Who has a model office decoration contract?

The model construction contract for office building decoration and renovation works is as follows:

General Contractor (Party A): ____________________________

Address: ____________Postal code ____________Tel. ____________ Legal Representative: ____________ Position ____________

Subcontractor (Party B): ____________________________

Address: ____________ Zip Code ____________ Phone ____________ Legal Representative: ____________ Position ____________

In accordance with the Contract Law of the People's Republic of China, the Ministry of Construction's Implementing Measures for General Subcontracting of Construction and Installation Works, and the relevant provisions of the Document of the People's Government of the City of ××××××××××××××××××××××××××××××××××, the two sides Consensus, sign this contract, and seriously fulfill.

Article 1 Project

I. Name of the Project: ________________

II. Location of the Project: ________________

III. Project No.: _________ Construction Permit No.: _______ Business License No.: _______

Fourth, the scope of subcontracting work and the amount of work (with budget)

Fifth, the duration of subcontracting work ________ ____ started on ____, ________ ____ completed on ____.

VI. The cost of labor for the subcontract work ________.

VII. The types and number of laborers put in by Party B ________.

The second project settlement

According to the subcontracted project, the first month advance living expenses, calculated according to the number of contracted people per person ____, and then deducted back in the settlement of the next month, and in the construction of the project proceeding according to the amount of the accepted works completed in the same month in advance of the settlement (the range shall not exceed 80% of the completed amount) After the project is completed and accepted by the A and B **** together Qualified, to be settled.

Third project quality

Party A according to the national quality acceptance norms and assessment standards for technical delivery and organization of acceptance, Party B in accordance with the requirements of the construction drawings and specifications, careful organization of the construction, to ensure the quality of the project, such as the quality of substandard, must be reworked and repaired, and its loss of material and cost of labor and materials, borne by Party B; such as poor quality of the work and If the quality of the project is poor and cannot be saved, Party B shall be responsible for compensating all the loss of labor and materials.

Article IV Safety Production

One, Party A should do safety briefing for the project undertaken by Party B, put forward clear safety requirements, and carry out supervision and inspection, Party B must conscientiously implement the rules and regulations on safety construction, and strictly abide by the safety regulations, and the safety production facilities provided by Party A, Party B can use them only if it has passed the inspection and if any violation of the above provisions occurs during the construction, Party B should be responsible for all the workmanship losses. Party B shall be responsible for the losses in case of casualties due to violation of the above provisions.

Two, labor protection supplies and construction of personal use of electrified operating equipment, such as insulated gloves, rubber boots, etc. by Party B to solve their own problems, such as Party B really difficult to put forward the needs of the plan, Party assist in solving.

Three, in the construction process, Party B due to violation of fire regulations and laws caused by fire accidents, Party B is responsible for.

Article V Life Management

I. After the workers of Party B enter the site, the accommodation and food will be provided by Party A. The main cooking utensils (pots, cages and drawers, hair dryers, large panels) will be kept by Party B. If they are damaged or lost, they will be compensated according to the price. Party B will provide its own small utensils and coal for living will be provided by Party A according to the ration.

The food and oil needed for living shall be taken care of by Party B. Party A shall provide convenience in medical treatment and hygiene, etc. If Party B's workers have any diseases, they can seek medical treatment in Party A with the signature of the person in charge, and the medical expenses shall be paid by Party B on a monthly basis.

Sixth subcontracting labor cost unit price

I. Unit project subcontracting, per budgeted working day is ________ yuan. The implementation of a single square meter labor cost package, per square meter ____ yuan.

II. Sub-contracting of internal eaves plastering, achieving quality is ________ yuan per budgeted man-day. Achieving qualified is ________ yuan per budgeted man-day. The implementation of sub-labor cost package per square meter ________ yuan.

Three, single subcontracted stone and earthwork is ________ dollars per budgeted labor day.

IV. Clearance work is ________ yuan per man-day.

V. Full-day stoppages, standby, water, power and cleanup work days are ________ dollars.

VI. Water, electricity, heating and sanitary works are ________ yuan per budgeted man-day (subcontracted by block number).

