Engineer performance work summary report

Work summary is an important part of doing a good job. Through the work summary, you can clarify the direction of the next step, less detours, less mistakes, and improve the effectiveness of the work. Let me take you to see the engineer performance work summary report sample 5, I hope it can help you!

Engineer Performance Summary Report 1

I joined the group in 20__ years so far, in the position, responsible for the entire group of companies in the energy technology transformation and new projects of technical support and process review. Now the professional and technical work in recent years is summarized as follows:

First, the political demand for progress

Over the past few years, I actively participate in the company's organization of the various training, and make full use of spare time through the magazines and newspapers, computer networks and television news and other media, to learn the party's line, guidelines, policies, support the leadership of the party, support for the socialist system, and support for the reform and opening up policy, love of chemical industry, and engineering work. Process and engineering work, full of affection for the unit they serve.

Second, focus on learning at work

Can learn to master new technologies, new knowledge, new standards and norms in a timely manner, then applied in the work, adhere to the needs of the work to strengthen the study of chemical technology, and will learn the skills applied to the actual work, so that their own business level has been greatly improved, with a strong ability to work in the business. Over the past few years, in a number of positions engaged in technical and management work, are able to work according to the needs of the leadership of the arrangements. Originally in the trade and industry as a technician position, because the study of chemical engineering and technology, for the deep processing of silicate has a lot of shortcomings, in the daily work while studying while working, and strive to improve their professional and technical level, learning the advanced technology of domestic glass deep processing.

In the company's working period, their own in the silicate deep processing has a certain foundation, and because of their own chemical engineering and drafting ability is stronger, in the work, and constantly improve their professional skills, in the actual work and strive to learn more advanced processing technology, in this period of time, to complete the Suzhou high-speed rail train window glass processing design drawings of the design and drawing of the work, and the successful completion of the project, for the company. successfully completed the project, which created brand benefits and economic benefits for the company. In addition, at the end of 20__, the company cooperated with Asahi Glass, the world's largest glass enterprise in Japan, and undertook the toughening project of Asahi Glass's solar glass. In the project I am mainly responsible for the tempering quality control of the gatekeeper, after the company's unremitting efforts to finally complete the Asahi Glass solar glass tempering, for the company to enhance the value of the brand to make its own contribution.

20__ March transfer back to his hometown to work, back to his hometown after joining the group of companies, and now serve as the position, join the company is closer to their own profession, in the work of their professional skills learned in the university have a better use, in the company's work to continue to learn and improve their own, and made their own efforts in many projects, such as in the dry quenching flue gas waste heat recovery, in the coal industry low concentration gas gas power generation project, in the steel energy-saving technological transformation project and many other projects on the process and engineering research and study, for the implementation of these projects on the ground to make their own efforts. In addition to the field visit to the steel smothering slag process on-site engineering, the most advanced steel slag treatment process has the most intuitive and relevant understanding of this domestic.

For the future of steel on this new steel slag treatment process to lay the foundation for the process. In addition, this year we also carried out a sub-products Co., Ltd. to build the second phase of 600,000 tons of steel slag microfine powder project research and environmental assessment work in the project's feasibility study analysis and the production of the EIA report put forward their own insights and participate in the completion of the project's scientific research and environmental assessment of the preparation of the assessment work. Laid a theoretical foundation for the implementation of the next project. In the process of improving myself, I love this job more and more. Will make their own contribution to the company's progress.

Third, do a good job of passing, helping, bringing

20__ years since I joined the Energy Group Co. As I joined the energy management department was just established, professional and technical personnel, the lack of professional skills guidance, coupled with most of the personnel is the newest personnel, the level of technology is relatively insufficient, so the manager called me to everyone in the professional skills to help and teach. I patiently teach them chemical engineering and process knowledge, not only from the theoretical explanation, some places also hand in hand, but also teach them to do some of the reasoning, so that they will soon be able to like the job, after more than a year's 'time, they can not only work alone, but also become the backbone of the department. In the project to help the process of work, to do their best, due diligence, to do a combination of theory and practice, so that everyone in the learning process in contact with the very fast, easy to understand, but also to make up for the shortcomings, and constantly enrich themselves.

