Environmental protection procedures for small workshops

Legal analysis: 1. Enterprises and qualified EIA units to sign the EIA technical commissioning contract, the unit to prepare the EIA report and qualification. 2. and then by the business representatives to the environmental protection department, the environmental protection department will give the EIA opinion, the unit needs to be modified according to the EIA opinion and qualification. 3. and then send the modified document to the environmental protection department, the Environmental Protection Agency management section received the EIA report, will go to the site for inspection. 4. After the submission of the EIA report, will go to the site to carry out investigations. 4. The next is the approval of the EIA report, the EPA monitoring station for acceptance, if the approval of the approval can be obtained after the approval of the document.

Legal basis: "Chinese People's **** and State Environmental Protection Law"

Article 40 The State promotes cleaner production and resource recycling.

The relevant departments of the State Council and local people's governments at all levels shall take measures to promote the production and use of clean energy.

Enterprises shall give priority to the use of clean energy, the use of high resource utilization, low pollutant emissions of technology, equipment and comprehensive utilization of waste and harmless treatment of pollutants to reduce the generation of pollutants.

Article 42 Enterprises, institutions and other producers and operators that emit pollutants shall take measures to prevent and control the pollution and hazards to the environment caused by waste gas, waste water, waste residue, medical waste, dust, malodorous gases, radioactive substances, and noise, vibration, optical radiation and electromagnetic radiation generated in the course of production and construction or other activities.

Enterprises and institutions that emit pollutants should establish an environmental protection responsibility system to clarify the responsibilities of unit heads and relevant personnel.

The key emission units should be in accordance with the relevant provisions of the state and monitoring specifications for the installation and use of monitoring equipment, to ensure the normal operation of monitoring equipment, save the original monitoring records.

It is strictly prohibited to discharge pollutants illegally through concealed pipes, seepage wells, seepage pits, irrigation or tampering, falsification of monitoring data, or improper operation of pollution prevention and control facilities to avoid supervision.