Part I project manager year-end summary report
Time flies, 20XX will soon be over, looking back at the past year, I can not help but feel a lot of emotion. From June 20XX as a project manager to the end of the year, this year's work flashed before our eyes. In the care and guidance of the leaders, in the mutual care of colleagues and work with each other, in the work of practice and learning, this year has come to an end. The following is my personal year-end summary report as a project manager.
I applied to join the network development department in June 20XX, after the inauguration of the new environment of the new. The project is relatively new, so the company diligently work hard, in order to grasp the company as soon as possible the focus of the project.
This year, from the first entry to the project engineering work of the small and do not understand, to now understand part of the project specifications, work priorities and processes, which can not be separated from the leaders and colleagues of the care and guidance. From the initial contact to the Taierzhuang District Taxation Bureau FTTH cell construction, I led into the project construction to familiarize themselves with the process, to the subsequent spring and summer seasons under the Baishi Bridge those days of hard work, master Zhang Zhenwei, patient and strict teaching, step by step at a time, in the honing of the benefit of the knowledge of the shallow. In the later contact with the Taierzhuang District metropolitan area network OLT, Zhangshanzi town cable access project, happy neighborhoods, etc. ... and strengthened my understanding of the project engineering construction and learning. Because of their own learning and engineering construction span larger, knowledge is still shallow, so in the work of the leaders are more benevolent to the extreme, the scale of my relaxation, so that I work and study in the benefit of a lot, full of power.
Later, the company also arranged for colleagues to assist me in learning the fixed network to solidify the business, Taierzhuang District, Canal Avenue along the street stores and residential buildings cable access project and Taierzhuang District, happy neighborhood cable access project, from the beginning of acceptance to do orders, small contracts, leadership and colleagues tirelessly explain to me one by one so that I finally completed the company within the prescribed time to solidify the task.
Although efforts to contact, learning engineering construction work knowledge, to enrich their own, so as to faster keep up with the work of professional footsteps. But mistakes are inevitable, because of the professional knowledge of the knowledge is very little, the work will also bring a little inconvenience. Fortunately, there are colleagues of careful care and guidance, the leadership of the former, giving me a lot of confidence and motivation.
The new year is about to begin, in 20XX I will effectively implement the duties of the post, seriously fulfill the post work, in the completion of their work at the same time, on time and quality to complete the work arranged by the leadership of the company. The next step I will mainly focus on the following aspects of work:
1, with the market mouth to put forward the need for fixed network investment, the network coverage of non-accessible neighborhoods, stores along the street.
2, the completion of the cell into the fast acceptance of the solid to ensure that the completion of the company issued by the solid target
3, the jurisdiction of the construction team to centralized management to ensure construction safety, construction progress, construction quality.
Part II Project Manager Year-end Summary Report
In the branch of the leadership of the trust and cultivation, I was appointed in xx in xx months as xxx project manager has been ten months, in the branch of the strong support and concern, the project department of the work of the progress of all the work is going smoothly, is now nearly a year's work summarized as follows:
First, the work:
Work, I always do my duty, everywhere strict requirements for themselves, to do the role of a model. Due to the owner's request to enter the field as soon as possible after the holiday, I on January 28 (the fourth day of the first month of the lunar calendar) on the organization of equipment and personnel rushed to the power station to start the work. In the pre-burial stage, the power station is geographically remote, the transportation and communication is extremely inconvenient, which brings a lot of inconvenience to the procurement of power plant materials and power plant installation work. In the case of overcoming the defects of the plant equipment and incomplete design and construction drawings, I led the members of the project department to successfully complete the pre-embedding work, which was recognized by the owner.
Since entering the straight period, due to the delayed delivery of the equipment in the plant and the design and manufacture of the equipment have more defects, which brings more difficulties to the installation work, and causes delays in the installation schedule. In order not to affect the owner's power generation plan, so that the plant equipment defects in a short period of time to be resolved, I organized the project department of the existing human resources, the orderly start of the work: consulting the plant technical experts, the organization of the backbone of the staff study to deal with the problem of the program, and make full use of the effective use of time to organize the staff overtime. Under the efforts of all colleagues, the installation of the booster station has been completed, 1 # machine convergence installation, completed 2 # machine generator pre-installation.
