Part I project manager annual work self-summary
Time flies, 20XX has passed, looking back at the past year, I can not help but feel a lot of emotion. From the beginning of the year to the end of the year, this year's work scene by scene in front of the eyes flashed. In the care and guidance of the company's leadership, in the mutual care of colleagues and work with each other, in the work of practice and learning, this year has come to an end. Here I will 20XX a year of work to do the following report:
1, the work situation and the completion of the project construction:
(1) rail transit line 10, Wuzhong Road parking lot commercial building into the construction of the pre-preparatory work: in the preliminary preparatory work, I actively communicate with the owner, the general contracting, the supervision party, into construction Preparation work has been perfected. Later, because of the owner's reasons (mainly curtain wall units, insulation units back) our construction failed to enter the construction site according to the original plan, the commercial building is temporarily shelved without construction.
(2) Ningbo Bay Head 4# demonstration area project construction completion: Ningbo Bay Head 4# demonstration area construction is mainly based on the exterior wall metal paint (using insulation composite board). This project is the first project of our company to break through the single mode of paint construction. This project in the construction process due to a variety of reasons led to the construction process work is not very smooth, but after our support and cooperation in all aspects of the project after the completion of the construction of the overall project in good condition, has reached the expected requirements and delivered to the owner to use. This construction project has brought rich management experience to the colleagues who participated in the project management. At the same time will also be the company's future expansion of the construction direction of a new starting point for the development of the company's road to add a brilliant one, as the company's subsequent development of the stepping stone.
(3) Xuzhou Yurun New City project construction completion: Xuzhou Yurun New City in May 2014 into the construction of the owner's reasons there are two buildings part of the construction of the surface is not completed with the August 2014 retreat, until September 2021 to enter the field again to complete the construction of construction of all the contract and acceptance of the delivery of the construction content.
(4) Shanghai Zhonghai Huan Yu world project construction completion: Shanghai Zhonghai Huan Yu world I is the first construction project of our company and China Shipping signed a strategic collection, the future development of our company is also of great significance. Although just into the field when the owner of the project department of all sorts of difficulties, but our leaders and site management personnel to withstand the pressure, in the construction process, full communication with the construction as far as possible and the smooth acceptance of the project and delivery, at the same time, for the Division I have won a good reputation.
(5) rail transit line 10 Wuzhong Road parking lot commercial building project construction completion: due to the preparatory work done before the year is more adequate, my construction team into the field of thermal insulation after the acceptance of the base surface can be directly after the construction. Due to the unqualified acceptance of thermal insulation base surface, the overall progress of the site is slow. By the end of the year the site to complete the contract volume of about 20%.
2, the completion of the quality of the project:
As the project leader of the beginning of each project I will be based on the characteristics of the project requirements, the establishment of a quality management system. After the project started, strict control of construction quality, starting from the foundation, one step at a time. In the construction process, I asked to firmly implement the content of preventive measures, to make the strengths and avoid the weaknesses, and improve the quality of the construction team personnel to compete for the first awareness. During the whole construction period, the quality of construction has been seriously implemented. So far, no quality problems have been found. The construction of the entire project, after careful control of the project, all construction content in line with the requirements of self-inspection, the overall quality is better, to achieve the acceptance and delivery of the owner's quality objectives.
3, engineering production and progress control:
Each project since the start of construction, I am in accordance with the contract requirements of the work period, the organization formulated the construction progress plan and labor force plan. And according to the construction progress requirements, and each construction team on its specific progress, construction to make detailed specific requirements. During the construction process, I controlled and managed the whole project construction by making monthly and weekly plans according to the actual situation. From the entire completed project progress, construction progress without delay and are in the owner's requirements for the time of acceptance and delivery.
4, safety management:
During the preparatory period of the construction site, I have analyzed the whole construction work area. According to the characteristics of the project engineering, in the construction process, I insist on safety management as the focus of daily management. To this end, I have strengthened the management work from the following aspects: ① Strengthen the safety technology delivery work. Strengthen the safety awareness of workers through the three-level safety education at the time of entering the site, and special safety briefings at the time of starting work. ② Strengthen the safety inspection and inspection, timely detection of problems, timely rectification, to eliminate hidden safety hazards. Strengthen the safety protection of site edges. ③ construction, regular site temporary electricity inspection, timely detection of potential safety hazards, timely repair and replacement. Throughout the construction period this year, no safety hazards occurred, to meet the requirements of the expected safety production goals.
5, the use of materials:
The construction process of material ordering I am basically based on the company's construction of coated amount of materials to develop a plan. Material use, I ask the construction team to adhere to the limit of material system, according to the construction budget, timely statistics of the construction content and quantity of each team, and timely comparison and analysis with the budget amount, control the use of materials for each sub-project.