Fourth, the professional level of patient learning

Because the times in the development of society is progressing, some high-tech constantly put into the energy industry, especially in recent years, the use of energy issues more and more social attention, a lot of energy-saving technology and waste heat and waste energy recycling technology into the actual production process, in order to better serve the company, only to continue to improve their own, patient learning, hard work and study, and constantly enrich themselves. In order to better serve the company, the only way is to constantly improve ourselves, patiently study, study hard, learn new knowledge, learn new technology, combined with the actual situation of the company, to put forward a more energy-saving and environmentally friendly new projects. To this end, I often contact various energy-saving service companies, to understand the latest domestic energy-saving technology, and according to the actual situation of the group to the leadership of some of their own ideas. I hope to be able to better serve the company, responsible for the work.

Fifth, professional training

Because of the work needs, I participated in June 20__ in the University of investment and financing and capital operation of advanced training courses in Taiyuan. Not only to understand the knowledge of this specialty, but also to look at the whole domestic economic situation, to understand the economic situation, to avoid the narrowness of theoretical learning. In the workshop's learning let me fully realize that the technical work to adapt to the market economy in order to highlight the technology is the first productive forces to promote the role.

The above is a brief summary of my technical work in recent years, through learning from books, learning from practice, learning from others, coupled with their own analysis and thinking, there is indeed a greater harvest and progress. However, achievements and shortcomings exist at the same time, experience and lessons learned also go hand in hand. Overcoming deficiencies, learning has no end. In the future, I will, as always, continue to do my best at work, constantly learning, striving to forge ahead, and constantly improve their own business quality, exercise their ability to work, sum up the experience, learn from the lessons, to do their own work better, in return for the unit of training and care for me, for the unit, for the cause of the port to contribute to all my energy.

Engineer performance summary report 2

20__ year passed, busy year, in the company's leadership and the various departments of the colleagues of the help of the ___ engineers, I as ___ the successful completion of this year's work. In order to work better in the future, to summarize the experience, lessons learned, I summarize the work of the year as follows:

First of all, the attitude of the work, because attitude determines everything. I have been in line with the honest people, down-to-earth work of the faith has been so far, said the company is to stand up to my training, to stand up to my salary; said the small is to stand up to their own youthful pay, to stand up to their own future. To be honest, in fact, this job is a lot of pressure on me, just to the company when the workload is not very large, mainly to the company's previous equipment and facilities and maintenance plans, maintenance costs budget and so on to the electronic form of expression, and the establishment of the corresponding files, and then do some maintenance of the previous equipment.

A good ideological and political performance

I am the principle of "serious learning, down-to-earth work, upright, happy life", on their own, I am strict requirements, work seriously, treat people sincerely, words and deeds are consistent, consistent with the table. To be law-abiding, modest and prudent, decent style, with good ideological quality and professional ethics. Positive demand for progress, unity and friendship, courtesy and integrity.

Second, the weight of the exercise, drumming up potential, better completion of the work

Strengthen the sense of responsibility, carry forward the spirit of hard work, enhance the sense of innovation.

Third, constantly strengthen the theoretical study, expand the field of knowledge

Study the current situation of the field of computer technology at home and abroad and the development trend, to absorb a wealth of theoretical knowledge of computers, to improve the ability to solve the practical problems of the profession, can be the specialty and the related professions with each other, to coordinate the solution of technical problems, and to guide the engineers to work and study. And also strengthen the writing ability, organization and coordination ability and judgment analysis ability.

Fourth, the direction of future efforts

1, trapped in a more serious transactional work of the special circumstances, the role must be technological change, the new era of the modern newspaper industry technicians should be technical organizers, network security builders, news and information products developers, information technology services consulting experts, information technology teachers identity.

2, to be innovative, technology management more need to have subconscious strengthening, technology and management should be given equal weight.

3, can not be satisfied with the status quo, do not think of progress, can not be a market field for fun, which will not be conducive to the development of the Group's technology and innovation.

4, to strengthen the newspaper computer knowledge training efforts to promote the development of information technology construction, reduce the construction of the overall maintenance costs.

Engineer performance summary report 3

20__ year has been again inadvertently passed away, came to __ has been the fifth year. Looking back on this year's work, in the company's leadership of special concern and reasonable arrangement of work tasks, in the heavy workload idle in there is time to seriously prepare for the examination of registered cost engineers. In this work time I do my best to complete their own work and actively cooperate with colleagues and other ministries. As a costumer, I strictly follow the rules and regulations of the company and the Ministry of Engineering and the duties of the work, on time and in accordance with the quality of the Ministry of Engineering to complete the audit of the project. The following is my summary since 20__:

According to the company's leadership requirements, to complete the work

1, ___C2 plot settlement audit.