Seven, during the winter construction period (December 1 to the end of February) to reduce the efficiency of 10% of the man-days. The unit price for its labor days is ________ dollars.

VIII. Breakdown of subcontracting cost (I to VII can be tabulated)

Article VII Management of Material Supply

Party B shall set up a special person to go through the limitation of collaterals to Party A for the materials of cement, steel, commodity components, hardware, linoleum, asphalt and special materials of water, electricity, heating and sanitation, and so on. Party B shall strictly follow the quality requirements and materials provided by Party A to cooperate with the construction. Party B shall be responsible for the waste of materials used in the construction and unreasonable exceeding the limit. Party B shall use the materials according to the pallet (heap) in the construction, do the daily use, finish the work, and keep the site clean.

Article VIII of the construction machinery and tools

I. Large tools are the responsibility of Party A to ensure that the use of needs.

Two, hand-operated tools, Party B is responsible for.

Three, Party A is responsible for the supply of tools, Party B should be carefully kept and cared for, if lost or damaged, Party B is responsible for compensation.

Four, the construction of small and medium-sized machinery required by Party A according to the construction program equipped with a machine should be equipped with a driver to ensure that the normal construction of Party B, Party B is not allowed to unauthorized operation of the equipment (bring their own machinery in accordance with the relevant provisions of the treatment).

Article IX site management

A, Party A, Party B personnel should strictly abide by the site management system, under the unified leadership of the person in charge of the site of Party A to organize the construction of the plan, progress, material supply and so on, the two sides should closely cooperate to ensure that the construction is carried out smoothly.

Two, Party B should be construction personnel to comply with the law and safety, love of property education, and designate a person responsible for site security, is strictly prohibited from stealing the site materials, such as violation of the site management system of unlawful acts, Party A has the right to take the necessary measures, Party B shall bear the legal responsibility, and is responsible for compensation for economic losses.

Three, subcontracting personnel should be kept relatively stable, in and out of the construction site to wear a work sign, and not allowed to enter and exit the site and accommodation of personnel outside the contract.

Article X Liability for Breach of Contract

I. The project subcontracted by Party B shall not be subcontracted again. In the process of construction by the inspection fails to meet the provisions of the national acceptance norms, can not guarantee the quality of the project, Party A has the right to terminate the contract, resulting in rework losses, Party B shall be compensated.

Two, after the contract is signed, without the consent of both sides, no party shall not change or cancel. If Party B terminates the contract unilaterally without Party A's consent, Party B shall compensate Party A for the economic loss caused by affecting the construction plan; if Party A terminates the contract in the middle of the process, Party B shall be compensated for the economic loss caused by it.

Third, Party B must complete the construction period and quality requirements as stipulated in the contract, otherwise, for every day late, Party A shall be reimbursed the overdue liquidated damages of ____% of the labor cost of subcontracted works.

Four, Party A and Party B shall not default on all kinds of payables, such as arrears, according to the bank short-term loan interest rates, pay the other party late payment penalty.

Article XI of the bylaws

I. When disputes arise in this contract, the parties shall consult in a timely manner, the consultation fails. If it cannot be solved, it can be solved according to the following item ( ): (1) applying for arbitration to the Arbitration Committee of Economic Contracts where the building is located, (2) suing to the People's Court.

Two, this contract is ___ copies, A and B parties each hold an original copy. The rest of the copies, reported to ____ for the record.

Third, if you require authentication (notarization), you can go to the district or county administration for industry and commerce where the building is located for authentication or notarization by a notary public.

Four, the two sides agreed on other terms:

1.

2.

Article XII Annexes to the contract and the validity period

Attachment of the contract:

1. The budget for the project;

2.

II. This contract shall enter into force on the date of sealing by both parties, and shall expire after all the works have been completed and settled.

General Contractor: __________

Legal Representative: ________

____ Year ____ Month ____ Day

Sub-contractor: ______________

Legal Representative: ________

____Year ____Month ____