Nanning urban drainage and sewage disposal regulations

Article 1 In order to strengthen the management of urban drainage and sewage treatment, to ensure the safe operation of urban drainage and sewage treatment facilities, prevention and control of urban water pollution and flooding, to protect the lives of citizens, property safety and public **** safety, and to protect the environment, according to the "Chinese People's Republic of China **** and the State Water Pollution Prevention and Control Law," "Urban Drainage and Sewage Disposal Regulations," and other laws and regulations, combined with the actuality of the city, to formulate the regulations. Article 2 The planning of urban drainage and sewage treatment within the administrative area of the city, the construction, operation, maintenance and protection of urban drainage and sewage treatment facilities, drainage and sewage treatment to the urban drainage facilities, as well as the prevention and control of urban flooding, the application of these regulations. Article 3 municipal housing and urban-rural construction administrative department, county (city, district) people's government to determine the town drainage department (hereinafter collectively referred to as the town drainage department), is responsible for the supervision and management of urban drainage and sewage treatment within the administrative area.

Development and reform, natural resources, ecological environment, transportation, water conservancy, emergency response, municipal landscaping, urban management and comprehensive law enforcement, administrative approval and other relevant departments in accordance with their respective responsibilities, to do a good job in the supervision and management of urban drainage and sewage treatment. Article 4 The competent department of urban drainage shall, in conjunction with the development and reform, natural resources, ecological environment, water conservancy and other relevant departments, according to the national economic and social development planning, territorial spatial planning, water pollution prevention and control planning and flood control planning to prepare urban drainage and sewage treatment planning, and environmental protection planning, water resources planning, sponge city planning, underground space development and utilization of planning and other special planning. Article 5 urban drainage and sewage treatment planning should be drainage pumping stations, rainwater storage and discharge, sewage treatment, recycled water use and other urban drainage and sewage treatment facilities, as well as sludge transfer and disposal facilities for the construction of land and protective distance, be reserved and control. Article 6 within the sponge city planning, sponge city construction control indicators should be included in the construction project land supply conditions.

New construction, alteration and expansion of construction projects should be built in accordance with the sponge city planning rainwater collection and utilization facilities, effective control of rainwater runoff. Article 7 of the town drainage and sewage treatment facilities construction projects and the need to connect with the town drainage and sewage treatment facilities for new construction, alteration and expansion of construction projects, the competent department of natural resources administration in the finalization of the design of construction projects, shall seek the views of the competent department of urban drainage. The competent department for urban drainage shall give its opinion on whether the drainage design plan complies with the urban drainage and sewage treatment planning and relevant standards.

Construction projects supporting the construction of drainage facilities need to be connected to urban drainage and sewage treatment facilities, the construction unit shall apply to the maintenance and operation of urban drainage and sewage treatment facilities. Maintenance and operation of urban drainage and sewage treatment facilities should be access to the technical review of the program, and access to the views issued. Article VIII of the new construction, alteration and expansion of construction projects should be in accordance with the drainage design program supporting the construction of drainage and sewage treatment facilities, not supporting the construction, shall not be put into use.

Supporting the construction of drainage and sewage treatment facilities should be planned and designed with the main project at the same time, while construction, acceptance and put into use. Article IX new construction, alteration and expansion of construction projects shall be in accordance with urban drainage and sewage treatment planning and construction of rainwater, sewage diversion and discharge facilities, rainwater pipes, sewage pipes shall not be mixed with each other, prohibit sewage pipes directly into the rivers, lakes, reservoirs and so on.

New residential roof public **** roof drains should be connected to the internal rainwater network in residential neighborhoods. New residential balcony, terrace drainage pipes should be connected to the internal sewage network of residential communities; completed residential balcony, terrace drainage pipes are not connected to the internal sewage network of residential communities, the competent authorities in charge of urban drainage shall develop a plan for renovation or remediation and gradual implementation. Article 10 the town drainage pipe project and supporting the construction of drainage pipes for new construction, alteration and expansion of construction projects, in the pipeline project before covering the soil, the construction unit should be commissioned by a qualified engineering measurement unit for the completion of the measurement, the formation of accurate completion of the measurement of the data files and pipeline engineering measurement map. Article XI of urban drainage authorities shall establish urban drainage facilities geographic information system, the implementation of information management, and gradually improve the drainage network and other facilities data dynamic update mechanism to ensure that the system data timeliness and accuracy. Article XII of the town drainage department shall, in accordance with the requirements of urban drainage and sewage treatment planning, to strengthen the management of low-lying areas of towns and other flood-prone points, to carry out key parts of the rainfall and water depth monitoring, organization of urban drainage and sewage treatment facilities inspection. Article XIII discharged into the public **** sewage network of sewage water quality should be in line with national emission standards; local standards are higher than national standards, the implementation of local standards.

In the area covered by the public **** sewage pipe network, drainage units and individuals shall, in accordance with the relevant standards and regulations, sewage discharged into urban sewage treatment facilities, shall not be discharged arbitrarily or exceed the standard.

In the public **** sewage network does not cover the area, drainage units and individuals should set up a special drainage pipe will be discharged into the public **** sewage network, or in accordance with the project plan to build their own sewage treatment facilities, sewage treatment to meet the prescribed requirements before discharge. Article XIV centralized collection and transportation of fecal water and fecal sludge units or individuals shall be fecal water and fecal sludge discharged into designated urban drainage and sewage treatment facilities, shall not be arbitrarily dumped, discharged.