2, __ printing and dyeing coastal plant office buildings, complexes, dormitory decoration project.

3, __ property development projects.

4, __ a series of engineering project budgeting.

5, obey the company's leadership of the work arrangements, all in the interests of the company as the basis, to complete their share of things and cooperate with other colleagues in the company work.

6, the use of rest time after work to seriously prepare for the registration of cost engineers, this year a one-time enrollment of four subjects, want to pass the cost engineer's examination. Although it is difficult, but the sky is not responsible for the painstaking people, I believe that as long as the correct attitude of the examination, hard work and serious preparation, there is still hope.

7, do a good job of the next year's work plan, so that they can do a good job of every job in an organized manner.

As the saying goes, live old, learn old, especially in the cost audit this work, in the audit process will often come into contact with many new things, encounter many new problems, but at the same time will also provide us with the opportunity to learn new knowledge, new experience, so that their own ideological understanding and working ability to have a new improvement and further improve. At the same time I learned a lot of new knowledge, I also understand my own shortcomings.

First of all, it is very important to improve the professional knowledge and skills of costing, now the project costing industry has moved from the era of hand-counting to the era of computing, and the whole industry is vigorously promoting the list price model, fast electronic calculation and costing software for a costing is essential, after such a long period of theoretical learning and practical exercise, I have basically mastered the Quanta calculation software and Pin Ming I have basically mastered some of the basic skills of Quanta and Pinnacle pricing software, I will strengthen the exercise, and pay attention to learning skills, so that not only can improve the accuracy of the cost and also shorten the work time to improve efficiency.

Secondly, our company is a cost consulting enterprise, which can be said to be an intermediary service company. It is for the construction unit and construction unit services to provide professional advice and opinions on engineering cost. With professional, deep knowledge of engineering cost is the basis of our foothold, in addition to allow us to provide better service is that we must have good communication skills. Construction units and construction units in this aspect of the project cost is often antagonistic, one side wants more income, while the other side wants to spend less, and our consulting unit is a bridge between them. Good communication skills can make us further familiar with them, to understand their needs and the existence of differences, and then in order to maintain the principle of the basis of our professional career with the ability to eliminate their differences, to reach a win-win situation for both sides ****.

Although this year's workload coupled with the preparation of four exams for the costumers are very busy, very hard, but it is all worth it, in the process of preparing for the exam, through the study of the material, know that they are in many aspects of their work in the usual work in the place where they are not in place, through the preparation for the exam, I feel that my own professional knowledge and skills and the ability to audit the transformation of a large portion of the improvement, which is the harvest after the effort. I'm not sure how much I'm going to be able to get out of this one.

The above is my year-end summary, there are improper please leadership criticism.

Engineer performance summary report 4

20__ year has passed quietly in the blink of an eye, looking back at the year, now 20__ year personal work is summarized as follows: 20__ year in the hospital leadership and colleagues of the support of the design of the hospital, the staff of all the staff of the concerted efforts to exceed the predetermined goals. Summarize the past year, the main work is as follows:

First, the workload

In the past year, I was mainly involved in the Wuwei City, Liangzhou District, Yu Guozhuang Village, public **** rental housing projects, 20__ Gulang Tumen public **** rental housing projects, Jinsha Township, small housing projects, the Gulang People's Visitors Hall, Zhangye City, three benefits of the chemical plant area project, and other buildings, the structural design. Through my own hard work, rise to the challenge, and constantly solve the difficult problems encountered in the work, and finally successfully completed the hospital gave me 350,000 output value task. My personal workload completed 545,000 output value, the actual charge reached 382,000, in the successful completion of the output value of the task at the same time, but also improve their own. Business level. Here, I thank the leadership, colleagues for my support and concern.

Second, other aspects

(a) dealing with site problems

Handling the site construction problems while coordinating the relationship between the units involved in the construction of the structural designers must master a skill, but also an obligation.