Second, project management:
In personnel management, I always adhere to the people-oriented management concept, according to the needs of the work and climatic characteristics, after consulting a wide range of views, the development of work and rest time: the limits of the solution and improve the living, accommodation, medical and construction conditions, to solve the staff to worry about, so that we can devote ourselves to work: according to the level of each person's skills and work characteristics of a reasonable mix of construction team. According to each person's technical level and work characteristics of the construction team with reasonable, give full play to each person's . Specialty, so as to achieve the purpose of improving work efficiency.
In terms of quality and safety management, set up a full-time safety officer and construction team three inspection system, adhere to the safety first, quality-oriented construction management concept. The lifting of large pieces of equipment, are safe technical briefing, the development of a reliable construction program: all construction personnel into the construction site must be correctly wearing labor protection products, high-altitude work requirements must be fastened with a seat belt: construction power and other sources of danger are set up conspicuous signs. Installation work in strict accordance with the drawings, design documents, construction, work before the technical briefing to ensure the quality of construction.
In the construction coordination, and the construction units to get along with each other, and improve the relationship with the owners and supervision units, to solve the problems within the project department, to create a unity, harmony, mutual assistance construction team. And coordinate with the owner in accordance with the construction progress, timely organization of equipment and materials into the field, to do a good job of all kinds of delay information related procedures.
Financial management, strict control of construction costs in all phases, in accordance with the company's regulations seriously do a good job of cash flow accounts and general ledger, and financial reimbursement on schedule. In view of the inconvenient transportation situation of the Kesikou power station, try to do less and more, for the auxiliary materials and equipment, tools are managed by a person, to eliminate all kinds of waste phenomenon, so as to achieve the purpose of reducing costs.
Third, learning
Through nearly 1 year of work, let me y appreciate, as a project manager there are many things to learn, especially in the project overall construction planning is still a lack of experience. Only after mastering a wealth of theoretical knowledge, accumulate rich experience in the installation, in order to be more comfortable in the practical work. I am aware of their own many shortcomings and the need to improve the place, I will work hard in the future to learn, constantly summarize, and avoid the shortcomings.
Part III Project Manager Year-end Summary Report
Time flies, in a flash 20xx year is nearly over, in this busy year, I was fortunate enough to participate in the construction of the Jinbin Light Rail Donghai Road station reconstruction project, rail transit Z4 line, Xiong'an New Area afforestation project*** count 3 projects, especially Xiong'an New Area afforestation project. The requirements of each unit were submitted, including the Binhai New Area Archives, the owner unit Tianjin Binhai Rapid Transit Development Co., Ltd. and the general contracting unit Tianjin Rail Transit Group Engineering Construction Co.
Z4 line in the Spring Festival after the successive start of construction, as of May 20xx I am mainly responsible for the work of the Department of Quality Management, in this period of time the preparation of the quality management system and quality control measures, quality incentives and penalties, to be piling resumed after the construction of work will focus on the site of the piling, right-of-way, the construction of the barrier quality control, and at the same time on the quality of the processing of reinforcing steel cage on-site self-inspection, after passing the self-inspection and then reported to the superintendent. At the same time, the quality of steel cage processing on-site self-inspection, self-inspection and then reported to the supervisor for acceptance, supervision of the acceptance of the rebar cage labeling marking, before being transported to the site to use.
In order to ensure the quality of construction, the weekly organization of the project department technical management personnel and construction teams to convene a quality analysis and summary meeting, the quality of the week since the summary of the analysis, clear precautionary measures and quality control standards, in the bearing platform pit excavation, with the third-party piling detection unit for pile foundation acoustic tube non-destructive testing to ensure that the subsequent platform construction can be carried out smoothly; during this period of time with the quality supervision station to complete this section of the bidding. During this period, we have completed the acceptance of the first piece of reinforcing cage and the acceptance of the piling sample project with the Quality Supervision Station of this section.
