Jiujiang ship design drawings review acceptance of what conditions

Ships in the design of the time certainly need to operate in accordance with the drawings, and then to the processing plant processing out, so the ship's design is very important, this is not reasonable need to go through the relevant departments of the audit, in Jiujiang, ship design drawings to review the admissibility of which conditions, the Pacific Automotive Network editors have organized the following content to give you a reference.

One, Jiujiang ship design drawings to review the conditions of acceptance of which

1, the application form to fill in the content and the attached materials are consistent;

2, the application and the attached materials are consistent with the "Domestic Ship Drawings Review Management Regulations", "Jiangxi Provincial Bureau of Shipping Inspection of the ship drawings review management regulations," and related regulations.

Second, Jiujiang ship design drawings for review of materials

1. "Drawings Review Application Form"

2. Design unit copy of the industrial and commercial license

3. Design agencies stamped with the official seal or by the ship inspection agency for the record of the special seal of the ship's design drawings and technical documents in a set of three sets

4. Steel stamped drawings

Three, Jiujiang ship design drawings review process

1. Application, the applicant to meet the jurisdiction of the agency, provide "Drawings Review Application" and its technical drawings of the ship to apply for;

2. Audit, the reviewer of the Chinese ship (including offshore installations, shipboard products, containers) drawings to review the situation. Focus on the review of the applicable laws and regulations and norms are correct and the existence of problems in the treatment of opinions signed on the bottom of the review, together with the application materials submitted to the approving officer for approval;

3. Approval, the approving officer of the Chinese ships (including offshore installations, marine products, containers) review of concluding observations of the review of drawings for examination, in the review of the bottom of the review of the draft signed with the approval of the opinion and the relevant materials returned to the first reviewer;

3. The first reviewer;

4.

Jiujiang ship design drawings review acceptance conditions as long as the content and fill in and provide the same materials, and in line with the relevant provisions of the management approach can be, apply for this business to provide the materials mainly include, drawings review application form, etc., if there are other aspects of the question, welcome to the Pacific Automotive Network to do automotive consulting.