6, the work of the year there are shortcomings:
① Project quality: during construction, the quality of the project control is more stringent, the overall quality of the project is better. But there are deficiencies. In order to create a quality project, I still need to increase efforts to remind myself of the later quality management needs to be further strengthened.
② material use: the use of materials in the overall are within control. But the material use of individual projects may be slightly higher than the company's construction budget. In order to save costs, I still need to analyze the reasons and strengthen management.
7, 20XX work plan
In the new year, I will make efforts from the following points, do a good job.
① Continue to grasp the rail transit line 10 Wuzhong Road parking lot commercial building project management work, taking into account the requirements of the project schedule, I will continue to grasp the construction production schedule control, and actively organize manpower inputs to ensure that the project is completed in accordance with the expected requirements, to ensure that the entire project is delivered on time.
② Strengthen business knowledge learning, continue to improve the level of management: with the advance of the times, the use of new technologies, it is necessary to re-educate professional and technical knowledge. Therefore, in the new year, I will continue to work hard to strengthen the learning of professional knowledge, I believe that as long as the effort, there will be results. On the other hand, actively learn from the advanced places of others, to make use of the strengths and avoid the shortcomings, and further improve the ideological understanding, to open up the horizons.
③ Further good construction management:
20XX work, I am responsible for the project despite certain achievements, but there are still many shortcomings, need to continue to summarize and improve. Only a good summary of the past, in order to better serve the future. In the new year, I want to further focus on three aspects of management:
First, the management of people: people are the organizers and implementers of management, project management personnel can not be slack, only all managers work closely with each of their responsibilities, in order to make the construction of all links interlocked, the overall work can be in order.
The second is the management of things: that is, the management of materials. 201_, I will continue to do a good job in the project management of the limits of the material system, and further refinement, and regularly with the amount of the project budget for comparison and analysis, to find out the shortcomings of the formulation of countermeasures.
Third, the management of the law: that is, the research and management of construction methods. On the basis of the company's various preventive measures, combined with the actual characteristics of the project, optimization and improvement, the formation of a set of proven construction methods, in order to guide the construction and operation of workers.
④ Timely handling of changes, visas, supervise the synchronization of engineering data with the site, make good preparation of the progress of the project, accurate and timely declaration of settlement audit.
Unconsciously crossed into the new beginning of 20XX. In the future, I will work harder, strengthen learning, seek truth from facts, complete the tasks required for the work, strengthen awareness, care for colleagues, care for the leadership and the construction of the company, to erect a solid goal for the life, with hard work to return the company, with the knowledge to enrich themselves, so that they can be in the project leader of the work and expertise in the field of the next level, so that you can make a better contribution to the company's benefits.
Part II Project Manager annual work self-summary
20XX is a very important year for the engineering department directly under the Ministry of engineering is very important year, the engineering department in the care of the leadership of the company under the guidance of the company at all levels of the company's departments in close cooperation, and go all out on the front-line production. We strictly remember the company leadership's teachings and instructions, highlight their own technical advantages and professional expertise, give full play to the Department directly under the core role in the construction of the project, strict control of safety, quality, progress, cost, and better complete the tasks arranged by the leadership of the company. Directly under the Department in the gradual exploration gradually constitute a professional supporting complete, job responsibilities clearly united and strong fighting group. Cultivate structured, hierarchical and diversified talents in the team of migrant workers. Professional workers from the original power municipal expansion to the main structure, landscaping, professional pipeline, stone paving. The average number of workers per month is 140.
In the direct forces of colleagues *** with the efforts of the end of December this year, as of the end of a year of hard work, we have completed more than 20 contract works, completed the contract value of about 12 million. In line with the principle of reviewing the past, summarizing experience, identifying shortcomings, and then enriching and improving ourselves, to this end, we review and summarize the work scenarios of the Engineering Direct Department in 20XX in the following aspects.
First, personnel management
Personnel management is the core and focus of the work of the Ministry, the migrant workers give priority to the selection of experienced, long-term participation in the construction of the old workers as the basis for the management of migrant workers to continue the 10 years of the system, the Ministry of the more fully committed to the structure of the migrant workers to invest in the cultivation of the introduction of a variety of professional types of work. Strengthening the group spirit of professional team, finally arrived at a stable migrant workers 160 people, on schedule to complete the schedule required by the Party. Compared with last year, this year's project specialization has been strengthened, and the dangerous works have been increased, but in terms of safety, our management has been more meticulous and strict. This year with 0 casualties and 0 accidents perfect completion of the tasks issued by the company. There I am grateful to our brothers in the project department for the long time to my support, but also grateful to those who work hard friends of the civilian workers. Thanks to them in the past year on the company as well as my personal work on the strong support.
