Summary of hydrological work

Time flies by, and a period of work has ended. Looking back on the work during this period, we must have achieved a lot of achievements. Let’s compile the past achievements into a work summary. Before writing, you can refer to the sample essays. The following is a summary of hydrological work that I collected for you (selected 5 articles). You are welcome to read it. I hope you will like it. Summary of hydrological work 1

In 20XX, the work of the institute will still be based on external scientific and technological consulting. The main tasks it is engaged in and completed include the following aspects:

1. Flood control evaluation

The flood control evaluation mainly focuses on completing projects contracted by the bureau. At the same time, it also actively explores the market and undertakes projects independently. The following were completed in 20XX:

(1) The review and acceptance of the Yellow River Crossing Flood Control Evaluation Report for the Wuhai Yinchuan Coke Oven Gas Transmission Project.

(2) Compilation and revision of the Linyi Yellow River Bridge flood control evaluation report.

(3) Contact and report preparation for the ongoing Youhe Meander Yellow River Bridge project. The projects participated in and contacted include:

(1) Liaison and contract signing for the flood control evaluation project of the cross-river bridge on the expressway from Yuekou to Qilicun in Yan'an.

(2) Contact us for the gas pipeline burial flood prevention evaluation project. The contract for this project has been basically finalized and is waiting to be signed.

Projects that have participated in the contact work but whose work has not yet been decided include:

(1) Flood control evaluation of Yongji water supply project.

(2) Flood control evaluation of Mianyuan Expressway bridges.

(3) Flood control evaluation bid for Xi’an Xianyang Ring Expressway.

2. Reservoir Operation Analysis

(1) Completed the preparation and acceptance of the Sanmenxia Reservoir Operation Analysis Report in 20XX.

(2) Undertaken the 20XX reservoir operation analysis project.

3. Water balance test

Completed two water balance test tasks contracted by the company office.

IV. Other cooperative scientific research projects

(1) There are cooperation projects with the Yellow Academy of Sciences (ask General Manager Gao).

(2) Participated in the analysis and claim work of the impact of the construction of the Yumenkou Railway Bridge on the sedimentation section test of the Longmen Hydrological Station.

(3) Participated in the liaison work of the Daxi High-Speed ??Railway Water Information and Flood Project.

(4) Followed up the Hukou Bridge water information and flood work. Hydrological work summary 2

1. Serve the overall situation, serve the people, and contribute to flood control and flood control.

Flood control is not only related to the safety of Shaoneng Group’s three power station dams, but also related to the safety of people’s lives and property on both sides of the Lei River. The city's annual flood control plan is made by them personally, and it is also dispatched by them personally. They always know when the flood will come and how big the peak will be, and report it to the company leaders and the city's Flood Control Office leaders in a timely manner. Over the past few years, work in this area has been well received by the city and Hengyang City.

2. Strengthen employee business training and provide hard-working leaders.

Although hydrological dispatchers sit in front of office computers, their work is actually monotonous. They deal with hydrological figures every day and work 24 hours a day. Therefore, few people want to take this position. At the beginning of 20xx, two people left at once, resulting in a lack of technical strength. At the critical moment, Comrade Xie Jiefeng was appointed to shoulder the important task of squad leader. While working consecutive shifts, she followed two novices to work and imparted business and technical knowledge. She also formulated a flood control plan for Leihe River on time and actively prepared for flood control. After six months of intensive training, two apprentices who had no previous knowledge of hydrological dispatch were brought out. This year, although the hydrological dispatching department has experienced personnel changes, there has not been a single incident of water abandonment due to errors or flooding affecting the property and life safety of people on both sides of the Lei River.

3. Work conscientiously, without any regrets, and work silently to maximize the benefits of the power station.

There are only 6 people in the hydrological dispatching class, and only one person in each class is on duty to regulate the power generation efficiency of the three power stations.

