2. This injection molding machine production can only be equipped with a mold, the mold pieces are done, you can change the next mold, theoretically can be equipped with a lot of molds, different specifications of the machine can only be equipped with a certain range of molds, molds have a range of too big or too small machine can not be loaded or processed.
3. Recycling station recycled plastic generally can not be used, different types of plastics can not be mixed, there are specialized in secondary materials you can check the Internet, or do it up to be able to easily find, can be used, color different price difference is large, it is difficult to guarantee the color and consistency, to do a delicate can not be used or a small amount of mixing with the use of. The price is about 50 percent of the raw materials (black, impure) to 90 percent, the secondary material did not have an invoice, the raw materials have an invoice.
4, pollution is very light, purchased secondary material from different sources may have a taste, the need for recycled water cooling equipment and molds, if the above equipment as one, **** two, need to build more than 20 m? above the pool, the requirements of the high efficiency but also with cooling towers and chillers.
5, the requirements of the adjusting machine and maintenance personnel to see the machine operator according to your staffing and equipment mold conditions, if there is no special debugging and maintenance personnel (equipment, molds), the operator of the higher requirements, the general situation of some people adjusting the machine in the case of a few days before you can operate on the machine, do not squeeze the mold.
6, need to learn the injection molding process, equipment commissioning, operation, injection mold maintenance, repair, plastic material knowledge, different material properties, processing temperature, whether drying are different. Basic knowledge of the Internet or buy books, equipment training by manufacturers, molds to find the mold-making party when asked to warranty in a timely manner.
7. Investment: including molds are also very expensive, cheap a set of 7,8000 (pots) expensive to 4,50,000 (stools) or even more, mold materials, grade, life expectancy is different, the price difference is even greater. Electricity is enough, a lot of electricity, 200T, about 350 degrees a day, different products will be different, the faster you do, the bigger the pieces of the more power consumption, the installed capacity of about 30 KWH, 450T, about 550 degrees a day, the rated power of about 70 kwh, or even more, different brands have differences, the transformer is enough, whether you need to increase the capacity of the cost is higher. Cable is also very expensive, we suggest that you do not buy copper cable, you can buy aluminum cable or single stranded wire. On the unloading of molds on the traveling car is best to install a, you can also do a gantry, hand-operated hoist, but 450T on the unloading of molds and mold repair is not convenient. But also with a crusher, drying hopper, pumps, water pipes, 450T equipment foundation to hit the concrete, pool to prevent leakage, do a good job but also add a cooling tower, chiller, mixer, but also to see if the plant height enough, short can not be lifted molds, if the beginning of the volume is not big suggest that you buy a 450T injection molding machine is enough to process the basin, just do the mold when the parameters of the equipment to the mold maker can be.
8, materials: PP, raw materials 12,000-14,000 yuan / T, HDPE raw materials 11,000-12,000 / T, light-colored recycled material can be done about 8-9,000 yuan / T, the market changes very quickly (with the gasoline up and down). Accurate quotes on the Internet after checking the phone to confirm the need to confirm the type and brand, the local plastic dealers generally operate, note that the price is different without invoicing.
9, plastic pots, plastic stools normal processing cycle should be about 40-70 seconds, with the mold condition, adjust the level of the machine, plastic materials, whether or not to use the chiller, etc., pots to be faster.
10, it is recommended to such factories concentrated in the area of the relevant factories to play part-time work (such factories are very short of people, basic 12-hour work, the machine is basically open up without stopping, do this batch of work and then stop), and by the way, please have a tuning masters, you have not done this line, you need to ask the professionals. In fact, your family has a mechanical processing plant, into the line should also be very fast, if the equipment, molds, materials, if good will soon get started, but then the investment is larger, low-end product competitiveness will be worse.