From May according to the needs of the work, I transferred to the Ministry of Engineering Management, the work mainly includes the organization of technical personnel to prepare the construction program, for different construction parts of the construction of technical instructions for the preparation and issuance, and the organization of the project department and the construction team operators for pile foundation, bearing platform, pier construction technology training, the organization of the statistics of the amount of concrete used by the special person with the analysis of the savings of super, according to the changes in the amount of concrete used to estimate the amount of concrete used in the construction of the project, and to ensure that the construction of the project is carried out in a timely manner. Organize special personnel to carry out the statistics of concrete usage and the analysis of savings and overruns, and predict the quality of piling holes according to the change of concrete usage. Organize the technical personnel of the engineering department to review the new drawings, and cooperate with the planning and management department to carry out the statistics of the project volume used for upward and downward measurement.
I also in July to prepare the completion of the light rail company No. 99 courtyard repair works of the technical standards, in September to prepare the completion of the small light rail repair works of the technical standards, during the period of travel to Shijiazhuang subway project to carry out construction drawings for the volume of work review work, to the Texas Shijiazhuang line for the design of the volume of work of the estimate of the statistical work.
From the end of September, I was sent to Baoding Rongcheng to carry out the preliminary investigation of the Xiongan afforestation project, and from October onwards, I was put into the bidding working group of the Xiongan New Area afforestation project for the preparation of the bidding documents, and I got the information of winning the bidding to follow the leadership to arrive at Xiongan County, and began the preparatory work of the new project, which mainly included the preparation of the implementation of the construction organization design, annual construction plan, and organizing the various groups of personnel. Familiarize with the implementation process of the big data system in advance, carry out the start of the report of the relevant information submitted for review, the organization of the preparation of the "irrigation project construction program", "seedling planting construction program", "seedling maintenance construction program", "night construction program", etc., at the same time, each process of the written technical delivery and sign the archives.
In the seedling planting process every day to the site to check the quality of seedlings to the field and planting, do not meet the specifications of the drawings, or pests and diseases of the seedlings directly let it return, large areas of planting every afternoon to lead the two construction teams of technicians to the site to carry out quality inspections, support, water ring unqualified places to mark, and arrange for specialists to make corrective adjustments.
According to the overall construction progress plan to develop a weekly plan and daily plan, supervise the construction team in accordance with the node plan for construction arrangements and implementation in place, in order to ensure that the construction progress under the premise of taking into account on-site safety and quality management, and ultimately in the entire project department of the *** with the efforts of the owner of the planting plan under the over-subscription of the year.
Part IV Project Manager Year-end Summary Report
Since the beginning of the year, under the leadership of the company and the support and help of my colleagues, I have done a good job of completing the year's work, and has served as the Cheng Yu Plaza bar renovation project, the Flood Control Office renovation project, the Evergreen Security Company renovation project, the Lonan bookstore renovation project, the supervision and the Hongwei Park renovation project, and the supervision of the project. Supervision and project manager of the renovation project of Hongwei Park, now the work is briefly summarized as follows.
1, strengthen learning, improve their own quality.
As a new recruit in the decoration industry, I know that my professional knowledge and business quality are far from the company's requirements. Therefore, I focus on the daily work of the decorative industry related knowledge of learning, has read and studied the "decorative construction manual", "engineering acceptance standards" and "project manager management manual" and other books. While learning from books, I also humbly learn from colleagues around the high level of business, to do not know how to ask, accumulation, step by step, and gradually improve their theoretical and business level, and now basically able to adapt to the requirements of the work.
2, extensive publicity, set up a company image.