They have learned a lot of experience: first, reducing the water consumption rate of power generation through dispatching; second, vacating the storage capacity before the flood arrives and blocking the peak and tail of the flood to improve water utilization; third, taking advantage of the peak and valley periods of electricity consumption, carefully design and adjust the storage water level to maximize benefits. change. Through these measures, very considerable economic benefits were created for the three power stations in 20xx. Hydrological work summary 3

1. Summary of geological survey and water prevention and control work

(1) Water prevention and control engineering design:

1. Preparation of geological survey and water prevention and control in 20XX 1 work plan.

2. Prepare 3 designs for the downhill water exploration and release of Nanyi No. 5 coal conveyor.

3. Prepare a water exploration and drainage design for the water accumulation in the North No. 3 coal return air tunnel.

4. Prepare 2 copies of 21502 transportation and return tunnel water exploration and drainage designs.

5. Prepare a karst water damage control plan for the +150 street roof.

6. Prepare a gray water detection design for the floor of the 1101 mining working face.

7. Prepare a water damage control plan for the 1101 mining working face.

8. Prepare a water prevention and control plan for the 21502 fully mechanized mining face.

9. Prepare a water damage control plan for the goaf area of ??21502 fully mechanized mining face.

(2) Water release project

1. Completed three water release projects down the mountain at the boundary of Nan No. 1 coal, 5 boreholes were drilled, the drilling footage was 180m, and the overlying 3 #There is 120m of water accumulated in the roadway downhill from the coal return air.

2. The water exploration and drainage project of the No. 3 coal return air alley in North 2 was completed. One construction hole was drilled with a depth of 16m, and the regulations on water prevention and control were implemented.

3. Exploration and release of accumulated water in the 3# coal goaf overlying the 21502 fully mechanized mining working face, 5 boreholes were designed and constructed in the return tunnel, the drilling footage was 300m, and 6000m of accumulated water was released by gravity.

(3) Construction of the 11# coal seam hydrogeological re-exploration borehole in Bei No. 1 mining area (***designed 6 boreholes)

1# borehole: drilling construction completed , passed the acceptance. (40m to the north of 2514 tunnel)

2# borehole: The borehole has been constructed for 34m and is scheduled to be completed in early October (North No. 5 coal centralized lifting inclined tunnel)

3# drilling: The equipment has been moved to the drilling site and is ready for construction. It is planned to be completed in early October. (+150 Daxiang Laobei Mining Substation)

4# drilling: The drilling construction was completed and passed the acceptance inspection. (North No. 2 Track Lane)

5# drilling: The drilling construction was completed and the acceptance was passed.

6# drilling: drilling construction is completed. (12302 Transport Lane) The elevated areas of the above boreholes will be sealed. (4) Water damage prevention and control in mining working face 1. 21502 fully mechanized mining working face:

(1) Install two 6-inch and one 4-inch drainage pipes in the return air lane, equipped with two 55-kilowatt drainage pumps , plans such as pulling ditches and burying artesian pipes in some areas were carried out. Several on-site follow-up surveys were carried out, and the current water inflow rate at the working face was 10-20m/h.

(2) Construct a retaining wall 7m inward from the opening point of the coal belt conveyor conveyor alley on South No. 1 No. 1 uphill from the boundary return air, and bury 3 times of 6 inches of water. Pipes, 2 runs of 4-inch drainage pipes, the working face has reached the thin coal belt and the mining line has been stopped, and it is being moved and installed. Water damage has no impact on the safe mining of the working face.

2. 21501, 12301, and 2514 mining working faces:

In the early stage of the above working faces, water storage tanks, drainage pipelines were installed, drainage pumps were installed, and other projects were completed. The water inrush is small and has no impact on the safety water tank.

(5) Water damage prevention and control in the excavation working face

(1) Hydrogeological investigation of the excavation working face in the 21306 transport tunnel and return air tunnel.

(2) Investigation of water hazard prevention and control in the 11# coal main return air tunnel and 11# coal water bunker excavation working face in the north mining area.

(3) Hydrogeological investigation of the downhill excavation working face of Nanyi No. 5 coal boundary conveyor.

(4) Hydrogeological survey of the +150 south mining drainage tunnel excavation working face.

5. Completed 8 mining face safety assessment reports

6. 11# coal water prevention and geophysical prospecting work

(1) 11# coal system water The construction of Cangzheng and auxiliary water warehouses has been completed.

(2) Completed one electrical detection of the 11# coal main return air tunnel.

(3) The 12301 working face was exposed once.

(4) The 12302 working face was exposed once.

(5) The 21502 working face was exposed once.

(6) The 1101 working face was exposed once.

(7) 1101 working surface audio and electrical detection once.

(8) Adhere to the electrophysical prospecting and drilling verification work of the 11# coal excavation working face.

7. Participate in one rainy season three-prevention survey organized by the dispatching room.

8. Investigation of small coal mines. According to the requirements of relevant documents, we organize a monthly investigation of hidden dangers in surrounding small coal mines and an investigation of land cracks in ground villages.

