As knowledge of the law spreads, contracts are becoming more and more versatile and can enjoy a certain amount of freedom when it comes to reaching an agreement. So what is the common contract book like? The following is a simple contract model for maintenance contracting (common 6) that I have organized for you, just for reference, I hope it can help you.
Simple Contract for Maintenance Contracting 1Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In order to solve the leakage of Party A's house and rain leakage and related problems brought about by the leakage of the rain, Party A and Party B reached an agreement based on equality, voluntariness, and consensus, and signed the following agreement, to ensure that both parties *** with the compliance with the implementation:
1 Maintenance standards: maintenance of the house must be in order to ensure that does not affect the party living safety, normal living under the premise. Maintenance project: the roof waterproofing, indoor rain leakage caused by peeling, paint loss of the room walls, roof maintenance. Maintenance costs: maintenance of all costs incurred by party B.
2, maintenance requirements:
(1) Party B notify Party A one week in advance of the maintenance time, so that Party A is ready.
(2) Party B will use Party A's designated brand of latex paint in accordance with Party A's requirements when repairing, and repair according to the regular residents' indoor wall decoration process.
(3) Party B is responsible for cleaning up the garbage and sundries brought about by the maintenance.
(4) Party B should compensate for damage to Party A's goods in the repair process in accordance with the current market price.
(5) The details are not exhaustive, Party A proposed program, discussion to determine.
3, maintenance period: in normal weather days to complete, otherwise, the delay in accordance with the standard of 50 yuan per day compensation for Party A's loss of work.
4, maintenance period: from the date of signing the contract, to the year Party B must be completed within the contract period of maintenance.
5, Party A requires Party B to perform according to the contract, Party B has not fulfilled its obligations, Party A has the right to refuse to pay the property fee until the house leakage and rain leakage brought about by the relevant issues are completely resolved, and then make up the property fee.
6, such as this repair, the house again leakage, Party B should be in accordance with the requirements of Party A, continue to repair until the problem is solved.
This contract is not exhaustive, signed by the two sides after consultation with the supplementary agreement (attached), and this contract has the same legal effect.
This contract shall enter into force after both parties sign and seal it, in duplicate, one for each party.
Supplementary Agreement:
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ year ____ month ____ day _________ ____ ____
Simple Contract for Maintenance Contracting2Party A:
Representative:
Address:
Party B:
Representative:
Place:
Party B accepts the commission of Party A. Party B, for the purpose of guaranteeing the normal use of Party A's LED electronic screen, Party A's The agreement equipment for maintenance, repair services, in order to protect the legitimate rights and interests of Party A and Party B, according to the "Chinese People's *** and State Contract Law", Party A and Party B signed this agreement through friendly consultation. Before signing the agreement for the first time, the equipment should be used normally before signing the agreement.
The contract period: the limited period of this contract for years, from the date of the year to the end of the year.
Article B obligations
1. Party B according to Party A's agreement equipment failure repair notice, Party B priority arrangements for door-to-door maintenance. Party B arrived at the scene within 24 hours.
2. Party B door-to-door repair does not charge door-to-door fees and labor costs.
3. There is no limitation on the number of times Party B can repair.
4. Party B repair only charges for spare parts, and to ensure that the cost of spare parts is flat or lower than the manufacturer's uniform price.
5. Party B for Party A to provide replacement parts must ensure that the original parts, if there are special circumstances, Party B needs to be in consultation with Party A agreed to replace the original parts with the application of functionality and technical specifications of similar parts.
6. If the parts replaced by Party B for Party A are damaged during the three-month warranty period, Party B shall replace and repair them for Party A free of charge.
7. Party B develops equipment maintenance plan according to Party A's contracted equipment and reports to Party A. In the absence of Party A's repair notification, Party B will not be able to maintain the equipment. In the absence of Party A repair notification, Party B according to the maintenance program, Party A contract equipment for door-to-door maintenance. Under normal circumstances, every four months a door-to-door maintenance service.
Article 2 Obligations of Party A
1. Party A will notify Party B in a timely manner after the failure of the agreed equipment.
2. Party A can not use without Party B's approval, non-original spare parts, consumables, or equipment failure, Party B is not responsible.
3. Without Party B's approval, Party A shall not invite the third party to carry out maintenance on the agreed equipment, or Party B shall not be responsible for the consequences and responsibilities arising therefrom.
4. Party A shall not disassemble the contract equipment privately, or Party A shall bear all the losses caused.
5. Agreement equipment contract failure, the need to replace parts, Party A bear the cost of accessories.
6. Agreement on the transfer of equipment or transfer, Party A should promptly notify Party B.
Article III Settlement amount and method
1. Party A by the year as a unit of time, the maintenance fee *** counted as yuan RMB, within one week after the agreement is signed into effect, a one-time payment of maintenance to Party B.
