Tower crane work summary

Summary is a certain stage of the relevant situation analysis and research, to make a guiding experience and methodology as well as the conclusion of the written materials, it can make the mind more clear, the goal is more clear, let us take the time to write a summary of it. But found that I do not know what to write, the following is a summary of my work as a tower crane, welcome to read, I hope you can enjoy.

Tower crane work summary 1

In order to eliminate safety hazards, to ensure that the construction of safe and orderly, improve work efficiency, I leasing station in December 6, 20xx -20xx December 10, respectively, Huizhou Royal Court Bay world project, LA office building project, Zhongtianyuan Logistics Park project, Yangjiang nuclear power plant project, Zhongshan CITIC Blue Coast project, Nanhai A comprehensive and detailed inspection was carried out on 52 sets of small machines, 16 tower cranes, 8 elevators and 47 derricks used in the CITIC Mountain Lake Project***. The specific inspection situation is as follows:

The overall inspection results are good, but there are still such as: elevator single, double-door limiter failure, the cab is not equipped with fire extinguishers or fire extinguishers fail, and other common problems, the project is expected to machine administrator can be conscientiously implement the "regular maintenance of machinery and equipment maintenance management system," "lifting machinery regular inspection management system," in order to ensure that problems are identified in a timely manner, and timely reporting, timely solution.

1, Huizhou Imperial Court Bay World Project

The project has JL5613 (1 #), JL5613 (2 #) *** counting two tower cranes

Mechanical equipment in general good condition. Detailed inspection results: JL5613 (1 #) tower crane was checked all normal, there is no problem; 2 # JL5613 tower crane tower cap connecting pins outward, cotter pins deformed, need to be tightened, replace the cotter pins.

2, LA office building project

The project has C6018 (1 #), C6018 (2 #) *** 2 tower cranes, 2 elevators, 1 3m air compressor, 1 submerged arc welding machine, 1 multi-stage water pump, 2 mortar machines (purchased).

Detailed inspection results: C6018 (1 #) tower crane lifting arm 35m connecting pin stopping block wear; C6018 (2 #) tower crane by checking the normal does not have a problem. Mechanical equipment in general

good condition, small equipment repair rate is low.

3, Zhongtianyuan Logistics Park Project

The project has C6018 (1 #), 23B (2 #), H25/14 (3 #) tower crane **** 3, 2 elevators, 750 mixer 1, 350 mixer 1, 1 rebar bender, rebar cutter 2, 1 air compressor, 1 submerged arc welder, 1 multi-stage pump, 1 steel straightening machine.

Detailed inspection results: C6018 (1 #) tower crane did not find problems, everything is normal; 23B (2 #) tower crane trolley running drag wheel friction under the arc connection weld 40m-50m; H2514 (3 #) lifting arm 30 meters at the stopping block defective. No problem was found on the 2 sets of Xinboda elevator inspected, everything is normal. No problem was found on 1 set of 750 mixer, 1 set of 350 mixer, 1 set of rebar bender, 2 sets of rebar cutter, 1 set of air compressor, 1 set of submerged arc welder, 1 set of multi-stage pump, 1 set of rebar straightener, the overall condition of machinery and equipment is good, and the rate of repair of small equipment is low.

4, Yangjiang Nuclear Power Project

The project has 2 sets of 21CJ210 flat-head tower cranes, 6 sets of construction derricks, 5 sets of rebar bending machines, 4 sets of rebar cutting machines, 2 sets of rebar straightening machines, 1 set of butt welder, 2 sets of 350 mixers (self-purchase), 1 set of AC arc welder (self-purchase), 3 sets of hydraulic bending machines (self-purchase), 1 set of straightening and cutting machine (self-purchase). 2 sets of sand and gray machine (self-purchase), 3 sets of bending machine (self-purchase), 1 set of cutting machine (self-purchase).

Detailed inspection results: 21CJ219-type flat-head tower crane 2, good condition, complete safety devices. The 6 construction derricks inspected were not found to be problematic, all normal. No problems were found with the inspected steel bending machines, steel cutting machines, steel straightening machines and other small machines,

All normal. The overall situation of machinery and equipment is good, small equipment repair rate is low.

5, Zhongshan CITIC Blue Coast Project (double package project)

The project has C6018 (1 #), QT263 (2 #)*** 2 tower cranes, 21 elevators SCD200/200AJ, 22 elevators SCD200/200TD, 23 elevators SCD200/200TD, 24 elevators SCD200/200 ***4 elevators.

Detailed inspection results: tower crane C6018 (1 #) standard section standing pin cotter pin is not standardized; climbing ladder fixed pin bar individual no cotter pin. Need to rectify according to the norms, individual no cotter pin fixed pin rod need to add cotter pin. Tower crane QT263 (2 #) did not find problems, all normal. 21 elevator SCD200/200AJ attached to the wall support cotter pin with wire instead of, need to be replaced; broken rope limit switch failure, need to be replaced; 22 elevator SCD200/200TD, all normal; 23 elevator SCD200/200TD, the right cage bone limit switch cover oil contamination; the left cage door limit switch without brackets. No problem was found in elevator SCD200/200 of building 24, everything is normal.

