Recently, with the renovation of No.1 Road of Biomedical and Electromechanical Industrial Park in Fuzhou High-tech Zone completed, many enterprises in the surrounding parks finally bid farewell? Make up every year, bad every year? The traffic conditions. This one is made of steel and concrete? Blessing? Yes? King Kong Road? It can bear more than 1 tons of heavy trucks and completely solve the traffic problems of surrounding enterprises and residents.
Road traffic is the bone and blood of the city, and it is also a powerful engine for optimizing the development space. The convenient and fast traffic network extending in all directions speeds up the economic development and enhances the happiness and sense of acquisition of ordinary people. How to get through? Aorta? , dredge? Capillary? ? Fuzhou High-tech Zone makes in-depth planning and precise policies, improves the traffic network with high quality in solving problems, and builds a smooth traffic system with internal connections and external connections, which not only improves the quality level of park development and people's livelihood travel, but also accumulates strong kinetic energy for attracting investment and building nests to attract phoenix.
for the sake of better internal connection and smooth external communication? A game of chess? High-tech zone insists on benchmarking first-class, according to? First hurry and then slow down? Principles, to? A ring and a cross? For the road network pattern, we will comprehensively promote the construction of 5 roads and preliminary work, open up the primary and secondary road networks around Haixi Park, Two Parks and University Town, and accelerate the construction of first-class University Town and China Southeast (Fujian) Science City.
plan ahead? A game of chess?
The high-profile Fuyao University of Science and Technology officially started construction last month. Today, the Houshan Road outside the campus has been relocated and will be built soon. In the biomedical and electromechanical industrial park not far away, the main roads of two cities have been completed and opened to traffic, and clusters of jacaranda swaying in the wind on both sides of the road. A brand-new scenic avenue has brought vitality to this hot land of science and technology.
everything is done in advance. Plan ahead to improve the traffic network with high quality? March map? . Before the Spring Festival this year, the leading group of High-tech Zone held several deployment meetings for road network construction, touched the stock, calculated the gap, predicted the increment of road infrastructure needed for development in the future from a forward-looking perspective, and made it clear. A ring and a cross? For the road network pattern, to? First hurry and then slow down? For the construction principle, serve the park and people's livelihood in a targeted manner.
only by outlining can you get twice the result with half the effort. After combing and studying, it is determined that Qishan Avenue and Wisdom Avenue should be taken as? Cross? Take Wulongjiang Avenue and 117 County Road as examples? Ring? Yes? A ring and a cross? Inline type? Skeleton road network system. Start at the same time External smooth type? External traffic, planning the interchange transformation of Bayside Bridge, widening the connection of Qishan Toll Station, etc.
5 roads, which is urgent or slow? Anyone who serves the park, do it urgently; Everything that concerns people's livelihood must be done urgently!
the construction of supporting road network in the park is related to people's livelihood and economic development, and is an important link to achieve high-quality development. Therefore, it is planned to give priority to the road network supporting construction of the photoelectric industry base, the high-tech zone general hospital and the surrounding areas of Fuyao University of Science and Technology. All relevant departments in the region strictly guarantee the project quality and safe production, communicate and coordinate in time to solve existing problems, and speed up the project construction progress.
up to now, the supporting road network project of digital economy industrial park has started construction on 11 roads, of which 6 roads have been completed and opened to traffic. The road network around Fuyao University of Science and Technology is under construction, and many main roads in Nanyu Town, where it is located, have recently been opened to traffic, which will make the traffic between this new university, Fuzhou University City, Haixi High-tech Industrial Park and the two parks more convenient.
precise policy? An account?
