2021 Emergency Plan for Flood Safety (General 6)
In the weekday study, work and life, sometimes encounter unforeseen accidents, in order to make timely emergency response to reduce the consequences of the accident, often need to formulate an emergency plan in advance. How should the emergency plan be prepared? The following is my collection of 2021 emergency plans for flood safety (general 6), I hope it can help you.
Emergency plan for flood safety 1
Purpose: In order to ensure the normal life of the owners, work order operation and safety of life and property, to ensure the normal operation of the equipment, so that the buildings and facilities and equipment in the summer safety flood control
Scope of application: the company under the jurisdiction of the project
Supervision of the implementation of: project manager (the second working hours of the duty manager)<
Responsibilities: project property department, engineering and technology department, security department is responsible for the supervision and implementation
Flood emergency procedures:
First, the flood control organization
1, before the flood season set up a flood control team, the project manager as leader, engineering department director as deputy leader, team members for the security department director, property department director and duty manager.
2, in the event of danger, the project manager is responsible for the deployment of material and human resources, the director of the engineering department is responsible for on-site command, the customer service center manager, the manager of the security department is responsible for the deployment of the Department of personnel to cooperate with the rescue and relief. Danger occurs at night and double holidays, the duty manager is temporarily responsible for command, and timely notification of other members of the flood control team rushed to the scene.
Second, the Ministry of Engineering flood control measures
1, the establishment of a special storage library for flood control equipment, storage of flood control equipment, mainly should be a number of submersible pumps, drainage hoses, waterproof distribution boxes, woven bags, sand, shovels, etc.;
2, the key to the library of flood control equipment should be in the Department of Security, the Ministry of Engineering and Technology, the Department of the project each Store a;
3, before the arrival of flood season, the Ministry of Engineering maintenance personnel and security patrols should be carefully inspected
(1) the roof platform drains are unobstructed, and at the same time will be the roof of the garbage clean;
(2) check the underground puddles of sewage pumps are sensitive and effective, and will be put in the control of "automatic" position;
(2) check the underground puddles of sump pumps, and put the control in the "automatic" position;
(3) check the underground puddles of sewage pumps, and put the control in the "automatic "position;
(3) check the building inside and outside the rainwater wells, sewage wells, rainwater pipe whether there is a buildup, and to remove, to ensure smooth drainage;
(4) check the power distribution room, central control room and other important rooms whether there is a leakage of rain, and if there is an occurrence of the case should be dealt with in a timely manner.
Third, the risk of dealing with procedures
1, if the rainwater into the underground machine room, the Ministry of Engineering staff should be timely start sewage pump drainage, and sandbags to block the door of the machine room to protect a variety of important equipment. At night and on double holidays, the duty manager on the one hand to organize personnel to rescue, on the one hand, immediately notify the project manager and other members of the flood control team;
2, security personnel by the manager of the security department command, a part of the personnel to maintain order, a part of the personnel to assist the Ministry of Engineering to remove the danger, rescue equipment;
3, the Ministry of property personnel to remove the various parts of the accumulated water;
4, the danger of After the occurrence of a comprehensive inspection, statistics on the damage caused by the flood and material consumption, and timely replenishment of flood control materials, make good preparation for the next flood control;
5, the incident handling process should be recorded in detail, by the project manager to the leadership of the company to make a report.
Emergency plan for flood control and safety 2
With the arrival of the rainy season, according to the Liuyang City Safety Supervision Administration on doing a good job of the current safety of non-coal mine enterprises notice, flood control and flood prevention work is imminent. My mine in order to safe flooding, the development of flood control emergency plan, set up a flood control leading group, and equipped with sufficient materials, equipment and other flood control supplies to ensure that the mine safely and smoothly through the flood season. Its emergency plan is as follows:
First, emergency principles:
I mine adhere to the prevention-oriented, prevention and robbery combined, unified command, unified scheduling, the principle of obeying the overall situation, carry forward the spirit of unity against floods, in the mine flood control leading group under the unified guidance of the positive cooperation, unity, to ensure that the mine safe flood.
