How to fill in the equipment acceptance conclusion

Steps to fill in the conclusion of equipment acceptance:

1, the main building materials;

2, building components;

3, equipment of the incoming test report containing supervision and sampling information;

4, construction safety days;

5, acceptance of the signature of the personnel, name work unit title position;

6, the completion of the project acceptance of conclusions

7, the completion of acceptance.

The acceptance inspection of equipment and equipment after arrival at the site mainly includes:

1, the basis for acceptance, according to your equipment bidding or procurement documents in the acceptance requirements, the implementation of acceptance;

2, acceptance of the content, usually refers to the contract and the packing list of the items stipulated in the contract, for example, the equipment is intact outside the package, whether it is damaged, and if there is damage, then to explain where, Broken to what extent, the appearance of the equipment itself is intact, no scratch, collision, deformation, stains, rust, etc.;

3, according to the contract and the packing list inventory to the items are complete and consistent with the name of the equipment, model, number, etc., if inconsistent, it is necessary to specify the type of lack of as well as the number of.

Acceptance report format:

1, the basis for construction;

2, project overview, preliminary work and implementation of the project, design, construction, general contracting, construction supervision, equipment suppliers, quality supervision agencies and other units, the commencement and completion date of the individual projects, the completion of the workload and the formation of the production capacity, a detailed description of the reasons for the advancement of the schedule or delay and the reasons for the discrepancy between the production capacity and the original plan. The reasons for the discrepancy between the production capacity and the original plan, as well as the countermeasures taken in the construction to ensure the implementation of the original plan;

3. Initial inspection and commissioning;

4. Overview of the final account of the completion of the work;

5. Organization of the engineering and technical files.

"Regulations on the management of national ownership of industrial and transportation enterprises equipment," Article XV of the imported equipment purchased by the enterprise should be equipped with technical information on equipment maintenance and the necessary maintenance parts.

After the arrival of imported equipment, the enterprise shall carefully acceptance, timely installation, commissioning and put into use, found that the problem should be claimed within the claim period.

Article 26 of the enterprises of the equipment transformation and acceptance of the new value, should be for fixed assets value-added procedures.

Article 29 The enterprise shall establish and improve the acceptance and handover of equipment, files, management and assessment system.

Article XII of the enterprise must do a good job of equipment planning, selection, purchase (or design, manufacture) and installation and commissioning management. Enterprise acquisition of important production equipment, should be technical and economic demonstration, and in accordance with the relevant provisions of the report for approval. Enterprises to purchase equipment, equipment management organizations or equipment management personnel should be made by the enterprise equipment reliability and maintenance of equipment and other requirements.