The second step is to unload the core by heating it with a hairdryer;
The third step is to remove each coil, paying attention to the order of the windings and the number of turns, although the general machine windings are in a single direction, but it is also necessary to pay attention to the direction of the winding;
The fourth step is to measure the diameter of the wire of each coil.