Typhoon emergency plan

Typhoon emergency plan model (selected 6)

In our ordinary daily life, it is inevitable that some events will not occur in their own expectations, in order to control the development of the accident situation, it is necessary to prepare a specific, detailed, targeted emergency plan in advance. So how to prepare an emergency plan is appropriate? The following is my compilation of typhoon emergency plan model (selected 6), I hope to help you.

Typhoon contingency plan 1

The coastal zone is a typhoon prone areas, my construction unit to ensure the safety of the lives of construction workers, to ensure that the enterprise's property is not lost, so the construction site to make the following anti-typhoon measures:

a. Early deployment:

1, in the receipt of typhoon forecasts immediately

Second, the organization of the inspection:

1, organized by the project department of the typhoon prevention team to carry out a comprehensive inspection of the construction site, to ensure that nothing is wrong;

2, the team carefully check the various construction materials stacked solid, slightly doubtful place to clean up remediation;

3, the erection of workers class the overall performance of the outer frame and the rigidity of the outer frame and the building. Performance and rigid connection between the outer frame and the building to carry out a thorough inspection, and immediately rectify the existence of places with potential safety hazards.

4, the construction site professional protection team to protect the shed reinforcement treatment, specific reinforcement measures for the setting of scissor braces and wire pull protection shed corners fixed to the ground.

5, tower crane operators in the typhoon before the arrival of all lifting work to stop, the position of the boom and fixed point according to the crane operating procedures.

6, the electrician in the typhoon notification, immediately after the construction site laying of circuit wires to check the placement of the electric box is firm and reliable, there are hidden safety hazards in the place of immediate rectification, and in the typhoon before the arrival of cut off all the construction of electricity, the typhoon, the first of the construction site after the typhoon, the circuit wires check to confirm the normal power supply only after.

7, when the typhoon comes, living quarters closed all doors and windows to ensure the safety of workers.

Third, the leadership attention:

The project organized by the Ministry of leadership team members on duty all night, configure the necessary communication equipment (such as walkie-talkies), to facilitate emergency mutual contact.

Fourth, emergency rescue:

1, emergency rescue personnel should be trained and necessary drills, master the rescue action methods and skills and precautions, familiar with the unit's safety production, master emergency rescue equipment, equipment performance and use.

2, equipped with the necessary emergency rescue equipment, equipment.

3, the rescue team during the typhoon 24 hours a day standby, the occurrence of accidents in a timely manner to deal with.

V. Start the plan:

The establishment of the typhoon emergency response team, to facilitate the timely handling of problems in the process of typhoon prevention, to reduce unnecessary losses.

Typhoon Emergency Plan 2

I. Purpose:

The establishment of flood control, typhoon emergency response plan, through the training of the emergency response team and hands-on training, to strengthen the management of the service area of the ability to prevent flooding and emergency response, in the event of danger more effective and timely exclusion, to reduce the loss to a minimum, to ensure that the flood control, typhoon emergency response work The company's business is a very important part of the company's success.

Second, responsibilities:

Management Director for flood control, typhoon rescue commander-in-chief;

Management Director for the deputy commander-in-chief, is responsible for the full range of equipment group;

Safety host for the deputy commander-in-chief, is responsible for the full range of work of the rescue group;

Environment host for the deputy commander-in-chief, is responsible for the full range of work of the logistics group;

The environment host for the deputy commander-in-chief, is responsible for

The control center is responsible for the accurate communication of information and coordination;

All off-duty staff of the management office are flood and typhoon emergency response team members.

Third, the division of group responsibilities:

3.1 rescue group: by the safety host and not on duty all the safety members of the group

3.1.1 to take all the measures to deal with the danger;

3.1.2 responsible for flood sandbags filling, handling and stacking;

3.1.3 Utilize various ways and means to remove dangerous situations in time.

3.1.4 Division of labor

3.1.4.1 not on duty two center post is responsible for filling sandbags;

3.1.4.2 not on duty two two No. 2, No. 3, No. 4 post is responsible for transporting sandbags;

3.1.4.3 not on duty two No. 6, 8 is responsible for the site of the stacking of sandbags and other measures to rescue;

3.1.4.3 not on duty two No. 6, eight is responsible for stacking sandbags and other measures to rescue;

3.1.4.1 The two center posts are responsible for filling sandbags, transporting sandbags and other measures to rescue. p> 3.1.4.4 safety organizer to lead the rescue team to take all other effective methods to do all kinds of rescue work.

