Machining emergency plan
In the study, work and even life, it is unlikely to encounter some unexpected events or accidents, in order to minimize the harm, it is always necessary to pre-prepare an emergency plan. Preparation of emergency plans need to pay attention to what problems? The following is my help to organize the machining emergency plan, only for reference, we take a look at it.
Machining emergency plan 1
To effectively prevent the occurrence of sudden mechanical equipment accidents, minimize accidental injury, combined with the characteristics of the project, the development of this plan.
First, each unit should strengthen the leadership of the safety of machinery and equipment, and regularly organize operators to learn the operating procedures, improve the awareness of safe production, check the equipment failure, find the problem, correct it in a timely manner, and eliminate hidden dangers.
Second, the units of machinery and equipment operators must hold the relevant departments issued by the operating license, and familiar with the structure of the equipment, principles, performance and safety requirements, operators are strictly prohibited from operating in violation of the mechanical equipment with "sick" operation.
Third, emergency rescue measures
1, leakage electrocution. If the mechanical equipment leakage electrocution phenomenon, the person concerned should be promptly reported to the person in charge of the work area or emergency team to take effective rescue measures. If the operator is electrocuted, the electrocuted person should be detached from the power supply as soon as possible to implement rescue.
2, brake failure. Brake failure when going uphill, can not take off the gear, let go of the gas pedal, pull over, turn off the engine, use the hand brake to stop the car, and then find someone to hit the eye. Downhill when the brake failure, hanging low gear driving, can not turn off the engine, driving to the side, driving to a flat place will be the engine off, the use of the hand brake to stop the car, and then find someone to hit the eye.
3, lifting equipment accidents. When lifting equipment accidents, immediately evacuate the site personnel quickly, notify the emergency rescue team, and organize personnel to deal with the derrick, electric hoist (winch), coupling safety hazards.
Fourth, emergency procedures
1, after the occurrence of the accident, the person concerned should immediately report to the person in charge of the scene, the accident report time shall not exceed one hour after the accident. The content of the report is the time of the accident, location, unit, a brief description of the accident, the number of casualties, the preliminary estimate of direct economic losses and emergency measures that have been taken. At the same time, quickly contact 119, 120 to deal with the accident scene.
2, immediately start the emergency rescue plan, set up on-site rescue team, the implementation of on-site rescue work and investigation and treatment. Accident occurred in the relevant units must strictly protect the scene of the accident, and take the necessary measures to rescue people and property, to prevent the accident from expanding and aggravating the loss, indeed, because of the rescue need to move the scene objects, must make signs, photographs, detailed records and draw the scene map, and properly save the scene of the main traces, physical evidence.
3, the scene of a major accident rescue group arrived, according to the provincial command of the Emergency Rescue Site Command, in accordance with the division of responsibilities, immediately carry out rescue work, listen to the report of the accident unit, analyze the cause of the accident, develop rescue programs, and organize and implement according to the division of labor.
machining emergency plan 2I. Hazardous features:
1. unauthorized operation of the packaging machine, manipulator;
2. the switch is not flexible
Second, the current control situation:
1. operators are unfamiliar with the operating procedures
2. plus protective care
p> Third, the scenario hypothesis:
Reach into the packaging machine to send touch, accidentally cut your fingers.
Fourth, emergency:
1. Immediately issued an emergency call for help, emergency team members quickly into the room of the director of the duty to take medical equipment, bandage the wound.
2. Notify the head of each department to organize the emergency personnel sent to the hospital to deal with wounds.
3. Workshop supervisor to fill in the accident occurred (year, month, day, shift) through.
4. Reported to the General Manager's Office.
5. Find the root cause of the accident.
6. To analyze the typical factors of unsafe production behavior.
7. For the production safety precautions are emphasized in the pre-shift and post-shift meetings to strengthen the awareness of employees.
Machining Emergency Plan 3
I. Purpose: In order to make the construction site machinery and equipment in a comprehensive environmental protection, occupational safety and health management system under the guidance of a good state of operation, give full play to the effectiveness of the equipment, prevention and reduction of accidents due to the mechanization of equipment may produce. Consequences, to ensure the safety of personnel and property.
Second, the site applies to the major mechanized equipment accidents and other sudden mechanical injury accidents.
Third, the accident emergency disposal leading group
Leader:
Deputy leader:
Members:
Fourth, the specialized groups
1, the person in charge of the accident command group:
2, the person in charge of the accident scene salvage group:
3, the accident scene cleanup group:
4, the accident Rescue group in charge:
5, the cause of the accident investigation and treatment group in charge:
V. Duties
1, accident command group: fully responsible for the command and coordination of the accident handling, to the higher authorities and relevant departments to report in a timely manner, such as mechanical equipment accidents damage to power supply and communication related departments of the facilities, the organization of salvage.
2, the accident scene rescue group: responsible for sudden mechanical accident scene casualty rescue. At the same time should cut off the power supply, fire (in addition to leaving the necessary lighting at night) rescue, in order to quickly sent to the nearest hospital for treatment, such as too late to evacuate, should immediately call the "120" emergency center for help.
3, the accident scene cleanup group: responsible for the first-hand information collection, to carry out the cleanup of the scene of the accident, troubleshooting work, and as soon as possible to restore the original appearance of production.
4, the accident rescue group: responsible for the injured sent to the hospital, family reception and other work.
5, the cause of the accident investigation and treatment group: responsible for the scene of the sudden mechanical equipment accidents first-hand information forensics, collection, after obtaining the first-hand information of the groups, the organization of the relevant personnel to carry out the accident analysis, divided into the size of the responsibility, come up with treatment opinions, and convene an expanded analysis of the accident will be advertised to the results of the treatment, and finally seal the reserve case.
Six, emergency telephone
Company leaders:
City Emergency Center: 120
Telecom repair: 112
;