Second, the work plan:
Develop a flood prevention and flood control safety management system, and to do all the members of the flood awareness, and the system will be implemented to the various shifts, personnel. Timely flood safety education and flood control and flood control safety responsibility education. Frequently check the preparation of flood prevention and flood control materials and the operation of flood control equipment to ensure emergency response when floods come. Strengthen the logistical support and service work, to ensure that personnel, materials, equipment and site work all safe.
Third, the establishment of the flood control front command, clear responsibilities:
Commander-in-chief: xxx
Deputy Commander-in-chief: xxx
Members: xxxxxxxxxx
Commander-in-chief: the whole mine within the scope of the overall responsibility of flood control, unified command of the work of flood prevention and flood control.
Deputy commander-in-chief: responsible for the implementation of the first program, mobilize flood personnel and the required materials. Timely preparation of rescue equipment, according to the order of the commander-in-chief quickly run to the designated location, and is responsible for relief personnel accommodation and other matters.
Members: the implementation of the instructions of the commander-in-chief, responsible for the supply and reserves of flood control materials, equipment deployment and transportation and rescue work of all related matters. Medical group: Nanyue Village Health Center staff, responsible for the treatment of personnel injured in the rescue process.
Fourth, the emergency program:
(1), the establishment of the mine director as the command of the front line of the flood control headquarters, division of labor, clear responsibility, to ensure that the responsibility to the person, strengthen the scheduling, to do all the action command, all actions listen to the command, the flood season, the arrangement of the site of the special person on duty, and set up the flood control and flood rescue team.
(2), do a good job of material supply plan, arrange for the preparation of flood prevention and flood control materials, before the flood season comes, prepare enough woven bags, sand, water pumps, shovels, raincoats and other flood control materials.
(3), put into the rescue site of the loader, generator Yew strengthen maintenance and repair, to ensure that the flood season comes when the equipment can operate normally, special periods can give full play to the emergency role of the equipment.
(4), the ground by the flood threatened materials and equipment, by the mine commander-in-chief of the unified arrangements, as far as possible to carry to the high safety zone.
(5), the commander-in-chief according to the water level changes, the organization of flood control team members as far as possible to dredge the flood channels, to minimize the loss of property in the mine.
(6), the custodian group by Xie Xiyuan is responsible for, in accordance with the requirements and instructions of the command, the issuance of anti-flood flood rescue work required tools, materials and supplies, to ensure that anti-flood rescue work can be carried out smoothly '.
(7), the medical group by the Nanyue Village Health Center medical staff. Medical personnel in the rescue period, to be personally on the scene for the rescue process of the injured personnel for timely treatment, for the more serious injuries, to be sent to the hospital in time for treatment.
(8), the car group by Xie Haibo is responsible for the rescue period to have enough cars to transport the injured and medical personnel.
(9), communication group by Xiong Shanbao is responsible for the accident is responsible for convening the flood rescue personnel and contact the relevant units of the higher level, and timely report to the commander-in-chief of the higher level of the relevant spirit and instructions.
(10), if the accident is too big, the unit can not handle the situation, should immediately notify the mine rescue team to request rescue.
Fifth, the number of emergency equipment and materials prepared and stored in the location:
The plant custodian
Emergency Plan for Flood Safety 3First, the flood control situation and the main task
Reconstructed after the water damage, the reservoir (hereinafter referred to as the reservoir) was built in the year. The reservoir is mainly responsible for nearly 3,000 hectares of paddy fields in Datun Town and the state-run fisheries fish farming water needs. Due to the embankment project is not perfect, every year to carry out emergency rescue, especially this year, due to the flood storage and diversion measures, the reservoir water level is high, the current reservoir water level has reached 132.45 meters, coupled with the prison Zhenlai Branch will still have 10 million square meters of paddy water discharge into the reservoir, due to the high winds and high waves into the fall, there have been 4,420 meters of embankments in danger, of which 2,100 meters of the serious danger section.
