Macheng people's hospital building
In order to completely improve the hospitalization conditions of patients, the hospital seized the opportunity to overcome various difficulties and decided to build a new inpatient building. The project lasted for 23 months from May 2006 to April 2008, and has been successfully completed and put into use. Newly-built inpatient building15th floor, north-south, with a total construction area of 21500m2 and a total area of1800m2, with a total investment of nearly 60 million yuan. Planning and design completely follow the guiding principle of "people-oriented". 12 ward, 18 clinical specialties: cardiology, icu ward, neurology, gastroenterology, respiratory medicine, pediatrics (neonatology), urology, thoracic surgery, orthopedics, gynecology, obstetrics, anesthesiology (operating room), general surgery, neurosurgery, oncology, ophthalmology, otolaryngology. There are 440 beds, single rooms, double rooms and multiple rooms in the ward, and a certain number of special wards, namely vip wards, are set up to build a laminar flow purification operating room. There is a toilet, which is equipped with three systems, such as central air conditioning, central call and central suction, and integrated with computer, telephone, television, monitoring and other networks, equipped with strong and weak electricity systems, sewage and sewage treatment systems, and set up five elevators. According to the norms of modern hospital construction, people flow and logistics are separated, and hospitalization conditions are completely improved.