3.2 equipment group: by the management office supervisor and the management office of two technicians

3.2.1 responsible for all kinds of pumps and power supply equipment on;

3.2.2 on the scene of the rescue technical guidance;

3.2.3 on-site equipment for emergency repair.

3.3 Logistics Group: composed of environmental organizers, housekeeping attendants, lifeguards, front desk attendants, cashiers, clubhouse attendants

3.3.1 Guaranteeing the normal supply of various types of relief supplies;

3.3.2 Responsible for on-site rescue of the injured;

3.3.3 Actively assisting the work of other groups;

3.3.4 Personnel division of labor

3.3.4.1 not on duty two five post is responsible for logistical material security;

3.3.4.2 front desk attendant, cashier, clubhouse attendant is responsible for evacuating the crowd and rescue the injured, the injured transferred to a safe location and timely report to the municipal emergency medical center;

3.3.4.3 lifeguards and home helpers are responsible for the rescue of property.

Typhoon Emergency Plan 3

First, the guiding ideology:

Typhoon, rainstorm prevention work is related to the lives of teachers and students and the national property safety of important work, in order to effectively protect the safety of teachers and students and property safety, to enhance the kindergarten flood prevention and control of the handling of Taiwan in the spirit of the principle of "prevention first, safety first," the development of this plan.

These are the first steps in the process.

Second, preventive steps:

1, the leading group list and contact phone number

Leader: the head of the school

Members: logistics team leader

nursery school director

union chairman

kindergarten to start the Taiwan flood control plan, the implementation of the 24-hour leadership, the duty system. The kindergarten has a 24-hour leadership and duty system.

Third, emergency measures:

1, strengthen the information communication, to do the top of the situation, the bottom of the report.

In the event of a major flood, all the leaders into place, flood control and Taiwan work leading group began to operate; the leaders in charge of the flood control and Taiwan work leading group to report on the flood; the full deployment of anti-Taiwan flood control work.

2, prevention-oriented:

1) clear corridor. Before the typhoon landed, the balcony, corridor debris, flower pots, etc. should be cleaned up to prevent the typhoon landed, was blown down by the wind to hurt people.

2) Close doors and windows. When a typhoon or rainstorm comes, the wind and rainfall are large, so you should close the doors and windows to prevent the wind and rain from damaging the doors, windows, furniture and causing casualties.

3) The janitor of the school's sewers and main catchment wells to carry out a comprehensive dredging.

4) Unclogging of guttering and downpipes on school buildings and houses, and pruning and reinforcement of large trees across the school.

5) Do a comprehensive safety check of the lightning protection facilities and outdoor wiring of all school buildings.

6) Do a comprehensive safety check of outdoor antennas, air conditioning outdoor units, and external hangings.

7) Indoor power supply, sockets, doors and windows of all departments to do a comprehensive check.

8) Due to the interruption of circuits and wires caused by the typhoon, the power switch should be turned off in time and emergency lights, torches or candles should be activated for lighting.

Fourth, safeguard measures:

After the plan is activated, the kindergarten to do a good job of early warning and information records. Convene an emergency meeting, in the shortest possible time, by telephone and other forms of kindergarten flood control and Taiwan work deployment, inform the Taiwan flood dynamics, the arrangement of flood control and Taiwan, rescue and relief requirements and tasks.

At any time with the higher departments and units to maintain close contact, strengthen information communication, to do the upper situation, the lower situation reported.

Typhoon Emergency Plan 4

In order to implement the Civil Aviation Administration of East China "on doing a good job in flood control and typhoon prevention work of the spirit of the notice" and the relevant requirements of the local governments at all levels, combined with the "x Airport Flood Control and Typhoon Emergency Response Plan", the development of this plan, the airport to prevent the frontal attack of the typhoon Emergency Response Plan.

This plan is used in conjunction with the "x Airport Flood and Typhoon Emergency Plan".

First, the principle of work

In accordance with the arrival of the typhoon before the "defense" is the main, the arrival of the typhoon to "avoid" is the main, the typhoon after the "rescue" principle.

In accordance with the principle of "prevention" before the arrival of the typhoon to "avoid" the main, after the typhoon to "save" the main principle, organized to carry out a good job to prevent the typhoon frontal attack of emergency response.

The second organization

x airport to prevent the typhoon frontal attack of the emergency response work in the x airport flood control and typhoon rescue headquarters under the unified leadership.