6, South China Sea CITIC Mountain Lake Project

The project has QT2100 (1 #), QT2100 (2 #), QT2100 (3 #), C6015 (4 #), C6018 (5 #) **** 5 tower cranes, 41 construction derricks (26 in use), 3 sets of 750 mixers, 1 set of 350 mixers, 120 kW engine, 1 set of 16m air compressor, 1 set of 120 kW engine. 1 set, 16m air compressor 1 set, 1 set of steel straightening machine, 3 sets of steel bending machine, 2 sets of steel cutting machine, 41 sets of construction derrick,

Detailed inspection results: tower crane QT2100 (1 #) standard section of the connecting bolts partially loose, need to be fastened; trolley main rope pulley anti-dislodgement device weld broken need to be replenished to restore the weld. Tower crane QT2100 (2 #) standard section connecting bolts individual loose, need to fasten; torque limiter failure, need to replace the limit switch, re-debugging settings; the total root rope card 3 crowded together, need to be installed according to the requirements of fastening. Tower crane QT2100 (3#) foundation water, need timely drainage. Tower crane C6015 (4 #)

tower standing pin steel instead of, individual standing pin is not in place, no cotter pin, slewing support and tower connecting pin 1 party no standing pin, 3 parties are not in place, need to be restored in accordance with the requirements of the installation; platform railing installation does not meet the requirements of the multiple no cleats, need to be installed in accordance with the requirements of the complementary; slewing and tower cap connecting bolts individual looseness, need to be fastened; crane crane crane lifting arm at 20m pin back, cotter pin deformation, need to be restored in place. The cotter pin is deformed, need to restore in place, replace the cotter pin; the root of the crane arm and the tower cap connecting the main pin cotter pin position is not enough, the pin is not the original match. Tower crane C6018 (5#) tower body standing pin on the cotter pin is incomplete, need to make up; foundation section climbing ladder fixed on one side without connection fixed, need to connect fixed; platform railing cleats are incomplete, individual railing is not equipped with cotter pins, need to install to make up for; moment adjustment data is too large, according to the provisions of the debugging settings. The project *** has 41 construction derricks, currently in use *** there are 26, in the inspection process we are in use of the 26 derricks were carefully and carefully viewed. No problems were found with the inspected steel bending machine, steel cutting machine, steel straightening machine and other small machinery, all normal. The overall condition of machinery and equipment is good, and the return rate of small equipment is low.

Comprehensive results of the above inspection, the use of machinery and equipment, management of the overall situation is good, but there are still many problems.

1, a comparison of the results of the inspection of the projects found that: the equipment of the joint project there are more problems, such as private objects card main torque limiters, slewing tower and tower cap connection bolt installation is incomplete and other issues, belonging to a serious violation of the rules of the operation; and self-employed project equipment, most of the problems are parts damage, equipment failure, and so on. This shows that there are big differences in the management style and management strength of our projects on equipment, and we should unify the management scale of each project on equipment, strengthen the management strength, strictly prohibit unauthorized operation, and eliminate all potential safety hazards. If found to have the above serious violations of the operation phenomenon, give the operator dismissed; project machine administrator to pay joint responsibility.

2, in the self-owned project equipment inspection, the regular inspection and maintenance of mechanical equipment of the project

maintenance is good, complete information. However, it is still found that there are common problems such as elevators with limiters failing, or cabs not equipped with fire extinguishers. Project engineers should always check and find solutions in time. At the same time, the project authorities should communicate with each other, communicate with each other, learn from each other, and improve the management of machinery and equipment as well as regular inspection and maintenance deficiencies.

In the future work, we should be strictly in accordance with the "regular maintenance and repair of machinery and equipment management system", "regular inspection of lifting machinery management system", regular inspection and maintenance, to eliminate all potential safety hazards and unauthorized operation, to ensure the safety of the project.

tower crane work summary 2

A year in the company's leadership under the correct command, in the 301 project manager, the security department 's direct leadership, their own mechanical safety management work has made certain achievements, on the state of the year's work to do a summary:

A knowledge of this project:

People's Liberation Army General Hospital outpatient emergency comprehensive building phase I project, located in Beijing Haidian District, Fuxing Road xx, underground 5 layers, local 6 layers, 15 floors above ground. The total construction area is about 310,000 square meters. Assigned by the company, from the Logistics College Wanshou Road project to the 301 project site, I y realize that the PLA General Hospital Outpatient and Emergency Complex Phase I project, is the key project of the whole army, is the central head of the health care place. At the same time, it is also a place for the people of the country to see a doctor. The deadline is tight, the progress is fast, and the quality is high. So I hold a correct working posture, sense of responsibility and responsibility for the company, the project and the project. Not afraid of pressure, heavy task to do their own work. Completion of the company's goals.