9. Surface land and village survey

Go to Yanjiaping Village, Jiajia Ge Lao, Xingjia Ge Lao, Duan Jialing, and the corresponding villages in the South No. 2 mining area to conduct surveys. and submit a report.

10. Standardization of quality assessment on a thousand-point scale (monthly)

(1) Complete a monthly assessment of safety production risks of the mine geological survey and water prevention and control system and a summary of the previous month.

(2) Complete safety hazard inspections in the mine geological survey department *** 3 times every ten days, distribute the hazards to the district team, submit 3 hazard summaries, and submit 1 summary at the end of the month to the Safety Supervision Department .

(3) Complete a monthly forecast of mine geological survey and water prevention.

(4) Complete one copy each of the monthly work focus of mine geological survey and underwater prevention and control, monthly forecast, and work summary of the month.

(5) Complete 4 weekly analyzes of mine geological survey, water and hydrogeology.

(6) Complete 1 copy of the mine geological survey professional hazard source identification reminder sheet.

(7) Complete 1 copy of the mine geological survey professional assessment ledger.

(6) Problems in water prevention and control through ground survey:

1. Nanyi No. 5 coal belt conveyor alley:

(1) Water retaining wall Requires grouting reinforcement.

(2) Install at least two 6-inch drainage pipes in the Nanyi No. 5 coal conveyor alley, with a single length of 2250m. Equipped with 55kW drainage pump.

(3) Construction of two 30m3 water tanks.

2. Water prevention and control work in the early stage of mining at the 1101 mining face of the 11# coal seam

(1) Installation, commissioning, operation and acceptance of the water tank drainage pump and drainage pipeline of the 11# coal system .

(2) Expansion of approximately 2,400m of ditch between +250 New Taipei Street and +250 main drainage pump room.

(3) Clearing and excavation of about 1000m of ditches in the 11# coal system water bunker in the 11# coal machine rail transport lane.

(4) The 1101 mining surface floor was tested with the Austrian gray water audio method to detect three prominent abnormal areas, and 14 exploration and verification boreholes were designed to be constructed.

3. The +150 main drainage pump has not been put into joint trial operation once a year:

Since the Banqiao sewage treatment tank has a small capacity and a new treatment tank is under construction, the sewage treatment tank should be accelerated. construction.

4. 11# coal seam hydrogeological supplementary exploration drilling construction:

(1) Speed ??up the joint water release trial operation of the 11# coal hydrogeological supplementary exploration drilling.

(2) Accelerate the sealing of the elevated area of ??the 11# coal seam supplementary exploration drilling site. Summary of hydrological work 4

1. Make various preparations before the flood

According to the hydrological work and hydrological test tasks in 20XX, based on the work of preventing major floods and fighting drought Requirements: arrange early, prepare early, organize carefully, and prepare for the pre-flood test.

Before the flood, the hydrological testing instruments and equipment of 12 water and rainfall stations and 5 groundwater stations in the region were maintained, focusing on the debugging of water levels, rain gauges, flow meters, etc. to ensure normal operation; the flood monitoring of Wangjiangjing Station and Xincheng Station was completed The front water gauge zero point elevation was measured; large-section measurements were completed at four base stations and two patrol lines, and flow measurement marks were made to further provide accurate hydrological data for flood control and drought relief to ensure safe passage through the flood season this year.

2. Complete the data compilation work

The compilation of hydrological survey data is an important business task of our station. According to the requirements of relevant standards such as "Hydrological Survey Standards", "Hydrological Data Compilation Standards", "Measurement Station Mission Statement" and other relevant standards, corresponding data compilation methods have been formulated. Strictly follow the three-character work policy of "strictness, accuracy and speed", strictly implement "one calculation and two calibrations", and accurately every hydrological data. The collection, calculation, review, and compilation of groundwater data, hydrological area and patrol data from January to May in 20XX were successfully completed, and reported to the Provincial Hydrology Management Center in a timely manner.

3. Complete the hydrological test work

Carefully carry out the flow measurement operations of the two patrol lines and the Doppler comparison of the four base stations. Up to now, *** has conducted 7 inter-provincial patrol line tests (19 patrol sections), strictly ensuring the accuracy and rationality of each measurement data.