Third, the duties of each department

When the typhoon received a warning notice of the attack, in the x airport flood and typhoon rescue headquarters under the unified leadership of the departments to act quickly, in accordance with their respective duties, to do a good job of all the "prevention", "Avoid", "save" the preparation and implementation of the work. The duties of each department are as follows:

1. Airport Office: After receiving the warning notice of typhoon attack, inform the company leaders and airport departments in a timely manner. After consulting the company leadership agreed, start the plan, arrange personnel on duty, assume x airport flood and typhoon rescue headquarters office duties.

2. On-site command center: after receiving the warning of typhoon attack and start the plan notice, in a timely manner, in conjunction with the airport construction management office, aircraft security department and security checkpoints, to do a good job of parked planes, apron facilities and equipment of the tie-ups, reinforcement or removal of the work, and timely report on the relevant situation of the x airport flood and typhoon rescue command office.

3. Aviation Management Center: After receiving the warning notice of typhoon attack, do a good job of pre-arrival flights to prepare for the landing and the presence of flights on the transfer of the liaison matters; navigation station site of the wind, drainage and reinforcement, etc.; to do a good job of emergency communication security; in accordance with the requirements of the Bureau of the implementation of the airport air traffic control to prevent the positive impact of the typhoon plan content.

4. Mechanical Security Division: After receiving the warning notice of typhoon attack, in accordance with the requirements of the "Mechanical Security Division of the wind damage prevention emergency plan", tied up parked aircraft, special vehicles should be stored in the warehouse, can not be stored in the warehouse of special vehicles should be far away from tied up aircraft, parked in the leeward side, to set up a good brakes and add the wheelblock. Equipment and facilities on the apron should also take windproof measures to prevent collision cones into the warehouse, traction poles and work ladders should be stored or tied to prevent the wind from blowing, damage to other facilities, to strengthen the staff on duty and to maintain smooth communication.

5. Airport Construction Management Office: After receiving the warning notice of typhoon attack, strengthen the protection of the power supply system, make good preparations for power repair to ensure that the power supply is normal. Equipment and facilities on the apron to take windproof measures. Immediately after the gale, inspect the flight area field paths and lighting facilities to prepare for the opening of the airport.

6. Security checkpoints: After receiving the warning notice of typhoon attack, make the corridor bridge reinforcement tether to prevent accidents.

7. Cargo Center: After receiving the `warning notice of the typhoon attack, the cargo equipment and facilities outside the cargo warehouse to take windproof measures, the cargo equipment and facilities on the apron transferred to the cargo warehouse.

8. Airport Public Security Bureau: After receiving the warning notice of typhoon attack, promptly put all fire-fighting vehicles and air defense guard vehicles into storage or parked in the leeward place, to set up the brakes and add wheel blocks. All the police are in a state of readiness, ready to wait for x airport flood control and typhoon rescue headquarters to participate in rescue work.

9. Other departments: according to the "x airport flood control and Taiwan rescue emergency plan" of the duty requirements, standby duty, keep communication.

Four, work requirements

1. Responsibility in place, a clear division of labor. The airport departments can be based on the "x airport flood control rescue emergency plan" and "x airport to prevent the front of the typhoon attack emergency plan" to develop departmental implementation rules, clear responsibility and specific person in charge, will be determined by the plan of the various tasks of the typhoon break down and implement to the specific person in charge, the formation of horizontal to the vertical to the end of the work of the network and a flexible and efficient liaison and response mechanism.

2. Well-prepared, strong measures. Each department should organize experienced and competent personnel to respond to emergencies according to the typhoon prevention plan. When a strong typhoon strikes the airport head-on or affects the airport, emergency personnel should be assembled at the specified time to be ready for battle, emergency supplies, equipment, transportation tools, etc. arranged to the front line in order to emergency call. Promptly report to the municipal emergency office, contact the socialized reserves of emergency supplies, equipment and tools, etc., to prepare for emergencies.

3. Strengthen alert, timely disposal. Flood and typhoon rescue headquarters office to arrange personnel to grasp and develop the dynamics of the flood situation, encountered ultra-alert, abnormal or dangerous timely report, and seize the organization of evacuation, repair, reinforcement, encountered in emergency situations, in the report of the superiors at the same time, should take the initiative to take emergency measures, seize the favorable opportunity to implement the emergency disposal, eliminate hidden dangers.