Party A (seal):
Legal representative (signature):
Year month
Party B (seal):
Legal representative (signature):
Year month
Maintenance contracting a simple contract 3Party A: (hereinafter referred to as Party A) _________
Party B: ( (hereinafter referred to as Party B) _________
According to the "Regulations on Contracting for Construction and Installation Works" and other relevant rules and regulations, in order to protect the legitimate rights and interests of both parties, combined with the specific circumstances of the project, by the two sides *** with the same consultation, Party A will be the Neijiang City, Neijiang City, the sixth elementary school housing maintenance project contracted to Party B for decorative design and construction. The two sides reached the following agreement, *** with compliance.
First, the project address: Neijiang City, the sixth school.
Second, the name of the project: Neijiang City, the sixth elementary school building maintenance project.
Third, the nature of the project contract: double package, that is, the package labor and materials.
Fourth, the project: multi-functional classroom repair and decoration.
V. Total cost of the project: _________ yuan (capitals: _________)
VI. Construction period: days, from _________ _________ month _________ to _________ _________ month _________ day.
VII. Responsibilities of both parties:
1. Party A is responsible for providing water and electricity projects.
2. Party B is responsible for the construction of the construction program as determined by Party A.
3. Party A is responsible for the utilities used by Party B during the construction period.
4, in the construction process of all safety accidents are Party B is responsible for, Party A does not bear any responsibility.
Eight, on the material supply agreement:
1, Party B to provide materials should be in line with the design requirements of qualified products, and should be supplied to the site on time, by Party A acceptance confirmation.
2, Party B supplied materials, equipment, such as does not meet the quality requirements or specifications have differences, should be prohibited from use. If B use, the damage caused to the project by Party B is responsible for.
IX. Payment: After the project payment is allocated to Party A, Party A will allocate the project payment to Party B in a timely manner
X. The agreement on the quality of the project:
1. The quality accidents are caused by Party B, and its reworking cost will be borne by Party B. The duration of the project will remain unchanged.
2, the construction process, Party A put forward design modifications and increase or decrease the project must be contacted in advance with Party B, after the signing of the project change order, before the construction of the project, and the completion date of the two sides by Party A to re-agree. Party A shall be responsible for all the consequences caused by the change of the construction content agreed between Party A and the workers privately. Party A shall compensate Party B for any loss caused by this.
XI, the production safety and fire prevention agreement: Party A to provide the construction instructions and construction sites should meet the requirements of fire prevention and prevention, mainly including electrical lines, gas pipelines, water and other pipelines are smooth and qualified, Party B in the construction should take the necessary safety protection and fire protection measures to protect the safety of the operators and adjacent residents to prevent the occurrence of related accidents.
XII, the warranty period of one year, such as Party B's construction or Party B to provide materials caused by the quality of the problem, maintenance materials and labor costs paid by Party B; such as materials provided by Party A or improper use of the materials caused by. If the loss is caused by improper use of materials provided by Party A, Party A will be responsible for the labor and material costs.
xiii, the agreement in duplicate, a, b, both sides of a, signed by both parties to produce legal effect, both parties must *** with compliance.
Party A (official seal): _________
Party B (official seal): _________
Legal representative (signature): _________
Legal representative (signature): _________
_________ year ____ month ____ date
Simple Contract for Maintenance Contracting4Construction unit: _______ (Party A)
Contractor: _______ (Party B)
In order to better build a new countryside, in order to continue to improve the village village through the project, according to the actual situation within the village of Party A, by the support of the village and village committees to study the proposed hardening of the road in the near future will be _______.
The two sides negotiated to contract the project to _______ (Party B) to carry out the construction, and the establishment of the contract terms are as follows:
First, the project two sections of the road total factory about _______ meters, wide according to the actual topography, (about _______ meters), the thickness of the construction according to _______ meters.
Second, this project uses the roadbed above the bottom layer, by Party B according to Party A's design leveling compaction, cast-in-place concrete method of construction, concrete standard bit C20, cement using _______ standard has not expired and to the full month of cement, stone particle size does not exceed _______mm, using body net slag sand, never allow cutting corners, or else caused by all the bad consequences Party B is fully responsible for.
Third, the project is scheduled to _______ _______ month _______ day to _______ _______ month _______ day, after the construction period of _______ months.
Party B shall not postpone the completion date due to limited construction period, insufficient manpower, and incomplete equipment (except for special circumstances that are irresistible to manpower).
Fourth, the determination of the project payment is based on the payment of _______ yuan per square meter (including labor, materials, water and electricity, freight, machinery and equipment, including the leveling of the roadbed, etc., but the clearing of the roadbed more than _______ thickness, the village committee is responsible for the responsibility to bear.) According to the completion of the actual acceptance of the total amount of square meters.
V. Quality Supervision: During the project, Party A will send special _______ and other two people to carry out quality supervision, Party B must be strictly in accordance with the project specific design standard methods of construction, unconditional obedience to Party A supervisors of the correct guidance and supervision.
Six, the payment method: Party B advances all the costs of the work period, after the end of the work period, by Party A acceptance of six months after payment, but stay three thousand yuan quality deposit, warranty period after the return to the party.