Two main work:

According to the company's security department, the overall arrangement of the project technology department, to ensure the smooth progress of construction, vertical transportation of the hanging times, the installation of this project 8 tower cranes, of which the QT27520 type tower cranes 4 (2 #, 5 #, 6 #, 8 #. STT153 type tower cranes 4 (1 #, 3 #, 4 #, 7 #, 8 #. STT153 type tower crane 4 sets (1#, 3#, 4#, 7#.

1, can seriously organize the tower crane orderly into the field, no matter day and night, do on call. Reasonable arrangement of tower crane installation work. Ensure that the tower crane installation safety and smooth.

2, according to the specified requirements to the supervisory unit reported to the tower crane information, rental qualifications, installation qualifications, tower crane installation review form, inspection reports and other related procedures, get the supervisor Wang Gong's praise.

3, to the crane leasing unit signed a crane management safety agreement, to the installation unit signed a crane installation agreement, to ensure that the procedures are complete.

4, do a good job on the tower division, signaling commanders safety education, ① tower division into the professional knowledge test, education rate of 100%. ② signaler command staff for professional knowledge test, education rate of 100%. ③ At the same time, the tower division, signaling commanders of special types of operating certificates to verify, register for the record, reported to the supervisory unit. ④ education tower division, signaling command staff to comply with the "ten not hanging" regulations, to eliminate illegal command, for construction production, as of the end of xx on the tower division, signaling command staff education up to 22 times, education is targeted.

5, can actively cooperate with the steel structure of the cross column, the installation of round column lifting work, and actively coordinate the operation of the tower crane lifting times. Reasonable arrangements for the actual situation of the construction site. In the case of a tower crane crane can not move, arrange two tower cranes at the same time for lifting, to ensure safety, to ensure the smooth progress of the construction.

6, according to the construction production progress, reasonable arrangements for tower crane anchoring buried work, welding work, tower crane buried, welding 21 times. Tower crane anchoring 29 channels.

7, supervise the tower crane unit every month to carry out a comprehensive inspection of the tower crane, strengthen the tower crane repair and maintenance work, found that the problem in a timely manner to rectify, solve the problem in place, do not leave any future problems.

8, group tower operation: the tower crane overlap more work area, pay attention to safety management at the same time. Coordination between tower cranes and tower cranes. Coordination between the signaler and the signaler. So as to improve and achieve the purpose of safe operation.

9, obey the leadership, obey the arrangement, complete all the work given by the leadership, unite the comrades, *** with progress.

Three problems:

1, lack of communication with the project production, lack of cooperation with the project technology.

2, in the coordination of the tower crane is not thoughtful enough.

Four next year's work arrangements:

1, continue to do a good job of tower crane lifting operations.

2, to strengthen the tower Division, signaling command staff safety education.

3, arrange and organize the demolition of the tower crane.

4, strengthen the construction elevator, basket and other mechanical equipment safety management.

A year in the work of the work has made gratifying achievements, safety work has been ensured. This is with the leadership of the project, the guidance of the Department of Safety, other departments are inseparable from the cooperation. I have the determination and confidence in the next year's work to continue to improve, do their jobs, complete the tasks assigned by the project leadership, for the safety work, machinery management work on another level.

Tower crane xx year work plan

1, continue to do a good job of tower crane lifting operations.

2, to strengthen the tower division, signaling command staff safety education.

3, arrange and organize the demolition of the tower crane.

4, strengthen the construction elevator, basket and other mechanical equipment safety management.

Without adequate planning and supervision, will lead to crane accidents, the resulting consequences can be disastrous, such as serious damage to property, and even cause casualties. A good lifting and hoisting operations plan can be very protective of the crane itself and of the people working near the crane.

The preparation of lifting and hoisting operations plan should be considered:

(1) to have a full understanding of their own conditions. Once it is determined that the need to use mobile cranes to lift loads, the lifting company needs to decide whether it has qualified personnel to prepare a safe operating plan for the lifting operation. Depending on the situation, you may choose to rent a crane for the lifting or contract out the lifting operation. Whether renting or contracting, a person needs to be appointed to take full control and responsibility for the planned lifting operation.

(2) visit the lifting site. The designated person needs to visit the planned lifting site to obtain all the necessary information, and thus a comprehensive understanding of the lifting operation requirements. A detailed and comprehensive written report on the load and the operation site is required after the visit, providing information on the type of load, its weight, dimensions, lifting points, the presence of concealments that affect the weight and stability of the load and that would be dangerous in the event of spillage, and the presence of collision hazards near the operation site and the condition of the ground at the operation site.

(3) Crane selection. The designated person should be very understanding of the crane, such as various types of crane lifting capacity and operating limits, crane operating mode, rated lifting capacity, crane specifications and weight and the calculated load of the outstretched leg. At the same time, the designated person and the crane supplier good relationship to obtain high-quality cranes and useful advice is essential.

(4) Lifting accessories are correctly selected and visually inspected before use.

(5) Staffing. The designated person can in some cases take on the responsibilities of the crane supervisor, the crane supervisor is responsible for carrying out the instructions of the designated person rather than giving instructions, one of the important roles is to stop the lifting operation when: do not understand what needs to be done lifting operation unplanned changes and doubts about the lifting operation and the safety of the people involved.