4. Emergency duty, smooth communication. After receiving the warning notice of the typhoon attack, the flood control and typhoon rescue headquarters office and departments to implement 24-hour duty system, to keep the information open, the head of each department and the department responsible for the work of typhoon prevention cell phone on day and night, the whole tracking rain, water, wind, disaster and secondary disasters, timely consultation, and according to different situations to start the relevant emergency procedures.

V. Appendix

1. This plan by the airport company is responsible for the interpretation and implementation of the organization. And according to changes in the actual situation and timely revision.

2. This plan is implemented since the date of publication.

Typhoon emergency plan 5

In order to better carry out the implementation of the "safety first, unremitting, prevention-oriented, all-out rescue" approach to flood control, to ensure the safety of teachers and students, and to strengthen the awareness of the first life, to do the early deployment, early prevention, and effectively implement the school's flood season safety work, to ensure that the whole school teachers and students flood season safety of life and property, hereby formulate the flood season school safety work emergency plan. The development of emergency plans for school safety work during the flood season.

A safe flood preparations

(a) Ideological preparations. Prevention-oriented, establish a sense of prevention and control. Schools must put the lives of teachers and students in the first place, to overcome the paralysis and the mentality of chance, firmly establish the "everything in advance, not in advance is invalid" concept, enhance the sense of urgency and responsibility to do a good job of school flood control work, we must focus on this year's flood season, in accordance with the flood control plan, do a good job before the flood, in the flood, flood, various stages, various aspects of flood control work. Flood control work. Indeed, in-depth investigation, effective rectification, careful deployment, strict precautions to ensure that the school's flood control measures in place.

(ii) organizational readiness. Schools should establish a flood safety inspection responsibility system, clear responsibilities and tasks, do a good job before the arrival of flood safety inspection. Schools should organize the forces and designate a person responsible for the school building walls, drainage ditches and campus surroundings (roads, bridges), etc. to carry out a comprehensive and careful inspection, the inspection should be made a detailed record, especially the existence of hidden dangers, to be registered and summarized, the study of remediation programs, while designating a specific person responsible for the implementation of the program. To be based on the actual school, especially the existence of hidden dangers, targeted development of flood emergency treatment plan, to ensure the practicality of the plan. Specific content includes:

1, the establishment of the school flood rescue work leading group, the list of group members, positions, telephone to be accurate, the division of labor to be clear;

2, to determine the flood warning, alarm methods, such as radio, whistles, and so on, and implement to the person in charge of;

3, the occurrence of emergencies, the way the students evacuate, the direction, routes, locations, etc. to be specific, and Implement a person responsible for;

4, to increase publicity, so that everyone knows;

5, the list of duty personnel, the phone is accurate, to ensure unimpeded.

(C) material preparation. According to the possible danger of rescue requirements, prepared in advance rescue supplies and equipment for emergency use. Strengthen the inspection and supervision of the key parts of the flood season, in the flood season must have enough drainage and repair power, effective prevention of flood emergencies.

Second, the work of responsibility

The principal is the first person responsible for the full implementation of the school flood control work. The whole school staff must obey the command of the school flood control work leading group and work arrangements, no shirking delay work. *** Party members should be the first to take the lead, the courage to bear the burden, play a pioneering role, anxious teachers and students of the urgent, worried about teachers and students of the worry, unity and cooperation, the same boat ****, to overcome the disaster. Functional groups should be fully organized to assist the school and related departments to do a good job in the rescue and relief and aftermath of the work, to do their duty, at the same time should do their own protection work, strengthen self-protection measures. Any disobedience to the command and work arrangements, or irresponsible work, malfeasance, dereliction of duty, resulting in the spread of the disaster and other serious consequences, will be seriously investigated and dealt with, until the legal responsibility.

Third, the organizational leadership

In order to clarify the division of labor, strengthen the leadership, unified command, collaborative action, the establishment of the flood season school rescue work leading group.

Leader:

Deputy Leader:

Members:

Tasks: When the flood season occurs, the organization of the following five working groups in a timely manner, the deployment of rescue, rescue, relief and other related work.

The following five working groups, their composition and tasks are as follows:

(a) rescue group

Group Leader:

Member:

Tasks: After the emergence of danger, must be rushed to the scene within the first hour, the organization and command of the risk of elimination and control of dangerous situations.

(b) rescue group

Group leader Li Fuhuan

Members:

Task: responsible for contact with the county people's hospital, county hospital, county maternal and child health hospitals and other hospitals, coordination, cooperation, *** with the organization of the medical ambulance team, rescue the injured.

(C) rescue and evacuation group

Leader:

Members:

Task: Responsible for organizing and directing the evacuation of threatened people and important materials at the scene.

