How to write a solar energy repair and maintenance contract?

Solar hot water project repair and maintenance contract

Party A:

Party B:

In the spirit of equality and friendly cooperation, the two sides have reached an agreement after consultation, and signed the following contract:

One, the party B maintenance and maintenance of the contents of the obligation

Supporting the solar water heating project is not covered by the warranty, the electric boiler is consumable. /p>

1, solar water heating project all equipment and control equipment, electric boilers are consumables, not under warranty, need to replace the cost of charging fees. 2, Party B no less than 3 times a quarter door-to-door maintenance, take the repair call within 8 hours to respond to no special circumstances, within 8 hours should repair the fault, to ensure that normal hot water.

According to the "Contract Law", by the A and B sides of equal consultation, reached the following agreement:

I. Maintenance content of Party A will be the residential area of B1 #, B4 #, B6 # of five units of solar energy system entrusted to Party B for routine maintenance and repair.

Two, Party B's responsibility 1. Regular maintenance and inspection of the system, every three months comprehensive maintenance and inspection, annual comprehensive maintenance, including the cleaning of pipes. Party B in the maintenance process need to carefully do a good job of each set of solar energy system maintenance records, each year to Party A archives to provide maintenance information for the current year. 2 usually occurring faults, half an hour to be in place and dealt with. 3 quality and quantity to complete the implementation of the maintenance work to ensure that the heat pump solar centralized hot water supply system and the equipment is safe and stable operation of the use of the heat pump. 4 in the work site designated by the Party to carry out maintenance Maintenance, comply with Party A's relevant rules and regulations and safety management requirements, and comply with Party A's work arrangements. 5. Daily basic maintenance parts have a reasonable inventory.

Three, Party A's responsibility 1. Timely reflection of the daily operation of the system to Party B. 2. In the implementation of Party B's maintenance and repair work, actively cooperate and provide convenience. 3. Timely payment of maintenance and repair costs to Party B. 4. Party A should strictly abide by the operation of hot water system equipment operating procedures for the operation of the hot water system, such as man-made damages, the costs borne by the Party A or the user. 5. Bear the cost of the main parts included in this clause: compressor, control main board, water exchanger and electric auxiliary heating, hot water storage tank, water pump, vacuum pipe, electric valve, solenoid valve, control element in the heat pump unit. In addition to the above main parts, the maintenance fee of the remaining parts is included in the annual cost of Party B.

Two, the payment method: semi-annual payment.

Three, the contract will be effective from the day of signing. From to the end of the month of the year. From the day of January,

Four, the maintenance amount of one year for the yuan (lowercase:)

Five, this contract in duplicate, A and B each party to sign a copy.

Party A:

Telephone: month and year

Party B:

Telephone: month and year