The principle of scientific decision-making, democratic decision-making, in order to ensure the safety of the reservoir area. The county government in the month of the organization's experts on the reservoir flood control was demonstrated. According to the views of the expert group, to determine the general requirements of the reservoir area flood control emergency rescue is to adhere to the safety first, prevention-oriented, all-out rescue. Both to keep the water, but also to keep the dike.
Second, the specific arrangements for flood control work
(a) the establishment of the temporary headquarters of the reservoir flood emergency rescue, leadership organization. For the current actual situation in the reservoir area. The commander-in-chief by the county government as deputy governor, deputy commander-in-chief by the Procuratorate Procuratorate, Water Resources Bureau Secretary, State Fishing Party Secretary as. The command set up three working groups. First, the rescue group, headed by the director of the State Fishing Farm, mainly responsible for scheduling rescue manpower and materials, and organizing flood control and rescue. The second is the material group, headed by the party secretary of the state-run fishing farms, the Director of the Bureau of Fisheries as the main responsibility for the emergency rescue to provide material security. Third, the technical group, headed by the Water Resources Bureau as chief engineer, mainly responsible for the reservoir emergency rescue program, and guide the entire rescue work. The reservoir emergency rescue by the Ministry of unified leadership, and the rescue work throughout the tracking supervision and inspection.
(b) by the county and fisheries **** with the undertaking, funding implementation. This reservoir emergency rescue is expected to require funds of 200,000 yuan. County finances take 100,000 yuan, fisheries supporting 100,000 yuan, emergency rescue funds earmarked, unified scheduling, use, management by the command. Other needs such as woven bags, straw bundles and other emergency supplies, by the command coordinated by the relevant departments and townships to be resolved.
(C) to focus on time, time schedule. This reservoir emergency rescue to take the way to fight the battle. Concentrate on manpower and material resources to ensure that the danger is lifted within ten days.
Three, a few requirements
(a) firm confidence. Various places, all relevant departments should attach great importance to this reservoir emergency rescue work, unified thinking. To be treated as a current central work, raise awareness and unify thinking. At present, especially to do a good job of the majority of cadres and workers in the fisheries ideological work. To strengthen the positive publicity and guidance to educate the majority of cadres and staff to correctly view the current situation, to overcome the fear of difficulties and the mentality of fluke, fully understand the county government to make such a decision on the scientific nature, feasibility, necessity, and then enhance the emergency rescue work of confidence and determination.
(2) divided into troops to handle the mouth. This emergency rescue under the unified leadership of the command, clear responsibilities. The technical group should be based on the current actual situation, as soon as possible to come up with rescue programs, for each dangerous section of the risk to meet what standards, to put forward clear requirements. Material group should be based on the requirements of the technical group, in advance to do a good job of material preparation, to ensure that the emergency needs. The rescue team should implement the rescue personnel as soon as possible, to ensure the size of the team, a reasonable mix of labor and scheduling to improve efficiency. At the same time, the fishery should implement a good dike patrol personnel, adhere to the 24-hour dike patrol, to ensure that the emergence of dangerous situations can take timely measures.
(C) to ensure safety. Flood control work is a great responsibility, adhere to standards. Command members of the unit must stand on the party and cause responsible for the people's lives and property is responsible for the height of awareness and view of this issue, to serious work discipline, adhere to engineering standards, strict operating procedures to ensure that no mistakes. At the same time, for the embankment traffic is unchanged and the actual cold water cool days, to do a good job of all safety precautions and safeguards to ensure construction safety.