Second, cost management
At the beginning of last year, we made detailed statistics on the cost of the various expenditures for the various comparative objectives to make business analysis, production value income and construction costs according to the scenarios by the weekly or monthly budgetary comparisons, and timely accounting of the actual expenditures and the deviation from the plan, analyze the reasons for the corrective action in a timely manner.
In 20XX, the indirect costs accounted for about __% of the total output value, of which the personnel management costs accounted for __% of the total output value, site management expenses accounted for __% of the total output value, vehicle maintenance and depreciation accounted for __% of the total output value, and living expenses accounted for __% of the total output value.
In 20XX, the direct connection costs accounted for about __% of the total output value, of which the workers' salary costs accounted for __% of the total output value, auxiliary materials accounted for __% of the total output value, machinery costs accounted for __% of the total output value, and the direct costs totaled about __ million in expenditures. Engineering with data to speak, these data help me summarize the production profile last year, but most importantly to me in the coming year's business plan to light a bright light. Work ratios in the reasonable we continue to adhere to, insufficient we will continue to improve the work in the coming year, more reasonable words.
In the process of summarizing the experience to meet the challenges, we have found a few worthy of our improvement and face up to the problem, but also need to seriously overcome and correct, in order to improve, so that the level of management to a new level, the main expression of the following aspects:
1, to further improve and refine the quality of the project quality management system, clarify the management procedures. Strengthen the internal quality inspection work, clear quality inspection procedures, so that the project management is smoother and more efficient. Clearly defined internal division of labor and responsibilities, the establishment of the upload and download, unity and cooperation, standardized and orderly working order, and vigorously promote the smooth progress of the work. Do owners satisfied with the company assured.
2, strengthen the internal skills training, the use of spare time to the team leader for professional and technical training to improve the overall quality of labor personnel on the implementation of the professional organization of the workforce, according to different types of work, not the same construction parts to the division of the operating team to improve the operation of the degree of proficiency and labor productivity, in order to ensure that the quality of engineering construction and construction progress. The labor force selects workers with high operating skills and good quality. In the construction team to enter the field before and during the construction process of workers constantly job skills training.
The summary is a mirror, after the summary of the past year's achievements and lessons, strengths and weaknesses, difficulties and opportunities for objective judgment, for the next step in the work of clear thinking, clear goals, develop measures, supply reference and protection. Thus, there is a clear understanding of the difficulties and a profound analysis, to find a solution to the difficulties, the opportunity to have a strong insight, and make early preparations to seize the opportunity of the various preparations.
In 20XX, according to the current remaining volume of work and the contract has been determined to measure, to ensure the completion of the output value of 10 million, and strive to complete the 15 million; to ensure that the company ___% of the gross profit and strive to create ___% of the net profit. Strategy determines destiny, ideas determine the way out, in the new year, the engineering branch should be more clear about the main ideas of the work. Ensure that the branch to complete the indicators, to reach the expected goal of the company's leadership. The new year is coming, engineering branch 120 farmers comrades, 11 project brothers are ready to go to the outstanding completion of the established work objectives in 20XX and strive.
Part III Project Manager Annual Work Self Summary
I was involved in ___ Central Hospital Building Intelligentization Project, ___ Statistical Bureau server room engineering projects, ___ digital city management projects, ___ digital city management projects, on-site supervision of the project in ___.
__Statistics Bureau machine room project, __Digital City Management Project main project has been completed, the project were completed in early __ final acceptance, the owner delivery and use. In the process of system delivery and use, our Supervision Department has tracked the system upgrade, operation and maintenance, and handling of abnormal situations.
The __Central Hospital Building Intelligence Project is the company's key project in __. From the strategic level, the quality of supervision services, good or bad, high or low, directly affects the subsequent central hospital equipment bid, the Health Bureau software project supervision business. Director Zhao Juping strict requirements, general agent Cao Xinqi serious and responsible, teamwork, harmonious and complementary, the task to the person.
___Center Hospital is a project of the people's heart, government-led, the performance of the leaders in charge of the project, time is scarce, the schedule is tight, and many tasks. We strictly according to the project management process implementation supervision, not because of the time rush and blind construction, reduce the quality of the project. All things in advance, the first plan program, and then start the implementation. Taking into account the time constraints, synchronization of the various sub-subsystems, sub-floor and decoration units, civil engineering units, hospital construction command, hospital related functions and other interface units to interface and timely review of the program.