(D) security group

Group Leader:

Members:

Tasks: to contact the local police station to send police and assist in the periphery of the disaster site guard, vigilance, maintenance of order on the scene, to prevent unruly elements from entering the scene to sabotage.

(E) logistics support group

Group Leader:

Members:

Tasks: to ensure the supply of materials and provide the necessary tools, mobilize transport vehicles, transport emergency personnel and materials.

Fourth, emergency response

(a) the school should strictly implement the duty duty responsibility system, the establishment of the school flood reporting system, in accordance with the principle of early discovery, early reporting, early disposal, once found that the flood should be immediately start the school's emergency response to floods, and timely report to the County Board of Education (b) after the occurrence of floods, the school office and the security The office should be timely and accurate to do a good job at the scene of the information collection and processing work (including stranded, injured people, the situation of the materials at the scene of the flood and the scene around the homes, facilities, rescue teams in place and rescue supplies needs, etc.), and in writing or by phone in the form of timely report to the County Board of Education.

V. Emergency security

(a) Schools should be equipped with a certain number of emergency supplies and equipment according to the relevant provisions of the school should be equipped with the necessary emergency drugs.

(ii) is not allowed in the rainy weather in the outdoor classes or organize a variety of outdoor activities, in case of school hours to listen to the school's arrangements and instructions, anyone any class shall not make private decisions. If necessary, notify the parents of students to school to pick up students, especially home via the Loop students must notify parents to school to pick up.

(C) to strengthen the teachers and staff of the flood safety education, know the flood escape and self-help measures and skills, the school should be in accordance with the requirements of the school's emergency plan for flood safety work to organize teachers and students to carry out the necessary drills.

(4) school classes should strengthen the following situations for serious and detailed investigation, found hidden dangers to take timely measures to be eliminated: classrooms and various functional rooms and other premises safety; student food hygiene, sanitation and disinfection equipment equipped; school stairs, corridors, guardrails, fences, windows and doors, toilets, physical education facilities safety; gathering places of evacuation routes, safety exit The situation; electrical appliances, equipment, line maintenance management; school ditches and campus around the ditches, culverts, smooth situation; students to and from the lot of safety.

Six, post-disposal

Flood school rescue leading group is responsible for post-disaster disposal work, timely investigation of the disaster damage, and the formation of written materials reported, do a good job in the post-disaster processing, the return to normal order and reconstruction of the work.

Typhoon Emergency Plan 6

In order to do a good job of typhoon prevention, now the "Grand Hotel Typhoon Emergency Plan" re-revised and issued, please follow the implementation of the hotel.

First, the organization and responsibilities

The hotel set up a flood and typhoon emergency command, the typhoon came when the command of the various organizations members must immediately do a good job in the hotel flood and typhoon response and duty. The organization is as follows:

Commander-in-chief: hotel executive general manager

Deputy commander-in-chief: the hotel in charge of security work of the chief assistant

Member units: guest rooms, catering, front office, engineering, security, finance

Second, typhoon procedures

(a) the typhoon before the self-examination Preparation

1, the front office: the collection of the main entrance banner and the main entrance of the lanterns and other decorations and POP notice boards; lobby or elevator entrance placed typhoon information notice boards, and ready to typhoon reminder card to the Department of Rooms with the room; ready to prepare umbrellas and rain gear, the front office of the staff should be aware of the typhoon information, and timely answers to guest inquiries, ready to the front desk emergency lighting, the lobby assistant should be scheduled in the lobby The company's main goal is to ensure the normal business order of the front office by focusing on the customer's inquiries and reporting the situation at the entrance and the lobby.

2, Rooms Department, Food and Beverage Department, Finance Department: check the closure of each room, box, aisle and hallway doors and windows; do a good job on the guest of the typhoon notification Rooms Department should be the typhoon reminder card with the room; prepare emergency lighting;

3, switchboard: responsible for understanding the typhoon situation in a timely manner to report to the leadership of the hotel and the relevant departments responsible for the preparations for the emergency lighting, walkie-talkie, and to check the switchboard Backup power supply is normal operation, and under the guidance of the department manager to do a good job in the power outage emergency services, and do a good job of the guest's inquiry service.

4, each department should be prepared 1 day in advance to report the loss of fabrics, in order to emergency use.