(D) synergy. This reservoir emergency rescue work, close cooperation. The county's current a key work. Everywhere, the relevant departments must have a big picture concept, set up a "chess" idea, take the initiative to stand, due diligence, for emergency rescue work to give full support. Command of the various working groups to enter the role as soon as possible, clear responsibilities, the implementation of the task, and to do a good job of articulation, and actively cooperate to ensure that the reservoir area of safe flooding.
Emergency plan for flood safety 4
In order to prevent severe weather such as rainstorms and thunder and lightning, to prevent possible flooding, to ensure the personal and campus property safety of teachers and students, combined with the actual school in our town, the development of this emergency plan.
First, the establishment of heavy rainfall flood prevention leading group
Group leader:
Group member:
Second, the preparatory work
1, the primary and secondary schools in the heavy rainfall before the arrival of the school building carefully check the situation, see whether the roof leakage, walls, clean up the sewerage pipes, and whether it is a rainfall. Whether the rain, clean up downpipe ditches and other drainage facilities, there are problems with timely maintenance;
2, the teachers and students to prevent rainstorms, lightning and flooding safety knowledge education, to be proactive;
3, check the surrounding environment of the school, to prevent accidents in the school due to external causes. Schools close to the mountain slopes, pay close attention to the situation of the mountain to prevent landslides and landslides and other disasters;
4, check the circuit equipment, to prevent accidents caused by drenching;
5, there is a Lushui River flood control task of the unit set up a flood rescue commando team, the implementation of personnel and duties, and to prepare enough sandbags, sand, shovels, raincoats, flashlights and other flood control gear;
6, check my Central school is responsible for flood control lift water embankment two gates and lots, develop flood control arrangements, prepare personnel and equipment;
7, each school to determine the evacuation routes and resettlement places in case of emergency, organizing teachers and students to carry out self-rescue, mutual rescue, escape drills.
Third, emergency measures
1, pay attention to the weather forecast, in case of bad weather or into the flood season schools must arrange 24-hour duty, all personnel to maintain communication 24 hours a day, so that in case of emergency can be deployed in a timely manner on all types of personnel;
2, heavy rain hours, school duty personnel and Security personnel should frequently patrol all parts of the school, there are residential students in the school, to focus on the inspection of student dormitories, if found dangerous, immediately report to the supervisor on duty and the unit leader, start the emergency procedures;
3, strong thunder and lightning weather, to do a good job in the school personnel and electrification, distance learning equipment to protect against lightning;
4, once the school building in danger, quickly organize the students to orderly Evacuation, transfer to a safe place, teachers should first ensure the personal safety of students;
5, timely through the campus radio, telephone, cell phones and other media and communication tools to the relevant departments and personnel to pass information, inform the situation, access to all aspects of support;
6, pay attention to the road conditions of students going to school and leaving school, if the road is damaged or there is a safety hazard students can not go home, the school should be properly placed Students, and contact parents in a timely manner;
7, in accordance with the unified arrangement of the town government, the organization of personnel to do a good job of lifting the water river embankment blocking flood control tasks.
Fourth, the work requirements
1, the ideology should attach great importance to the spirit of the Party and the people's cause is responsible for, to overcome paralysis and laxity, the idea of taking things lightly, and seriously make all the preparations;
2, the work should be implemented, the division of labor responsibilities are clear, the material reserves in place;
3, organization Coordination should be strong to ensure the smooth flow of orders.
Emergency plan for flood safety 5
First, the purpose
In order to protect the workers' life safety, to ensure that when the rainy season flood season comes, to ensure the safety of life and property of the engineering staff, to protect the normal construction of the construction site, to control the damage to a minimum, according to the national, provincial, municipal and county documents on flood control, to this end, the development of flood emergency plan. The program.
Second, the organization
Sichuan Hangjian Foxconn staff security housing (a) the fourth section of the project project department rainy season flood emergency leading group:
Group leader: Liu Zhi
Deputy leader: Yan Bing
Members: Dong Lei, Yu Heng, Lin Xiaochun, Wang Lizhong, Wang Zhonghua
The project is the first of its kind in China. >
Sichuan Hangjian Foxconn employees protective housing (Phase I) fourth section of the project department rainy season flood emergency rescue leading group located in the project office.