___Central Hospital Building Intelligence Project total investment of about ___ more than ten thousand, **** about 18 sub-systems construction, dispersed in the Laojian building, medical and technical building, administrative building several floors of 30 floors to implement the work.
The initial supervision of the project mainly focused on the following aspects:
1, drawing review, demand confirmation. Involving civil engineering units, decoration units and the hospital's internal functions of the various subsystems, we have repeatedly organized the project thematic drawing review meeting. Security sub-system video monitoring points of the fixed point quantitative, we provide rationalization proposals, for the hospital to save more than 80 million yuan. According to the requirements of the bidding documents, the owner's needs and the needs of business expansion in the later stage, we have unified the standard of information point location (internal and external network, fiber to the desktop, communication and telephone, one for each), and strictly enforced the standard in the later stage of the drawing review process. With reference to other health care information construction experience, the hospital suggested to supplement and gatekeeper selection of the call subsystem.
2, the central server room, monitoring server room supervision. Tracking the construction work of the central server room, especially the construction of the decoration subsystem. The six-side decoration process of the room is strictly enforced standards, leveling - anti-dust - moisture - heat preservation. In the pre-burial project, the bridge, wire pipe, over-wire box, specification, thickness, quantity and laying path are verified and controlled on site. Strong electronic system, household cable wire diameter and total distribution load, total switch to match, ups head in and out cable wire diameter and ups input and output to match. Lightning protection and grounding subsystem, metal fixtures equipotential connection good grounding, equipment shell protection grounding, distribution cable bus grounding, joint grounding is not greater than 2 ohms, separate grounding is not greater than 1 ohm. Power environment monitoring subsystem, this system is the key to real-time management of the server room, its functional comprehensiveness, performance and stability directly affects the quality of server room management. The ring control is mainly on the precision air conditioning leakage alarm, power distribution leakage and overload, ups running status, indoor temperature and humidity monitoring.
3, focusing on bypassing the building information technology pipeline laying, real-time pre-embedded quality assessment. Preliminary mainly to the building pipeline laying work, our supervisory staff is the strength of the work, meticulous work, but also to see the work of the work. Because it involves a comprehensive pipe network, on the pure static water pipe network, fire pipe network, fresh air pipe network, air conditioning pipe network, in the implementation of the design drawings at the same time, but also should be real-time reasonable adjustment of the local path. Field personnel to grasp a few principles, first drawings, after the scene; site level pipe network overlap, without affecting the decoration of the ceiling, vertical adjustment; affect the ceiling or bad indoor feed, avoiding water pipes, near the air conditioning pipe and so on. Unified standards, flexible supervision, real-time scheduling implementation, daily inspection of engineering quality, engineering progress three days of nuclear, timely reporting to the leadership of the work, and the articulation of units to ensure that the other interface unit follow-up process normal implementation.
I was transferred in July ___ Central Hospital Building Intelligence Supervision Project Department, continue to participate in the ___ digital city management project construction supervision work.
__ Digital City Management Supervision Project is the company's key project in __ and the contract amount. For the first time to independently take charge of the general agent, and undertake such a large project, I am under great pressure.
Just into the project team, in accordance with the basic supervision process, carefully study the tender documents, bidding documents. Because the contract was not signed until early October, there was no contract in the early stage. Through the study of tender documents, bidding documents, summarize the project there are several major risks as follows:
1, personal skills risk. According to the supervision contract, "three districts and one park" district command center, "City Supervision Command Center" renovation project by our supervision, personal experience, there is a lack of management points are not clear, management focus is not clear and other risks.
2, the preliminary planning program, bidding program is not strong implementability. According to the technical program provided in the bidding for the hardware integration platform section, the equipment attached to the equipment list is in conflict with its construction ideas embodied in the program. The virtualization software is available nowhere, the planning of servers into the storage is obviously unreasonable, the number of access switches and the functional units in the network has a large error, the number of core switches and convergence switches of the optical module has a large error with the planning of the network requirements, the number of network security equipment (network gate) configuration with the actual number of the planning of the network topology map has a bias (business network, video network, office network of the local area, the public security network of the security issues), The current allocation of equipment can not meet the large screen display subsystem function to achieve (dual-screen workstations all on the big screen) and so on.
3, the basket project, the project to promote difficulties. Hardware platform bidding, decorative decoration project bidding for the lifting basket project. Individual behavior and business mode of operation, weak capital advances, technical strength are at risk. Later in the implementation process, the risk is fully exposed. Hardware platform supply serious lag, into the field 3 months without supply. Because of the funding problem, the decoration project is stagnant, local nodes process delays lead to important nodes of the project lagging behind.