I take advantage of my work and the outside world to contact a wide range of advantages, every site, I have to the leadership of the A party and the surrounding staff to introduce the company's strength, quality of personnel, the company's performance and the company's development trend, try to make them have a comprehensive understanding of the company, while gaining their trust, the establishment of long-term contact, and strongly promote the smooth progress of the work. As a project manager, I started from strict self-discipline, requiring subordinates and construction workers to pay attention to their own image at all times, reminding them that everyone's words and deeds represent the company, and that they can't win personal interests at the expense of the company's interests, and that even if they are aggrieved, they have to be patient and can't bump into the A party. Through a series of work, the company's good image is maintained, leaving a deep impression on customers.
3, improve the system, strengthened construction management.
No rules, no circle, for the magnificent park site system is not perfect, the management of the actual loose, I went through a careful investigation and research, has developed a "morning meeting system", "rewards and punishment system" and "material management system", standardize the site order. Iron still needs its own hard, I always insist that others to do, they must first do, and to do better, for example, every day I come to the site in advance according to the work time, the first comprehensive inspection once for the discovery of this information belongs to the secret resource network strictly prohibit the copying of plagiarized problems in the morning meeting to make timely and appropriate arrangements and processing, for the next step in the work of the time and space to provide, so as to establish their own prestige. Good performance in the work of the personnel, I have praised and rewarded, do not meet the norms, and repeated offenders, resolutely punished, refused to anyone to intercede, thus prompting the workers to develop good working habits, consciously abide by the rules and regulations, improve the standard of work, and comprehensively complete their own work tasks.
4, in-depth coordination, to promote the work process.
In just entered the magnificent park site, many affairs and relations are not straightened out, bringing great difficulty to the work. I first started from the coordination of the relationship with the A party, a comprehensive coordination work. In order to solve the drawings and the actual situation on the site does not match, and there is no color steel plate, water supply detailed drawings, air conditioning circuits, exhaust vent and other sub-engineering drawings, I repeated many times with the design department for consultation, moved by my sincerity, they finally agreed to change the original design by my company, and then reported to the party for approval, and after a careful work on the party, the design department finally signed the changes on the drawings, so that new The drawings were implemented. Party A on our procurement of ` floor tiles, wall tiles and other materials to intervene a lot, the requirements must be in accordance with the budget price of the procurement, and then after a number of positive coordination, Party A made great concessions for the company to win the difference in profit; at first, the supervisory side of the strict requirements, the provisions of each incoming materials to the Daqing testing station for the second inspection, electricians and other special types of work to have a certificate of competency, and to provide us with the qualification of the subcontracting.
In the face of these problems, I always do not affect the progress of the project and the quality of the purpose, after efforts to coordinate, these problems are solved, to avoid a lot of unnecessary trouble, but also with the supervisory party to enhance the feelings and give us a lot of support, such as: take the initiative to help us plan the water, electricity changes, which can be reduced, reduce the work, what changes in our favor, and so on, and also to help us! We also help us to make internal data. So that we save money nearly 10,000 yuan, such as cable tray according to the design to reduce the 60, width reduced by 50mm, closed door on the bright channel steel reduced by half, the facade of the horizontal gray bar reduced by half, the original 12 pairs of solid wood door to fire door.
Although the work has made certain achievements, but at the same time also found some problems.
First, the company's management system is not sound, especially in the field management of the project appears to be very lack of;
Second, the staff's authority is unclear, resulting in some shirking of responsibilities;
Third, the specific staff sometimes comprehend the general manager's intentions, delays in the work;
Fourth, the company undertakes large-scale projects, the pre-production of incomplete plans. The profit, construction program, infrastructure investment is not detailed, the consideration is not thorough, work sometimes caught off guard.
For the actual situation of the company, I have the following suggestions:
First, the establishment of a sound company's management system and bylaws, clearly defined staff position responsibilities, and really do have a chapter to follow when problems arise;
Secondly, the treatment of large-scale projects, be sure to analyze the possibility of plagiarism of the information belongs to the secretarial network of plagiarism is strictly prohibited to copy the difficulties and problems to make a set of foreseeable, detailed work program, to the problem of the problem.