Third-party rescue contact:
First aid telephone 120, alarm telephone 110, fire telephone 119
Third, the basic principles
Flood control work adhere to the "safety first, unremitting, preventive-oriented, all-out emergency" policy.
Flood control work adhere to the "safety first, always be prepared, prevention-oriented, all-out rescue" policy, actively develop and implement flood control planning, strengthen drainage measures, scaffolding reinforcement, and electrical equipment management inspections, strengthen the collection of weather forecasts, so as to prevent accidents before they occur.
1), (Liu Zhi) is responsible for on-site guidance, and do a good job of coordination with various departments.
2), (Dong Lei), (Yu Heng), (Lin Xiaochun) is responsible for tracking and checking the construction and finished product protection of each work surface.
3), (Wang Lizhong) is responsible for the safety management of the construction site, and do a good job in the rain and summer construction safety education.
4), (Yan Bing) is responsible for the site of the reasonable stacking of materials, rain and moisture, all kinds of machinery and equipment maintenance, and do a good job in the preparation of flood control equipment.
5), (Zhang Chengyi) is responsible for the temporary electricity, equipment and machinery insulation checks to prevent wire broken skin, leakage and so on.
Fourth, the preparation of materials:
According to the specific circumstances of the project, prepare the equipment and materials used in flood control. Prepare pumps, water pipes, tarpaulins, shovels, etc., the equipment required for rain prevention should be prepared sufficiently, the required equipment must be maintained in good condition.
Emergency plan for flood safety 6
Due to the current constraints imposed by the land acquisition and relocation of China Railway Nine Bureau Group xx line xx standard project manager can not be fully carried out the construction, we are now on the construction of the xx1 tunnel project to develop the flood emergency plan submitted to the infrastructure center leadership, xx1 tunnel project flood emergency plan is as follows;
1. Purpose
1. strong>
In order to cope with this year's special climate and emergency caused by heavy rainfall and flooding, to make the appropriate treatment in an orderly and efficient manner, to minimize the loss, and to maintain the stability of the community, the development of this plan.
2. Scope of application
This emergency plan is adapted to all the employees of China Railway Ninth Bureau who are engaged in the production of the tunnel project No. xx1 under construction by the project department of the section xx of the xx line and who are responsible for the emergency help to others and the emergency protection of the enterprise's property in case of emergency caused by the special climate and heavy rain and flooding at the workplace in the near future. property to implement the responsibility of emergency protection, and assume the responsibility of safety protection of the existing lines of XX Company. In the event of flooding in other places, assume the obligation to implement emergency help to people's property.
3. Organizational structure
xx line xx standard section project department set up flood emergency help leading group, office located in xx company xx line xx standard section project department of the scheduling room, responsible for the construction of the whole pipeline section of the work of the flood control. Tunnel operation team set up tunnel flood emergency relief leading group, responsible for xx line xx bid section project all tunnel project flood prevention work specific implementation.
Tunnel operation team flood emergency relief leading group
Group leader: xx
Deputy leader: xx, xx
The first group: xx, xx, xx, xx, xx, xx, xx,
Mainly responsible for the construction of the roadbed, bridges, culverts and tunnels are not carried out;
The second group: xx, xx, xx, xx, xx, xx, xx
Mainly responsible for xx1 tunnel;
4. Emergency Preparedness
4.1 Adhere to the principle of "prevention as the mainstay": all employees should establish the awareness of safety first, always maintain a high degree of vigilance, enter the rainy season should be a special person to adhere to the principle of "prevention as the mainstay", the mainstay of the rainy season should be a special person to adhere to the principle of "prevention as the mainstay". After the rainy season should be specialized personnel to adhere to the daily record, listen to, watch the weather forecast at all levels, especially the disastrous alarms, and take appropriate measures in a timely manner.