4. Do a good job in safety production

Comprehensively implement and strengthen safety production work, actively organize personnel to learn safety production-related knowledge, and strengthen safety production awareness. Regularly conduct safety production inspections on grassroots hydrological measuring stations, implement rectifications and strengthen publicity for discovered safety hazards, so as to ensure safe floods.

5. Standardized operation and management of hydrological measuring stations

The national basic stations Wangjiangjing Station and Xincheng Station conduct manual observations every day according to the specifications, record precipitation and water levels, and send hydrological data in a timely manner Report to the Provincial Hydrological Management Center; strictly implement the 24-hour duty system during flood season reporting and emergency response; and do a good job in standardized management of hydrological measuring stations.

6. Progress of the Hydrological and Flood Control "5+1" Project

According to the "five major projects" and "making up for shortcomings" tasks issued by the Provincial Department of Water Resources, the project was completed in May The bidding was completed on the 19th, and the winning bid price was 1.1865 million yuan. Currently, according to the provincial and government construction schedule, the installation of 2 sets of super-standard flood artificial water gauges and 2 "four additional equipment" tasks have been successfully completed, and the remaining project tasks are being progressed in an orderly manner. . Work plan for the second half of 20XX

1. Do a good job in flood reporting during the flood season

Hydrological information forecasting is still the top priority of hydrological work. According to the flood reporting task book, our station Relevant requirements must be fulfilled to "calculate at any time, report at any time, sort out and analyze at any time", "report correctly, not late, not missing, and not omit reporting". During the flood season, personnel will be on duty 24 hours a day, striving for "zero errors" Successfully completed the flood reporting task during the flood season.

2. Keep abreast of the progress of the hydrological and flood control "5+1" project

According to the "five major projects" and "making up for shortcomings" tasks issued by the Provincial Department of Water Resources, on July 15 The construction tasks of the new Gaozhao Station, the reconstruction of Xincheng Station, and the "three double guarantees" of Wangjiangjing Station have been completed recently; tasks such as groundwater standardization improvement and water quality monitoring, measurement station appearance and facility improvement, and leveling point elevation measurement have been completed by November. We will scientifically and rationally grasp the construction tasks, further enhance the flood prevention capabilities of our district's hydrological survey stations, and strive to provide data support for our district's flood prevention, typhoon prevention, and drought relief work.

3. Do a good job in the compilation of hydrological data

According to the requirements of "reporting once every quarter" of hydrological data of the Provincial Hydrological Management Center, in accordance with the "Hydrological Test Standards" and "Hydrological Data Compilation Standards" , "Measurement Station Mission Statement" and other relevant specifications, strictly follow the three-character work policy of "strictness, accuracy, and speed", and strictly implement "one calculation and two calibrations" for every hydrological data. Complete the summary, calculation, review and compilation of groundwater, hydrological area and patrol data in a timely manner and report to the Provincial Hydrological Management Center.

IV. Earnestly complete the daily work of hydrological stations

Strengthen the daily management and maintenance of hydrological facilities at each hydrological station during and after floods to ensure the provision of accurate data for flood prevention, typhoon prevention and other work ; Continue to do a good job in daily testing of two patrol lines at four base stations; continue to do a good job in daily observation, recording and telemetry of water levels and rainfall at two national basic stations, and timely compare and report daily data to ensure zero errors. Article source: Tianshui Geology Work Summary 5

During the 20xx flood season, with the care and support of the leaders of the Survey Bureau and the joint efforts of all station staff, various forecasting and reporting tasks were successfully completed. Now The work during the flood season is summarized as follows:

1. Strengthen the management of the measuring station and establish a sense of ownership

This year, the station focused on strengthening the work at the beginning of the month and the end-of-month summary, and put every item into consideration. Tasks are quantified to individuals, so that division of labor is clear and responsibilities are implemented. Remind each other of deficiencies in the work and correct them in time. Everyone's consciousness, enthusiasm and initiative are constantly improving, and everyone's cohesion is also constantly enhanced. It truly reflects the team spirit of taking the station as home, being dedicated to the job, and uniting and forging ahead.

Insist on holding monthly symposiums so that everyone has the opportunity to speak freely, express their opinions, express their own ideas and suggestions, enhance the sense of ownership and responsibility, and communicate more with colleagues to be kind to others. , live in harmony, and work together to create a harmonious working atmosphere.

