of 50 square meters or less: each household is designed according to the 4KW; residential building area of 51-60 square meters: each household is designed according to 4KW; residential building area of 51-60 square meters: each household is designed according to 4KW; residential building area of 50-60 square meters: each household is designed according to 4KW. Residential floor area 51-60 square meters: each household is designed according to 5KW; residential floor area 61-100 square meters: each household is designed according to 6KW; residential floor area 101-120 square meters: each household is designed according to 7KW;
Residential floor area 121-160 square meters: each household is designed according to 7KW. 121-160 square meters: each household is designed according to 8KW; residential building area of 161 square meters or more: each household is designed according to 10KW; oversized residential buildings, villa areas, electric heating, electrification of the district according to the actual site design.
:Users applying for new installation or increase in electricity consumption should provide the power supply enterprises with the approved documents of the electricity project and relevant information on electricity consumption, including the location of electricity consumption, electricity usage, nature of electricity consumption, list of electricity equipment, electricity load, security power, electricity planning, etc., and truthfully fill in the application for electricity consumption in accordance with the format prescribed by the power supply enterprises and go through the required formalities.
Newly constructed power receiving projects in the project stage, the user should contact with the power supply enterprises to reach an agreement of intent on the possibility of project power supply, power consumption capacity and power supply conditions before the site can be determined to determine the project.
Failure to do so in accordance with the provisions of the preceding paragraph, the power supply enterprises shall have the right to refuse to accept their applications for electricity supply. If the power supply enterprise has insufficient power supply capacity or the power consumption project is restricted by government regulations, the power supply enterprise may notify the customer to suspend the application.
Reference:
Electricity consumption rules_Baidu Encyclopedia