The Bay Bridge is an important passage in the southwest of Fuzhou. Due to the large number of vehicles, the traffic jam on the upper and lower bridge sections is serious during the peak hours, and it has become a tourist destination for the surrounding people. Pain point? .
anxious about the needs of the masses. At the beginning of this year, under the leadership of the main leaders of the district, the relevant departments of the district planned and negotiated this matter. However, the seemingly short bridge-head road of several hundred meters involves nearly 1 departments in flood control dikes, bridges, planning, water conservancy and other provinces and cities. Pull one hair and move the whole body? The difficulty of approval can be imagined.
want to unplug it? Pain point? , it is necessary to meet the difficulties. After nearly half a year of multi-party coordination, the upgrading and reconstruction project of Fuzhou Bay Bridge and connecting highway (Nanyu Hub Interchange) has completed the preliminary work such as construction drawing design and financial audit of list control price, and has now entered the bidding stage, which is expected to start construction this month.
? Building roads is actually doing? Subtraction? Do one thing at a time, treat one less, and do it well with your heart? An account? . ? In the view of the person in charge of the Party Working Committee of Fuzhou High-tech Zone, finding out the blocking points, pain points and difficulties, making precise policies and prescribing the right medicine can make the road network construction more pragmatic and efficient.
in order to do well? An account? The whole region actively investigates the difficulties and pain points in road network construction and attacks them one by one?
in the 117 county road reconstruction project, all levels and departments in the whole region have cooperated efficiently, actively participated in land requisition and demolition, electric power and sewage pipe network reconstruction, and overcome multiple difficulties. The road is expected to be open to traffic at the end of this month.
Hubin North Road, which has been shelved for a long time due to historical problems left over from the old Geqi Drainage Station, has been joined by many departments in the whole region. Consultation? Finally, the blocking point has been solved, and the whole line will be connected in the near future.
draw hard? A picture?
it is the mission entrusted by the times to speed up the construction of first-class university city and southeast science city. Fuzhou High-tech Zone focuses on the overall situation, on the one hand, it focuses on upgrading the road network of the university town, on the other hand, it simultaneously improves the supporting transformation and makes road construction become? Doing practical things for the people? High-efficiency carrier.
Xuefu South Road, which is being upgraded, is adjacent to Fujian Normal University, Minjiang Teachers College and several primary schools and kindergartens. In order to do a good job, high-tech zones are launched? Ground, surface and air? All-round deployment, road construction from? Muscle base? And? Neri? Start by reinventing the surrounding environment.
? In order to ensure the personal safety and beautiful environment of the surrounding teachers and students, we strictly follow the examination and approval requirements and adopt a standardized enclosure composed of 2.5-meter-high composite plates and precast concrete blocks. ? The person in charge of the project said that after taking safety protection measures, Ground, surface and air? All-round construction is carried out in an orderly manner.
land? Is the underground pipe network. The old pipes are renewed and expanded, and the underground pipe network is laid out according to the hardware standard of the first-class university town, so as to completely solve the stubborn problems of mixed rain and sewage and poor drainage. At the same time, improve the strong and weak electricity pipe network synchronously to realize the road? Incise? Efficient diagnosis and treatment.
face? That is, pavement construction. Synchronous implementation? Machine non-shunt? And? White to black? Is it suitable to add asphalt to the motorway and change the pavement? Sponge city? Water-permeable bricks, and the greening on both sides of the road is upgraded and replanted.
empty? Is to drop the cable in the air and fundamentally eliminate it? Spider web? The potential safety hazard.
Xuefu South Road was upgraded? Ingenuity? It can be seen. In the high-tech zone, road construction is not just? Follow the map? It is a caring and warm-hearted popular project.
? Because the corner radius of our school gate is not enough, the opening of the gate has been unsatisfactory. This construction of Xuefu South Road has solved our problems together, making it much more convenient for teachers and students to enter and leave the school. ? The relevant person in charge of the experimental primary school affiliated to Minjiang Teachers College said with emotion. In addition, for the open space at the corner of the roadside, whenever the surrounding people and units have demand and response, the construction party will lay and replant turf in time to create a green landscape effect.
the beauty of the city lies in the details. With the improvement of the traffic network, the high-tech zone will be further unblocked? Microcirculation? Through a series of measures in engineering, management and science and technology, we will strengthen the effective connection between the urban trunk road network and the external channel, and continuously improve the accessibility and traffic carrying capacity of the regional road network.