2. Strengthen safety awareness and be responsible for your own life

Measuring stations are the front line of hydrological work. The forecasting and reporting work directly deals with flood waves and has certain risks. As the Bajiahu Hydrological Station, the testing facilities were inspected, repaired and maintained before and after the flood, and the personal safety protection equipment was relatively complete. However, in the early stage, the employees did not fully realize the importance of production safety mentally, especially for Not enough attention has been paid to the potential safety hazards at the work site, because as a narrow river in a mountainous area, the water flow is fast, the floods are serious, and the flow speed on the shore is high, so the shore protection measures are not in place. In addition, it is also dangerous to observe the water level and water temperature at close range during floods. In addition, the newly added channel sections this year are operated on a measuring bridge. The height of the measuring bridge is relatively short and the risk is high. After our station promptly reported this situation, it attracted great attention from the leaders of the bureau. In order to ensure the safety of the observation station, the leaders of the bureau used two days on August 14th and 17th to personally go to our station to repair the hidden dangers. The two observation sections have solved the problem of potential safety hazards and also ideologically improved the safety awareness of all station personnel.

3. Strengthen water regime forecasting and comprehensively complete testing tasks

Although the water volume this year is small, the water level of the main river changes greatly, especially during the main flood season, from 18:00 to 20:00 every afternoon. Around 0:00, the water begins to rise, reaching the maximum level from 10 o'clock at night to 0:00 in the morning. For safety reasons at night, only gay men can be arranged to be on duty. When the self-recording well cannot be used normally, through careful analysis, we have a better grasp of each day. The changing process of daily water level. In case of heavy rain or water regime, our station will promptly report the changes in water regime and the rising process of flood peak to the Jingou River Management Office, Shawan County Flood Control Office, Jinmao every half hour or one hour. Power Generation Co., Ltd. and other units report accurately. At 10 o'clock in the night on August 2, a warning flow occurred in the Jingou River, with a peak flow of 88.7m3/s. The downstream water conservancy project did not suffer any losses. This was recognized by the leaders of the Jingou River Management Office. Secretary Wang, the leader of the Jingou River Management Office , Director Jiang and his entourage personally visited the station to express their condolences and express their gratitude. At the same time, Jinmao Power Generation Co., Ltd. also sent condolences and gave high praise to the work done by our station.

When new problems are encountered in hydrological forecasting, data calculation, etc., such as river trunks, canal trunks, power station amplitude modulation, synthetic flow, and upstream construction, they can be reported to the business department and water regime department in a timely manner. Under the guidance of the department staff and the unremitting efforts of our station staff, the water, flow, and sand testing tasks in 20xx were all exceeded, and the monthly data of the main flood season were all excellent after being reviewed by the business department. There were no errors in the water regime forecasting during the entire flood season, and the water regime service contract tasks signed by our bureau with the Jingou River Management Office and the Shawan Flood Control Office were successfully completed during the year.

4. Strengthen environmental construction and improve employees’ lives

In daily life, everyone always maintains a clean and tidy environment at the measuring station.

The environmental construction of the measuring station is equally important as the measuring and reporting work. For this reason, the measuring station arranges a duty day for each employee, regularly cleaning indoors and outdoors, pulling weeds and hoeing the ground, and wiping doors and windows. Everyone can complete it consciously.

In order to improve everyone’s living environment, everyone worked together to overcome all difficulties to beautify their homes, expand vegetable planting varieties, and improve everyone’s lives. At the end of August, with the concern of the bureau leaders, the renovation project of dilapidated old buildings in our station was officially launched. During this period, our station staff actively assisted in supervision and carried out the work. At present, the main project has been basically completed.

In order to enrich everyone’s spiritual and cultural life, our website opened a broadband network in early June. The bureau leaders also subsidized the broadband expenses of our station accordingly. They also sent us a lot of fitness equipment and various books during the flood season, which made the monotonous life at the station more colorful, broadened our horizons, and made us better able to adapt to the development and changes of the times. The whole site has formed a positive spiritual outlook.

In 20xx, under the circumstances of having few staff and busy flood season forecasting and reporting work, the Eight Households carried forward the team spirit and completed various tasks well. Since I was the first person to come to the Eight Households Bajiahu Station has shortcomings both in terms of business and management, and Bajiahu Station has a glorious history in the past and is a banner of our bureau. This gave me a lot of pressure and also gave me a lot of pressure. Big motivation. I hope that in future work, I can maintain the fine traditions of the Bajiahu Station, and at the same time learn the characteristics of the brother stations, and contribute to the development of Shihezi Bureau!