4, the construction unit more, more sub-projects, coordination difficulties. Four segments involving four units, the actual subcontracting for eight construction teams. Basic data census base map, outdoor probe location and take power, vehicle terminal installation of specific vehicles and distribution, the relevant functional units business network link access, etc., involving the project construction team internal and external communication and articulation work, the project is difficult to promote.
5, the bid division is unreasonable, construction interface cross, responsibility and work to push the possibility of commission. Software developers are responsible for the system and even the total integration of the entire project, on the equipment, hardware platform integration program deepening, configuration management, training, who to do, what to do, how to do is not clear. I pre-projects in a number of regular meetings (see the minutes of the meeting and supervision weekly report) put forward, late in the local problem or no one to do the situation.
In response to the above several risks, I strive to improve their ability to report to the director, the company, asked to solve the manpower. I at the same time in a number of regular meetings of the project clear to clear responsibilities, so that things have to be done, the responsibility of someone to bear. I also actively cooperate with the construction command on-site communication, poor external communication and timely feedback to the construction side. Internal communication is not in place, the implementation of things in the end, to work in the form of contact sheets to stay bottom of the supervision and at the same time reported to the construction party leadership approval. Project progress in a timely manner to summarize the progress of deviation risk timely report to the construction side, the project will promote the risk of adverse transfer.
The project on December 31, ___, basically completed the construction of the main project. The City is relatively satisfied with the construction of the project. There is still a lot of finishing and improvement work to be continued in the construction of the project, mainly focusing on the following aspects.
1, landscaping category data, the confirmation of tree species.
2, "three districts and a garden" command center of the final (cable finishing, marking, cleaning, air conditioning installation) work.
3, municipal supervision of the command center to close (* dew of steel columns, storage room decoration, carpet laying, the commissioning of the central control, large screen display subsystems to improve) work.
4, the training work of the various sub-hardware subsystems.
5, digital city management implementation methods and performance assessment command manual preparation.
6, the staffing establishment of the post, set up, the staff team business operations training work.
7, law enforcement vehicles, sweeper car probe, gps car terminal installation work.
8, the installation of outdoor probes, the installation site of the original work.
9, the development of extended subsystems.
10, innovative sub-systems to confirm the demand.
11, hardware subsystems subsystems configuration document organization.
12, equipment connection cable, termination cable marking work.
13, the configuration of each section of the documents, drawings or completion of the documentation of the finishing work.
After another year of refinement and learning, I found myself a lot of shortcomings, need to improve and breakthrough in the following areas:
1, improve the sense of service, sense of responsibility. Supervision is to provide soft services, must improve the sense of service. According to the supervision contract clear responsibility, scope, work, but at the same time actively cooperate with the construction side. Supervision work can not be limited to the office, just become the contractor's messenger. I personally believe that we should actively go down to the site, find the problem and summarize the main points of the problem timely feedback to the construction side. I also think that the program and plan more and detailed is not absolutely important, the scientific and reasonable program and plan through the implementation of the real effective. Young me remember not to think that the supervision work is easy, good money, small risk, to establish risk awareness, think of danger in peace, preventing and preventing the problem will be reduced to nothing. We are the construction side of the firewall, to always remind themselves of their responsibility and obligation to assume risk for the party. We must establish, "project problems, promote the unfavorable, I am the first responsible person" consciousness.
2, problem-solving program, purposeful enhancement. Efforts to improve skills and accumulate experience, prior to pre-judging the risk, found the problem. Active bystander site construction work, real-time bystander at key nodes, diligence can make up for clumsiness, timely detection of problems. Supervision work drive must have their own book of scriptures, logs, weekly reports, monthly reports should be prepared in a timely manner, both for the implementation of the project work of short-term comprehensive combing is also a self-summarizing process of improvement. Every day's work should have a focus, grasp the big and small to promote the implementation of the project. Daily work priorities, weekly work priorities, monthly work priorities, should be tracked one by one and urge the contractor to implement in place.
3, the breadth of learning, digging depth, improve the quality of supervision. Supervision of the project requires individuals to have the necessary technical expertise. As my personal both to strengthen the breadth of learning, but also have at the same time drilling the depth of learning. I entered the supervision industry has been more than three years, has a deep sense of their own inadequacy. Breadth and depth of knowledge is complementary and not contradictory, learning to be successful must have two points. This requires hard work, calm, fidgety, shallow, proud is not good. In the coming year, I will first of all the company's supervision specifications, construction standards, construction units of the construction program carefully read, through the accumulation of books, practice, and constantly improve themselves.