(2), the quality of drawings

As a structural designer this requirement is more stringent, because our design drawings directly affect the reliability of the building and the structure of the economic rationality, so in the work I never dare to slacken the quality of our products. Normally, we often communicate with professionals and technical backbone to discuss, and actively seek advice from seniors and leaders when encountering technical problems, and at the same time, access the Internet, review information, and strive to solve the problems in a reasonable and comprehensive manner.

(C), the old with the new

As a master to seriously guide the work of the apprentice, urging it to seriously study the specifications and software operation, seriously answer questions in the design process and drawings found in the problem, try to minimize the problems in the drawings, so that the successful completion of the task issued by the company.

(D), marketing

Through the relationship of friends to seek the market is also an important opportunity to exercise their own task, I must seize every piece of information to win the market for the company and the Institute to contribute to their own modest efforts.

(E), the registration examination

Due to their own inertia, did not take the registration examination seriously, the 2012 registration examination is very unsatisfactory. This year, I want to correct my thinking, adjust my mindset, actively strive for review time, cherish the unit to provide the opportunity to take the exam, and strive to get good results in this year's exam.

(F) focus on unity and harmony

A design unit is like a team, is to rely on teamwork, a design project involves a number of specialties with each specialty also need to design, drawing, checking, reviewing and so on many links. Teamwork is especially important in design.

Summarized: in this year, we have come into contact with many new things, produced many new problems, and learned a lot of new knowledge, new experience, so that I have a new understanding of the ideological and working ability to improve and further improve. In the daily work, I always ask myself to start from the actual, adhere to high standards, strict requirements, and strive to achieve the business quality and moral quality double improvement.

Finally, I sincerely thank all the leaders of the company and all the colleagues who care about helping me, may we create another brilliant in the new year.

Engineer Performance Summary Report 5

In the past five months, under the leadership of the leadership of the Engineering Services Department, after the **** with colleagues to struggle, after their own positive efforts to do the following work.

I. Work attitude, ideological work. Work attitude, I love my job very much, can discipline myself, abide by the systems of the Ministry of Engineering, to maintain a responsible attitude towards work, humble learning, enterprising, and constantly improve their own. Technical level, and strive to leadership assigned to each task to do the best. Guide the installation work.

ii. Guide the installation work. In the gold permanent magnet installation of the actual work, through the equipment of the piping interface, rectifier cabinet and control cabinet wiring discharge installation, deepen my understanding of the equipment process and line supply and distribution. It also cultivated my ability to read electrical wiring schematic diagrams, piping connections and installation drawings. At the same time, I also learned the skills of equipment spare parts cognition. Every part of the installation process was done carefully and conscientiously. I found errors in the installation of lye filters and proposed them in time and installed them correctly. Although the guidance work was successfully completed, but through the work found in the control cabinet plc model configuration and accessories detailed name, function and role of the understanding is not deep enough. In the future, I will focus on reading some technical drawings and going to the Material Security Department after working hours to recognize the accessories. Do not understand the problem in time to colleagues and leaders to ask for advice. The first thing I want to do is to get the equipment to be tested and debugged.

Third, the equipment test debugging work. In the workshop on the Saudi Arabia equipment test debugging, the power plant cndq-10 hydrogen equipment start-up sequence, pid parameter settings, have a certain understanding. Also understand the working principle of rectifier from shallow to deep. Before the test run, make sure that the straight-through cylinder is 90 degrees and the three-way is 180 degrees. Straight through the ball valve modulation closed state. Jordan's pneumatic thin-film adjustment valve should be initialized to make adjustments, debugging process like the equipment can not reach the system pressure, the actual level does not match the upper computer, the electric pump damage faults occur from time to time, it should be based on the actual situation of the correct troubleshooting.

Fourth, the future direction of work. Next month focus on the commissioning stage of learning. Cultivate their ability to find faults. Feedback to the leadership of the problems found on site, and ask for more advice. In the future work to make up for the shortcomings, and strive to do a better job.

Engineer performance summary report Related articles :

★ Engineer personal work summary sample five

★ 2020 Engineer personal work summary excellent sample 5

★ 2020 Engineer work summary sample five

★ Engineer personal work summary Excellent version

★ Engineer personal work summary selected

★ Engineer year-end work summary sample compilation

★ Technical Engineer personal work summary

★ 2020 Engineer year-end work summary report selected 5

★ Technical Engineer work summary sample