Human defense departments at all levels and there are units of defense works, should strengthen the leadership of this work, the implementation of the management department and personnel, the establishment of the necessary maintenance and management system, regular inspections, timely resolution of existing problems, summarize and exchange of experience in maintenance and management. Article 4 The repair and maintenance of human defense works must be carried out in accordance with the requirements of the Technical Regulations for Maintenance and Management of People's Air Defense Works. Different circumstances of the people's air defense works should meet the following requirements:
One, has been delivered to the project
1. the main body of the project and the mouth of the vault (roof), side walls, floor (floor) structure should be kept intact;
2. the project interior is clean, fresh air, no water seepage and leakage, drinking water in line with hygiene standards;
3. protection of the secret group door (cover) The protection of the closed group door (cover), closed door, explosion-proof wave valve closed performance is good, rotating and flexible, wind, water, electricity system and the three prevention, communication equipment work properly;
4. metal, wooden parts corrosion and damage;
5. fire prevention, backflow prevention facilities are safe and reliable;
6. the entrance and exit road is clear, the aperture camouflage facilities are in good condition.
Two, has completed the main part of the project but the mouth has not yet been dealt with, the main body of the project and the internal equipment, facilities and maintenance, should meet the corresponding requirements of the project has been completed and delivered to the use of the project.
Third, the main body is not yet completed to stop and slow down the construction of the project, has been resumed, should be maintained by the resumption of the structure is not damaged; has not been resumed, should be regularly inspected, and take measures to prevent the collapse and damage.
Four, belonging to the maintenance of the status quo works, should be set up to manage the door or cover; usually useful or temporary conditions of use and away from the urban areas of the project, after regular repair and maintenance, entrances and exits can be taken temporary blocking measures. Article 5 In addition to command and communication and other important special projects, other people's defense works in the wartime does not affect the use of the project, does not damage the structure of the project, does not reduce the protective capacity and is conducive to the maintenance and management of the project under the premise of the weekdays can be opened up to the public, according to the place, according to the hole in the arrangement for the use of the appropriate. Article VI of the usual use of human defense works, should be to the local human defense department for the use of formalities. Rental of human defense works, should be in accordance with the provisions of the rental unit to pay rent. Article VII of the maintenance and management of human defense works, according to the unified guidance, division of responsibility for the principle of organization and implementation. The city's public human defense works (including primary and secondary school unit works and joint works without implementation of the unit), by the human defense department to organize the maintenance and management; agencies, groups, enterprises, institutions of the human defense works, by the unit responsible for the maintenance and management; leased human defense works, by the renting unit or individual responsible for the maintenance and management. Article 8 All units of human defense works, should be based on their own actual situation, establish and improve the necessary maintenance, security, fire prevention, flood control, testing, health and inspection reports and other management systems, to strengthen the maintenance of human defense works and the use of management, so that it is often kept in good condition. Article IX of all human defense works, are to establish engineering technical files. Files include: geology, hydrology, surveying, design, construction, acceptance of the drawing data and equipment manuals and equipment operation, maintenance records. Files should be in accordance with the unified requirements, sub-organized, compiled into a book, respectively, by the land, city, state, county (district) and unit of human defense departments to keep a copy. Key cities of human defense engineering master plan, command and communication engineering files, should be reported to the provincial human defense office a file. Article X to seriously do a good job in the confidentiality of human defense projects. Strictly prohibited to unrelated personnel to disclose the nature of the project, coordinates and protective capacity and other relevant data; shall not lose the project's confidential drawings, information, documents; command and communication engineering shall not be open to the public; visit the project shall be agreed to by the city's human defense department can be arranged; foreign guests to visit the project in accordance with the relevant provisions of the implementation of human defense. Article XI of the labor required for the maintenance and management of human defense works, should be based on the actual situation, according to local conditions. Public human defense works required labor (including caretakers), can take the mobilization of urban workers to participate in voluntary labor or hire temporary workers to solve the problem; maintenance and management of complex equipment works, temporary workers can be recruited to form a competent professional team to maintain, but also can be contracted to the unit. Units of human defense works, by the unit to arrange labor for maintenance and management; equipment and technology complex maintenance projects, can be contracted to outside units or human defense department maintenance team for maintenance. Article XII of the human defense project maintenance and management of funds, materials, according to the following solutions:
One, public human defense works, where the usual use of economic income of the project, maintenance and management fees from the income; no income of public works maintenance and management fees, from the cost of human defense projects. Public works maintenance of steel, wood, cement, by the human defense department to coordinate arrangements.
Two, the units of human defense works, should be included in the unit's fixed assets for management, in addition to the production of enterprise units of special projects, exempted from fixed asset tax, and do not extract depreciation of fixed assets. Where the usual use of human defense works with income, maintenance and management funds from the income. There is no income of human defense projects, enterprise units of the project overhaul, from the overhaul fund, medium and small repair costs, included in the cost of production; agencies, organizations, institutions, maintenance and management costs, from the unit of fixed asset repair costs. Maintenance and management of human defense works of each unit of the materials required, should be included in the unit's relevant plans to solve.
Third, the army's human defense projects (including the original construction by the human defense sector investment, the army use of the project) of the maintenance and protection of the management fee, according to the relevant provisions of the army expenditure.
Four, the scope of expenditure on the maintenance and management of human defense projects, according to the March 20, 1983, the State Commission of Human Defense, the Ministry of Finance issued the "on the management of the people's air defense funds for a number of provisions".