5, by the Engineering Department of the hotel perimeter, platforms, neon lights, billboards, satellite receivers, business departments and tenants of the doors and windows of a comprehensive inspection with wire, rope, stakes and other reinforcement of the unsound suspension should be temporarily removed. Check the underground electric room engine room and other important parts, do a good job of reinforcing the hotel door, and cut off the possibility of short-circuit triggered a fire in the circuit, the pool should be filled with water to ensure that the hotel's normal supply of water, electricity, gas, ready to prepare enough sandbags.

6, the general office is responsible for the typhoon information conveyed to all employees in all departments, and arrange for the head of each department to stay on duty.

7, the security department notified the dormitory security guards to prepare for duty, and with the engineering department to check the hotel periphery, roof and other key parts of the sewers, guttering is smooth, prepare lighting appliances and rain shoes and raincoats, safety helmets, flashlights, emergency lights, and so on.

(ii) review: by the General Office, Engineering Department, the head of the Security Department in accordance with the above terms of the preparation of each department to review.

(C) the wind is strong when the emergency procedures should be initiated:

1, the security department, the head of the engineering department should stay in the hotel at any time to deal with unexpected danger, to ensure that enough manpower and material resources to do a good job of repair and remedial work.

2, guest rooms, private rooms, cloth, liquor, food warehouse if there is water seepage, the department should immediately transfer the contents of the room to a safe place, the Ministry of Engineering to do a good job of plugging the leakage and drainage work.

3, the front door of the rain may backflow into the lobby, the security department, the engineering department will sandbags piled up at the door to prevent the inflow of PA class is responsible for additional manpower to remove the water.

4, the back door of the rain may backflow into the staff elevator, the security department, the engineering department will sandbags piled up in the back door to prevent inflow, the back door post security guards are responsible for the removal of water, such as rain has been to the elevator backflow, the engineering department should immediately control the elevator in the elevator above the floor of the 1F, prohibited to allow the elevator to run to the -1F - 2F.

5, the wind When the wind is very strong, the front door and the back door should be reinforced with wooden plugs and boards to prevent the glass door from being blown by the wind, and the reinforcement should be appropriate to keep part of the glass door open to reduce the resistance of the wind to the glass door, and the glass of the front door should be watched by the baggage handlers and the foreman of the security department*** with the same watchman. The back door glass is guarded by the security guard at the back door.

6, when the wind is very strong, the gate post security guards baggage should pay attention to falling objects and guide the guest vehicles parked in the underground garage, if necessary, wear a helmet, the front office should be placed on the front desk desk lamps, flower pots, etc. put away, so as not to be blown over.

7, if there is water in the elevator, the engineering department should immediately start the drainage system to remove the water, in order to avoid if the wind is strong, resulting in the passenger elevator can not run, the restaurant screen should be pushed to the elevator entrance to cover.

8, when encountering a power outage, the Engineering Department immediately contacted the property office to generate power to restore lighting. The Security Department maintains the hotel security order during a power outage. When the power outage restaurant cashier by the restaurant management personnel responsible for in place to guard, the main desk cashier by the Security Department, the front gate post and 02 or 01 guard. Lobby assistant manager, should do a good job of passenger elevator service, query whether the guests were off the ladder, do a good job of being off the passenger elevator guests appeasement, floor workers and managers of various departments should be dispersed to the various floors, restaurants to guests to do a good job of explaining and appeasing the work.

9, gutter blockage, by the Ministry of Engineering, the Ministry of Security *** with the people to be sent to unblocking, unblocking personnel should pay attention to their own safety, must wear a helmet, if necessary, should be tied to the safety rope, by two people a front and a back *** with the operation. Attention should be paid to the roof equipment layer of electrical equipment whether there is a leakage phenomenon.

10, the wind is very large, the office should be responsible for notifying the dormitory employees are prohibited from going out, in the store outside of the staff should be arranged to stay in the hotel, the office and the departments responsible for the office should be dissuaded from leaving work employees are not allowed to leave the hotel, the office should be a good arrangement for food and accommodation for the employees who are stranded.

11, the switchboard is responsible for understanding through the TV, timely report to the head of each department of the typhoon situation, such as airports, highways, bridges closed information should be reported to the front office in a timely manner, the front office should be timely to the guests of the hotel notice.

12, the typhoon larger hotel executive general manager, engineering manager, security manager, should stay in the hotel to make emergency preparations, other department managers whether to stay in the hotel should be based on the hotel arrangements, such as leaving the hotel should be reported to the hotel executive for approval.

(d) After the typhoon has caused the loss of the hotel, the departments should be summarized within two days to report the loss.

;