4.2 Once the sudden rainstorm flood disaster, immediately start the following functions of the staff, fully committed to the handling of the disaster.
4.2.1 The person in charge of each work site reports the situation to the superiors and local authorities at the first time, and is responsible for directing the evacuation of the site personnel to the heights, roofs, etc.
4.2.2 The person in charge of on-site construction (foreman or foreman) is responsible for maintaining the order, counting the number of employees, and preventing the chaos.
4.2.3 The person in charge of logistics is responsible for simple medical treatment, ensuring on-site diet and hygiene, and reserving necessary living and medical supplies.
4.2.4 The person in charge of on-site technology is responsible for the custody of technical information and rescue, and is responsible for recording and taking pictures of the flood level and other disaster conditions.
4.2.5 Communication liaison (appointed temporarily by the team leader) to listen to the instructions of the team leader, the first time to report the situation to the higher emergency response center, and to do a good job on-site internal and external communication links.
4.2.6 On-site electrician at the first time, take the safest measures to cut off the main power supply.
5 on-site disposal countermeasures
5.1 Immediately organize the orderly evacuation of employees to the safe area, the department as a unit of the headcount at the same time immediately to the relevant departments to report the disaster.
5.2 On-site staff immediately rescue the injured, cut off the power supply, rescue national property, as far as possible to minimize the loss of national property.
5.3 The leading group to organize personnel, the property damage situation to carry out a careful investigation, record, write a written report to the construction company.
6. Emergency preparedness and measures
6.1 Pre-construction should be engaged in the production of all employees for flood control methods of training, so that the employees are familiar with the flood emergency plan, to ensure that in the event of a flood each employee can take the most accurate emergency measures to reduce losses.
6.2 When necessary, but also to organize the relevant personnel to carry out drills to verify the emergency preparedness and the implementation of the plan effect, to improve the ability of self-defense and self-rescue in the actual combat.
6.3 Clean and dredge existing ditches, drainage and flood channels within the construction area, so that no silt, no blockage, no construction hazards, no blockage of the river, to ensure that there is sufficient flood capacity.
6.4 tunneling project in the construction of the first good top of the cave door prevention, interception, drainage facilities, and strive to enter the hole as soon as possible. Into the hole to do a good job of side, slope permanent and temporary protection, open hole section of the earth and rock excavation in strict accordance with the "Tunnel Engineering Open Hole Project Guidebook" construction, to ensure the safety of the construction of the hole.
6.5 pyrotechnic storehouse must be installed in accordance with the provisions of the lightning grounding device, to avoid the use of thunderstorms and transportation of pyrotechnic products.
6.6 Disposal of ballast field retaining wall protection according to the design requirements in advance.
6.7 Temporary project do good prevention, drainage work. Pay special attention to temporary housing, gravel yard and cement warehouse, steel stacking yard and processing yard, air compressor room, substation, fireworks storehouse, machinery parking lot prevention, drainage work, to ensure that the personnel, machinery, material safety flood. Temporary construction right-of-way has enough defense and drainage facilities to ensure smooth and unobstructed.
6.8 Careful inspection and verification of construction materials and equipment stored in the low-lying areas, and when necessary, transfer them in advance to a safe location on higher ground.
6.9 Construction machinery, personnel in the rainy season construction to strengthen the lightning, anti-skid, anti-collapse measures to ensure the safe and orderly construction.
6.10 Strictly according to the "Tunnel Engineering Waterproofing and Drainage Operating Instructions" to do a good job of tunnel prevention and drainage.
6.11 According to the emergency plan to prepare enough corresponding equipment, equipment, machinery, to ensure the start of the plan.
6.12 In case of emergency rescue tasks, must obey the unified command and arrangement of the project department.
6.13 tunnel operations team flood emergency assistance leading group of the section of the tunnel project to carry out a comprehensive flood prevention work special inspection.
;