If within one year, the pavement has quality problems, Party B self-financing raw material funds to repair, the cost is borne by Party B itself.
VII, safety responsibility: Party A must set up the concept of safety first construction, to ensure safety without accidents, such as the occurrence of unsafe accidents, medical costs in _______ yuan (including _______ yuan) by Party B self-care, more than _______ yuan (excluding _______ yuan), Party A is responsible for the payment of Party B casualty medical payment of _______%, and the rest of the medical The rest of the medical expenses shall be taken care of by Party B.
VIII, this contract in triplicate, A, B and the two sides of the town of a copy of the management station.
IX. This contract is effective from the date of signing.
Establishment of the contract between the two parties: _______ construction unit: _______
Legal representative:
Contractor:
_______ year _______ month _______
Simple Contract for Maintenance Contracting 5Offererer: __________________ (hereinafter referred to as) Party A)
Contractor: __________________ (hereinafter referred to as Party B)
In order to clarify the responsibilities and complete the construction tasks of the maintenance project of __________________ on time in terms of quality, quantity and quantity, in accordance with the "Contract Law of the People's Republic of China*** and the State of China" and the "Regulations on Contracting for Construction and Installation Works", combined with the project's Specific circumstances, the two sides agreed to sign the following terms, *** with the observance of:
First, the project name: warehouse maintenance project
Second, the contract price: one million eight hundred and fifty-five thousand nine hundred and ninety-eight dollars and three corners and one cent (¥: 185,198.31)
Third, the contracting method: the whole package.
Fourth, the quality of the project: qualified
Fifth, the project settlement: the cost of the project by Party B advance payment, the end of the project after acceptance, the project transfer payment, such as increase or change the project, and the original cost of payment.
Sixth, the duration of the project: 30 days. In the event of wind and rain, freezing, high temperature and other natural factors affecting the construction progress, according to the actual number of days to extend the construction period.
VII, Party B to ensure the safety of construction, does not affect the production, all accidents are Party B responsible.
VIII, Party A sent people to monitor the quality and progress of the project, Party B should be strictly in accordance with the construction requirements of the construction, to ensure the quality of the project, Party B does not follow the provisions of the construction, Party A has the right to put forward rectification methods, otherwise, Party A has the right to refuse payment.
IX, other outstanding issues, the two sides can negotiate a solution. If the consultation fails, according to law to the Bengbu City People's Court.
X. This contract in quadruplicate, A and B each party to take two, signed and sealed into force.
Party A (signature or seal): __________________ Party B (signature or seal): __________________
_________ year _________ month _________ day
Simple Contract for Maintenance Contracting 6Contractor (Party A): ______________________
Contractor (Party B): ______________________
Party A and Party B, in accordance with the Contract Law of the People's Republic of China (PRC), the Construction Law of the People's Republic of China (PRC), and other relevant laws and regulations, and in accordance with the principles of equality, voluntariness, fairness and honesty and trustworthiness, agree to contract with Party A on the following terms and conditions In accordance with the principle of equality, voluntariness, fairness, honesty and trustworthiness, Party B contracted Party A office building maintenance works, signed this contract.
I. Project
1. Project name: _________________________ office building decoration and maintenance works
2. Project location: ___________________
3. Scope and content of the contract: indoor decoration, outdoor putty scraping
4. , the total price of the project: _________ yuan, (capitals: _________)
5, the contracting method: package package materials
Second, the duration of the project
construction period ____ days, _____ month ______ start to ______ month ____ completion, completion and acceptance and delivery of use.
Third, construction preparation
1, Party A responsibility: to provide construction sites, water and electricity and other basic construction conditions, the progress of the project, quality supervision, to solve the problems that should be solved by the contractor and other matters.
2, Party B's responsibility: strictly in accordance with the original building structure of the construction, can not arbitrarily change the structure of the house, to ensure the quality of construction, construction, try not to affect the unit's normal work, choose the morning, midday and evening and the Mid-Autumn Festival, the National Day Holidays to seize the construction, the completion of the time specified in the contract and delivery.
Fourth, the quality of the project: Party B must be strictly in accordance with the requirements of Party A construction, and accept Party A supervision to ensure the quality of construction.
V. Acceptance of the project: After the completion of the project, Party A and Party B will accept the acceptance based on the construction requirements.
Six, the project payment and settlement
1, after the signing of the contract, Party A paid Party B ______ advance payment.
2, after the completion and acceptance of the project, Party A pays Party B all the money for the project.
VII, safety responsibility
Party B must do a good job in the construction of safe construction and preventive work, if a safety accident occurs by Party B to bear all the responsibility, Party A does not bear any responsibility.
Eight, bylaws
1, this contract in duplicate, Party A and Party B each sign a copy.
2, the contract since the two sides signed to take effect.
Party A (official seal): _________
Party B (official seal): _________
Legal representative (signature): _________
Legal representative (signature): _________